Loading...
GeotechInsp.Detention.6.26.14.pdfOTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing Report Number: 277114 Description: Project: Paul Graves Residence Permit Number: BLD20130349 Address: 8028 Cyrus Place, Edmonds Job Number: 13-0592 Client: Doug Johnson Construction, Inc. Client Address: PO Box 1508, Mukilteo, WA 98275 Inspector and Date Remarks Chris Smith We visited the site to evaluate the ins..allation of stormwater detention system for the residence, We 6126114 understand that the system is designed to accommodate stormwater runoff from up to 3,000 square feet of impervious surface. The detention system was designed and constructed per the City of Edmonds Standard Plan. The system is located by the northwest corner of the residence: The drainage system uses two Type 1 L, CB16 catch basins. The catch basins are connected with a 24' long, 24" diameter ABS polyethylene pipe with a 0.5% slope. In the second catch basin there is a PVC control structure with a % inch diameter flow restriction orifice opening. The installed system consisted of the following materials. ® A 24' long, 24 -inch diameter corrugated ABS polyethylene detention pipe had been installed. ® Two Type 1 L, CB16 catch basins ® A IT -13" long 44nch diameter PVC 12364 Type PSM SewerIEGCUT ASTM D3034 pipe. ® A 14'-6" long, 6 Inch SDR35 PVC 12454 ASTM D3034-08 Sewer pipe. Copies to: Owner Contractor Architect X Building Dept. Technical Responsibility: Engineer Anthony Coyne for Engineer This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau & Associates, Inc, production of this report, except in full, without written permission from our firm is strictly prohibited. Page 1 of 6747 M.L. King Way S., Seattle, Washington 98118 N Phone (206) 725.4600 or 1-888-OTTO-4-ISS - Fax (206) 723-2221 Form No.: ADMIN -100-01 (Rev 01105)