Former Woodway HS close-out memo DAD - updated 050119.pdfWETHERHOLT AND ASSOCIATES, I N C.
May 1, 2019
Project No.: 9501-10136
Building Permit #BLD20180423
Edmonds School District #15
20420 68th Avenue West
Lynnwood, Washington 98036-7400
Attn : Nick Chou
Cc: Calvin Gasaway, Greene Gasaway Architects
Ref: Updated Closeout Letter — Reroofing Inspections
Former Woodway High School, Phase III
23200 100th Ave West
Edmonds, Washington
Greetings,
Phone: 425-431-7161
Email: choun@edmonds.wednet.edu
Email: Calvin@greenegasaway.com
At the request of Edmonds School District and Bayley Construction, we are providing this updated closeout
letter for reroofing inspections performed at the Former Woodway High School project during the summer of
2018.
The scope of the reroofing project included installation of a new roof assembly after removal of the existing roof
membrane at buildings B1, B2, D, E, F, G and H. Fall protection anchors were installed at all buildings,
including buildings A and C.
Wetherholt and Associates, Inc. performed part time roofing inspection at the Former Woodway High School
project between June 25, 2018 and October 19, 2018. Forty-two (42) separate field reports were prepared, one
for each site visit, documenting observed progress and noted issues. To the best of our knowledge, the roofing
related work that we inspected was generally installed compliant with the project documents and manufacturer's
requirements.
We trust this memo is of assistance. If you have any questions or if we may be of further service, please do not
hesitate to call.
Respectfully,
Don Davis, RRC/RWC/REWC/RBEC
Senior Field Engineer, Wetherholt and Associates, Inc.