Loading...
FW Swank project (2).msg IPM.Note FW: Swank project FW: Wayland, Christina Zulauf, JoAnne Wayland, Christina EX /O=CITY OF EDMONDS/OU=EDMONDS/CN=RECIPIENTS/CN=ZULAUF Swank project EX /O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=WAYLAND, CHRISTINA7F0 EX /O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=WAYLAND, CHRISTINA7F0 Received: from EDMSVR-EXCH02.edmonds.local ([::1]) by EDMSVR-EXCH02.edmonds.local ([::1]) with mapi id 14.03.0439.000; Wed, 3 Apr 2019 09:02:16 -0700 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: "Zulauf, JoAnne" <JoAnne.Zulauf@edmondswa.gov> To: "Wayland, Christina" <Christina.Wayland@edmondswa.gov>, "Carter, Eric" <Eric.Carter@edmondswa.gov> Subject: FW: Swank project Thread-Topic: Swank project Thread-Index: AdTqNL0EtOMAIvt7So2fqjwO/Rt59gAAdaEw Date: Wed, 3 Apr 2019 09:02:15 -0700 Message-ID: <E22D1C13C234F74D8EDBCB45380D171B013561A834@EDMSVR-EXCH02.edmonds.local> References: <E22D1C13C234F74D8EDBCB45380D171B013561A81B@EDMSVR-EXCH02.edmonds.local> In-Reply-To: <E22D1C13C234F74D8EDBCB45380D171B013561A81B@EDMSVR-EXCH02.edmonds.local> Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: X-MS-Exchange-Organization-SCL: -1 X-MS-TNEF-Correlator: <E22D1C13C234F74D8EDBCB45380D171B013561A834@EDMSVR-EXCH02.edmonds.local> x-vipre-scanned: 1D4F13990121A61D4F14E6 MIME-Version: 1.0 X-MS-Exchange-Organization-AuthSource: EDMSVR-EXCH02.edmonds.local X-MS-Exchange-Organization-AuthAs: Internal X-MS-Exchange-Organization-AuthMechanism: 04 X-Originating-IP: [10.10.5.104] Zulauf, JoAnne EX /O=CITY OF EDMONDS/OU=EDMONDS/CN=RECIPIENTS/CN=ZULAUF Wayland, Christina; Carter, Eric Swank project fyi From: Zulauf, JoAnne Sent: Wednesday, April 3, 2019 8:57 AM To: 'ldgroup1@qwestoffice.net' <ldgroup1@qwestoffice.net> Subject: Swank project Hi Tom, The Building plans examiner has determined that due to the number of fixtures, the water meter needs to be upsized to a 1”. The additional cost of going from a ¾” meter to a 1” meter are the meter cost $2970 and the upgrade to the higher connection fee $12,624 less the current connection $5050 for a total connection fee of $7574. So the total cost will be $10,544. There are two options at this point: 1—I can redline the plans to show the new meter requirement and add the fees to the permit—and the permit will then be ready to issue, or 2—You can contact the plans examiner, Eric Carter, and discuss how the fixtures can be reduced so that the ¾” meter can be retained. Eric can be reached at 425-771-0220. Please let me know how you would like to proceed. Thank you. JoAnne Zulauf | Senior Engineering Technician Engineering Division | City of Edmonds 121 5th Ave N | Edmonds, WA 98020 425.771.0220 x 1324 Joanne.Zulauf@edmondswa.gov <E22D1C13C234F74D8EDBCB45380D171B013561A834@EDMSVR-EXCH02.edmonds.local> <E22D1C13C234F74D8EDBCB45380D171B013561A81B@EDMSVR-EXCH02.edmonds.local> <E22D1C13C234F74D8EDBCB45380D171B013561A81B@EDMSVR-EXCH02.edmonds.local> Wayland, Christina Wayland, Christina EX /o=City of Edmonds/ou=EDMONDS/cn=Recipients/cn=Zulauf JoAnne.Zulauf@edmondswa.gov JoAnne.Zulauf@edmondswa.gov JoAnne.Zulauf@edmondswa.gov Swank project Follow up 16.0 en-US EDMSVR-EXCH02.edmonds.local Internal 04 II=01D4EA34BD04B4E30022FB7B4A8D9FAA3C0EFD1B79F6000075A130;SBMID=1;SBT=1;THA=2100809219;FIXUP=10.8148;Version=Version 14.3 (Build 439.0), Stage=H7 IPM.Note 5555555 1D4F13990121A61D4F14E6 Christina.Wayland@edmondswa.gov 00000003/o=City of Edmonds/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=Wayland, Christina7f0 Wayland, Christina EX /O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Wayland, Christina7f0 Christina.Wayland@edmondswa.gov christina.wayland Wayland, Christina Carter, Eric EX /O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Carter, Eric7ec Eric.Carter@edmondswa.gov eric.carter Carter, Eric fyi   From: Zulauf, JoAnne Sent: Wednesday, April 3, 2019 8:57 AM To: 'ldgroup1@qwestoffice.net' <ldgroup1@qwestoffice.net> Subject: Swank project   Hi Tom,   The Building plans examiner has determined that due to the number of fixtures, the water meter needs to be upsized to a 1”. The additional cost of going from a ¾” meter to a 1” meter are the meter cost $2970 and the upgrade to the higher connection fee $12,624 less the current connection $5050 for a total connection fee of $7574.   So the total cost will be $10,544.   There are two options at this point: 1—I can redline the plans to show the new meter requirement and add the fees to the permit—and the permit will then be ready to issue, or 2—You can contact the plans examiner, Eric Carter, and discuss how the fixtures can be reduced so that the ¾” meter can be retained. Eric can be reached at 425-771-0220.   Please let me know how you would like to proceed.   Thank you.   JoAnne Zulauf | Senior Engineering Technician Engineering Division | City of Edmonds 121 5th Ave N | Edmonds, WA 98020 425.771.0220   x 1324 HYPERLINK "mailto:Joanne.Zulauf@edmondswa.gov"Joanne.Zulauf@edmondswa.gov