Loading...
Former Woodway HS close-out memo DAD - updated 050119.pdfWETHERHOLT AND ASSOCIATES, I N C. May 1, 2019 Project No.: 9501-10136 Building Permit #BLD20180423 Edmonds School District #15 20420 68th Avenue West Lynnwood, Washington 98036-7400 Attn : Nick Chou Cc: Calvin Gasaway, Greene Gasaway Architects Ref: Updated Closeout Letter — Reroofing Inspections Former Woodway High School, Phase III 23200 100th Ave West Edmonds, Washington Greetings, Phone: 425-431-7161 Email: choun@edmonds.wednet.edu Email: Calvin@greenegasaway.com At the request of Edmonds School District and Bayley Construction, we are providing this updated closeout letter for reroofing inspections performed at the Former Woodway High School project during the summer of 2018. The scope of the reroofing project included installation of a new roof assembly after removal of the existing roof membrane at buildings B1, B2, D, E, F, G and H. Fall protection anchors were installed at all buildings, including buildings A and C. Wetherholt and Associates, Inc. performed part time roofing inspection at the Former Woodway High School project between June 25, 2018 and October 19, 2018. Forty-two (42) separate field reports were prepared, one for each site visit, documenting observed progress and noted issues. To the best of our knowledge, the roofing related work that we inspected was generally installed compliant with the project documents and manufacturer's requirements. We trust this memo is of assistance. If you have any questions or if we may be of further service, please do not hesitate to call. Respectfully, Don Davis, RRC/RWC/REWC/RBEC Senior Field Engineer, Wetherholt and Associates, Inc. m: linspections former woodway hs ph 3 former woodway hs close-out memo dad -updated 050119.doc 14715 N.E. 95t" Street, Ste 100 • Redmond, WA 98052 Phone:425-822-8397 • Fax:425-822-7595