Fritschen_Drainage Comments_1.pdf DATE: July 31, 2009 TO: Eric Anderson eanderson@hwageo.com FROM: Jeanie McConnell, Engineering Program Manager RE: Plan Check #: BLD20090376 Project: Fritschen – SFR th Project Address: 16319 75 Pl W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Theresa Umbaugh. In review of the proposed storm detention system and the storm detention system previously constructed with the Pearson development, it has been determined that the drainage system could be approved as submitted if the following is provided: A downstream analysis of the stormwater system. This analysis shall begin at the · point where the site's stormwater enters the City system and extends 1/4-mile downstream or to Puget Sound, whichever comes first. It should include an evaluation of erosion, slope stability, and drainage impacts that may be caused or aggravated by a proposed project, and propose measures for preventing impacts and for not aggravating existing impacts (if any). This shall include a capacity analysisof the entire downstream system, including other areas that drain to it and through the culvert under the BNSF tracks. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections.