FW Swank project.msg
IPM.Note
FW: Swank project
FW:
Wayland, Christina
Zulauf, JoAnne
Wayland, Christina
EX
/O=CITY OF EDMONDS/OU=EDMONDS/CN=RECIPIENTS/CN=ZULAUF
Swank project
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=WAYLAND, CHRISTINA7F0
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=WAYLAND, CHRISTINA7F0
Received: from EDMSVR-EXCH02.edmonds.local ([::1]) by
EDMSVR-EXCH02.edmonds.local ([::1]) with mapi id 14.03.0439.000; Wed, 3 Apr
2019 09:02:16 -0700
Content-Type: application/ms-tnef; name="winmail.dat"
Content-Transfer-Encoding: binary
From: "Zulauf, JoAnne" <JoAnne.Zulauf@edmondswa.gov>
To: "Wayland, Christina" <Christina.Wayland@edmondswa.gov>, "Carter, Eric"
<Eric.Carter@edmondswa.gov>
Subject: FW: Swank project
Thread-Topic: Swank project
Thread-Index: AdTqNL0EtOMAIvt7So2fqjwO/Rt59gAAdaEw
Date: Wed, 3 Apr 2019 09:02:15 -0700
Message-ID: <E22D1C13C234F74D8EDBCB45380D171B013561A834@EDMSVR-EXCH02.edmonds.local>
References: <E22D1C13C234F74D8EDBCB45380D171B013561A81B@EDMSVR-EXCH02.edmonds.local>
In-Reply-To: <E22D1C13C234F74D8EDBCB45380D171B013561A81B@EDMSVR-EXCH02.edmonds.local>
Accept-Language: en-US
Content-Language: en-US
X-MS-Has-Attach:
X-MS-Exchange-Organization-SCL: -1
X-MS-TNEF-Correlator: <E22D1C13C234F74D8EDBCB45380D171B013561A834@EDMSVR-EXCH02.edmonds.local>
x-vipre-scanned: 1D4F13990121A61D4F14E6
MIME-Version: 1.0
X-MS-Exchange-Organization-AuthSource: EDMSVR-EXCH02.edmonds.local
X-MS-Exchange-Organization-AuthAs: Internal
X-MS-Exchange-Organization-AuthMechanism: 04
X-Originating-IP: [10.10.5.104]
Zulauf, JoAnne
EX
/O=CITY OF EDMONDS/OU=EDMONDS/CN=RECIPIENTS/CN=ZULAUF
Wayland, Christina; Carter, Eric
Swank project
fyi
From: Zulauf, JoAnne
Sent: Wednesday, April 3, 2019 8:57 AM
To: 'ldgroup1@qwestoffice.net' <ldgroup1@qwestoffice.net>
Subject: Swank project
Hi Tom,
The Building plans examiner has determined that due to the number of fixtures, the water meter needs to be upsized to a 1”.
The additional cost of going from a ¾” meter to a 1” meter are the meter cost $2970 and the upgrade to the higher connection fee $12,624 less the current connection $5050 for a total
connection fee of $7574.
So the total cost will be $10,544.
There are two options at this point:
1—I can redline the plans to show the new meter requirement and add the fees to the permit—and the permit will then be ready to issue, or
2—You can contact the plans examiner, Eric Carter, and discuss how the fixtures can be reduced so that the ¾” meter can be retained.
Eric can be reached at 425-771-0220.
Please let me know how you would like to proceed.
Thank you.
JoAnne Zulauf | Senior Engineering Technician
Engineering Division | City of Edmonds
121 5th Ave N | Edmonds, WA 98020
425.771.0220 x 1324
Joanne.Zulauf@edmondswa.gov
<E22D1C13C234F74D8EDBCB45380D171B013561A834@EDMSVR-EXCH02.edmonds.local>
<E22D1C13C234F74D8EDBCB45380D171B013561A81B@EDMSVR-EXCH02.edmonds.local>
<E22D1C13C234F74D8EDBCB45380D171B013561A81B@EDMSVR-EXCH02.edmonds.local>
Wayland, Christina
Wayland, Christina
EX
/o=City of Edmonds/ou=EDMONDS/cn=Recipients/cn=Zulauf
JoAnne.Zulauf@edmondswa.gov
JoAnne.Zulauf@edmondswa.gov
JoAnne.Zulauf@edmondswa.gov
Swank project
Follow up
16.0
en-US
EDMSVR-EXCH02.edmonds.local
Internal
04
II=01D4EA34BD04B4E30022FB7B4A8D9FAA3C0EFD1B79F6000075A130;SBMID=1;SBT=1;THA=2100809219;FIXUP=10.8148;Version=Version 14.3 (Build 439.0), Stage=H7
IPM.Note
5555555
1D4F13990121A61D4F14E6
Christina.Wayland@edmondswa.gov
00000003/o=City of Edmonds/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=Wayland, Christina7f0
Wayland, Christina
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Wayland, Christina7f0
Christina.Wayland@edmondswa.gov
christina.wayland
Wayland, Christina
Carter, Eric
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Carter, Eric7ec
Eric.Carter@edmondswa.gov
eric.carter
Carter, Eric
fyi
From: Zulauf, JoAnne
Sent: Wednesday, April 3, 2019 8:57 AM
To: 'ldgroup1@qwestoffice.net' <ldgroup1@qwestoffice.net>
Subject: Swank project
Hi Tom,
The Building plans examiner has determined that due to the number of fixtures, the water meter needs to be upsized to a 1”.
The additional cost of going from a ¾” meter to a 1” meter are the meter cost $2970 and the upgrade to the higher connection fee $12,624 less the current connection $5050 for a total
connection fee of $7574.
So the total cost will be $10,544.
There are two options at this point:
1—I can redline the plans to show the new meter requirement and add the fees to the permit—and the permit will then be ready to issue, or
2—You can contact the plans examiner, Eric Carter, and discuss how the fixtures can be reduced so that the ¾” meter can be retained.
Eric can be reached at 425-771-0220.
Please let me know how you would like to proceed.
Thank you.
JoAnne Zulauf | Senior Engineering Technician
Engineering Division | City of Edmonds
121 5th Ave N | Edmonds, WA 98020
425.771.0220 x 1324
HYPERLINK "mailto:Joanne.Zulauf@edmondswa.gov"Joanne.Zulauf@edmondswa.gov