Loading...
Fire Comments.docx Fire Comments DATE: 06/28/2019 JOB NAME/ADDRESS:Edmonds Modular PRE20190004 CONTACTS:Todd Madison, John Morefield, Johnny Vong toddmadison@hotmail.com; john.morefield@jacksonmain.com; johnnyvong@gmail.com FIRE COMMENT NOTES: Be aware of Fire Lane Standards including but not limited to turning radii, required height and lane width. Show proposed turn around on building plan submittal Over head power appears to be underground on Highway 99 and needs to be underground on 236thSt SW or over 13’6” above fire lane entrance on 236th St SW Location of sprinkler riser room. Riser room will have an outside entrance. Call out on building plans Location of FDC will be approved by South County Fire and be within 50 feet of a Fire Hydrant. Call out on building plans Testing will need to be performed at site prior to construction and during construction to determine the need for a DAS (Distributive Antennae System) Separate permits for Fire alarm, DAS and for fire sprinklers Standpipe per IFC section 3313 completed to the floor below the next modular. Fire determines height for high rise by IFC definition “occupied floor located more than 75’ above the lowest level of fire department vehicle access.” Elevators are a required accessible means of egress per IFC 1009.4 and standby/emergency power per IFC 604. “Tapping ahead of the main” is not an acceptable practice in South Snohomish County Fire and Rescue response area. Generators need to be UL approved. Fire flow appears to be 2,375 GPM for a 2 hour duration (This is with sprinkler deduction at 75%) and 3 hydrants are needed to be within 225 feet of and/or located on project site. Any vaults or underground retention will need to meet or exceed HS20 standards for a point load of 75,000 # Please feel free to contact me with any further questions Thank you,   Karl Fitterer CFI, FPE Assistant Fire Marshal Fire Prevention Services 121 5th Ave N Edmonds, WA 98020 O: (425)771-0213 VM: (425)551-1980 kfitterer@southsnofire.org