Loading...
Geotech Letter.pdfLIU & ASSOCIATES, INC. GeotechmEngineering cal E �i Engineering _ En ineenn Geology August 16, 2017 Mr. Joe Smeby Omega Engineering, Inc. 2707 Wetmore Avenue Everett, WA 98201 Dear Mr. Smeby: Subject: Design Plans Review Ritter Short Plat 8364 Olympic View Drive Edmonds, Washington L&A Job No. 5A112 Earth Science At your request, we have completed a geotechnical review of the design plans for the subject project. It is our opinion that the design plans are substantially in compliance with the recommendations in our 9/26/2005 geotechnical report and subsequent correspondences. Cut banks in surficial loose sand soil in excavation for detention pipe installation may cave suddenly. Therefore, cut banks should be stabilized with shoring blocks during construction. Yours very truly, LIU & ASSOCIATES, INC. J. S. (Julian) Liu, Ph.D., P.E. Principal 19213 Kenlake Place NE • Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 486-2746