FW_ ENG20130305.pdf
From:Rivera, Chris
To:"smalltractorservicellc@live.com"
Cc:Zulauf, JoAnne
Subject:FW: ENG20130305
Date:Thursday, May 07, 2015 4:44:03 PM
Chris,
The listed items below will need to be completed prior to Right of Way permit sign-off.
1. Driveway approach will need to be paved meeting the city right of way (asphalt road) with a clean
cut.
2. An Encroachment Permit is required for any encroach into the right of way, such as fence,
retaining wall, etc. Submit a plan showing right of way line and location of these improvements as
well as an encroachment permit if needed. Refer to City handout E26 (attached).
3. Gravel within the right of way adjacent to the travel lane will need to be removed and
turf/landscape re-installed. Offsite parking (parking within the right of way) will be limited to vehicle
access from the paved approach. Stormwater flow from these proposed impervious surfaces to the
site would be permitted by the city, though we will need verification from the county that this will
be acceptable.
If you have any questions, please feel free to contact me.
Thank you,
Chris B. Rivera
Engineering Technician
City of Edmonds
425.771.0220 ext. 1339
From: Zulauf, JoAnne
Sent: Wednesday, May 06, 2015 3:13 PM
To: 'chris sheehan'
Cc: Rivera, Chris
Subject: RE: ENG20130305
Hi Chris,
I am forwarding your request to Chris Rivera who performed the inspection last week.
He will be responding to you shortly.
Thank you!
JoAnne
From: chris sheehan \[mailto:smalltractorservicellc@live.com\]
Sent: Wednesday, May 06, 2015 3:11 PM
To: Zulauf, JoAnne
;hoppers@reagan.com
Cc:gary.hopper005@gmail.com
Subject: ENG20130305
Joanne,
Checking to see where our request of right of way landscape approval for the plat of
Esperance, in the City of Edmonds is at this time, I met with your inspector last week,
checking in to see the progress of our request.
thank you in advance for your assistance.
Chris
Chris Sheehan
206-948-2316
Smalltractorservicellc@live.com