Loading...
FIRE REVISION COMMENTS 1.doc MEMORANDUM Date:September 26, 2007 Development Services Lead Theresa Umbaugh To: From:Fire Marshal John J. Westfall 425.771.0213 th Subject:BLD20070916 Summit Cardiology TI 7315 212 St SW #xxx The following pre-application has been evaluated under the 2003 International and Edmonds Community Development Codes. Additional accommodations may be required as additional information is provided. Existing structure is fully fire sprinklered & automatic fire alarmed. Building addition/remodel permit is approved outstanding. 1. Provide suite # for tenant space along with plan for building addressing. Fire Prevention Program Superintendent 2. Callout with 24 hour emergency phone number for site. That person will have the responsibility for demolition and construction safety while building is open to public and authority to stop work and make proper notifications and corrections for any emergency, environmental, or hazardous materials concern. 3. Sheet A0.4 Maintain temporary exits by extending fire alarm system, illuminating temporary exits/egress paths, prohibiting construction storage, and minimizing environmental hazards along entire path of egress. Exits are required on first floor phasing plan placed a distance apart not less than one-half of the diagonal building length. 4. Required (deferred) permits/submittals include: 4.1. Fire Sprinkler system modification permit 4.2. Fire Alarm modification permit 4.3. Fire Protection Footprint (example attached). 5. Changes in tenant space affect approved plans BLD20061195. Corrections here may affect main building permit and plans must be corrected and approved accordingly. 6. Sheet A0.3 & A2.1 Make clear TI affects “SECOND” floor plans. 7. Sheets A0.3, A2.1, A2.3 Call out all areas in permit and label all spaces called out, including mechanical and electrical work. City of Edmonds Fire Marshal   8. Show portable fire extinguishers throughout and provide new FEs rated minimum 2A:10B:C. 9. Show exit light and emergency illumination locations. 10. Callout medical gas piping installation and requirement for special inspection. Cc: Architect dand@salmon-bay.com Facility Planner johnc@salmon-bay.com Assistant Building Official Ann Bullis