Loading...
Gibson Traffic Comment Response Memo 20190715_Resub (2).pdfCOMMENT RESPONSE To: Bertrand Hauss, Transportation Engineer — City of Edmonds From: Matthew Palmer, PE %tv Subject: Comment Response Project: 22810 Edmonds Way, City of Edmonds No. PLN20190003, GTC #19-071 Date: July 12, 2019 This response memorandum is to provide additional information to address the comments in the Letter of Completeness and Request of Additional Information dated May 30, 2019. The City comment was provided in bold with the responses to follow. • Provide confirmation that Gibson Traffic Consultants prepared the TIA based on the current proposal. The Site plan included in the packet does not include reconfiguration of the ingress/egress lanes at SR-104. The latest layout is included in the attachments. The plan doesn't change the analysis as there is still a single outbound lane and Synchro doesn't account for two receiving lanes. The advantage of the second receiving lane is in case an inbound vehicle is blocked by an outgoing vehicle. • Under the Project Description it is noted that the existing c-curbing will be removed; however, a c-curb will still be required although the configuration will be modified over the existing condition. Please revise. The c-curbing is included in the updated layout and extends for approximately 20 feet. Revise the report to include signal detection requirements — verification of existing placement/requirement to relocate. Verification of existing signal detection is addressed by others. From the level of service analysis, the northbound 95th percentile queue with the development is less than 20 feet. With a future volume of 15 vehicles from the signal entering the apartment complex/development the demand of 1 vehicle every 4 minutes would note queue back to SR-104 with the outbound queue being less than 20 feet not blocking the ingress. • Revise the report to address turning movements. Upon entering the access easement area off SR-104, the east ingress lane should be striped to indicate left turns only into the proposed development. In addition, when exiting the proposed development turning movements should be limited to a right -turn only into the access easement area. The updated layout shows the striping from the c-curbing into the proposed development. 2813 Rockefeller Avenue - Suite B - Everett, WA 98201 Tel: 425-339-8266 - Fax: 425-258-2922 - E-mail: info@gibsontraffic.com 22810 Edmonds Way Comment Response • Address sight distance coming out of the proposed development driveway assuming there are vehicles in the parking lot. The development access to the private parking lot/private roadway was looked at for possible sight distance obstructions. Per the latest layout the parking along the east property line that would obstruct the sight distance for an exiting vehicle has been removed. Per a previous comment, the vehicles exiting the development would be limited to right -turn only; therefore, only sight distance to the south would need to be met. Assuming a 15-mph speed within the parking lot the stopping sight distance required is 80 feet from the plans there is more than 100 feet of unobstructed stopping sight distance which would allow for a vehicle to safely stop before interacting with a vehicle going into or out of the proposed development. In section 5.2 Collision Summary, add note that protected LT phasing for EB & WB traffic was added in 2017. This has been noted; it doesn't change the overall summary of the collisions. It would be anticipated that the 5 at angle and 1 opposite direction collisions would be reduced with this signal modification. • Please review Section 7 - Mitigation Recommendations. The current development proposal is apartments, in which case the fee associated with the ITE Land Use 220 for apartments should be applied. This development is not building apartments, we are building town homes. Using the trip generation of 10.08 PM peak -hour trips and the fee of $5,530.21 per PM peak -hour trip is the most appropriate way of calculating the mitigation fees before credit for the single-family unit. Under the code the use of LUC 230, condominium, would be the next closest with a fee of $3,318.13 per unit. Attachments Site Layout A-1 Gibson Traffic Consultants, Inc. July 2017 infoggibsontraffic.com 2 GTC #17-112 a 10¢ (EDrW10NDS WAY m 7s: r'� Isls� l /lww„ �_- am�r� "" II _► I � _ �a NI ,� — qN g Im - 1 1 ua,s�--x �s°'as•w-- ITI � � rnl ,y � r Il5rj5Lwl \ ame jl / It III swA. seam VA\� � i,� \ I I /s�s� \ "y :: \e •I orrrtaws \ I 1 \ •I \ 4 aaB �i \ I \ IJsr •1 W w.rl 59 • \ I ` I i N a \ Aww°w°fir anHw�x w..x«o.l°r®Am rxirmaw�arm, A: a! w \�«6r w m wo%tea awwaa mm ua� A x,nW .am wAtfi sttew[ Au eE mwac'rf° ro a xemmw .ass wAx srv. EXTRUDEDCURBDETAIL ° q N. S. IMPERVIOUS AREAEXHIBIT s° I LOML N.— ALBuew:v wasrcarouOBcr[nPerV N u�UNOARY NOlE: IHE EgSRNG BOUNDARY, rOPOGRAPHY NO AFIWS EXISBNG EEANREs AERE PRONOEO fR lEY CONOUCiEO eY LOVELL-SAUERLANO & ASSOaA1ES MC BURKNNG ANIaf PRON0E11 AO911N AL rOPOGPAPNVOA1A eLwtma rRovxvc UINIlY LOCARAYS ANO AOOIRCNAI E}]siING FEANRES ME- 2�. Know what's below. Call811 two business days before you dig. �2 Nam Aar1) M...) ! (ears Aaas) rl VICINITY MA LEGAL DESCRIPTION SURVEYOR'S NOTE cc ro� a>rN"«Aawl"«mc`waxm,. BASIS°rzOF BEARINGS uwrcs z,sn 1°dz 111AAaApsr � swm ,xa.a-sx«rnrer camn a-sa as rwoxx «s"M0'S°r""W'"�r a a I,wc BENCH MAR Ar mr a As srow sr wmw. «aW., ww xA�«:rNar n«w) IwsmxrurrcmT raAcrxrmx.clmsr PROPERTY INFORMATION: �wAwr»zrssm ms srarz «wcalmm'mv wmw y A, Amzo COVERAGE CALCUL4TIONS o ream.'nam °�e*r pu r.e) n,Ax cONRAtz Au0xm 45s PEre EUc 1630— —1 A Aaa sears°. rr tans A 1 Ji.i6) SF x 15R = 14.015 SF PRamsEB c°uERACE - U— N, PROJECT CONTACT LIST: HEIGHT CALCUL47IONS UTILITY CONTACT LIST aavr oc sawraev sEAEx IXruPlc NEw WATER ffi sxER asTwcr '05R" �`m EONONOB, WA 98026 nN Wa1ER' IXwAR'C NEW WARR ffi SENER aSIwC! - rz ra 9118 22aM SiREEr SW EaIalUB, WA 9&IZ6 (4I5) ll4-1169 � �Y ss�m[x accm�c sNavwlsx couNn P.uB `arum sr� 11018 HIGHWAY 99, rm«¢..(m' �� EaA0N05 98016 arAa.- (15) 6J0.3200 r[otWcu u CAS rOUND ST Rcr H rzmr sr t>Eu£wE, WA Be004 wm�rc"0(uslnr s (42 5) 452-I2 J4 CABLE �45a5r �A� alE A1£ N (877) 24-zz88 fIRE nEPaanENR Bs FIRE asmlcr (san Br) SHEET INDEX: v-SrH A—NGRTx (EUNGNOs arY HALL), EmE uAresNu: (925) 771-c213 sCH00L: EBNONOB sCH00L gsTRMr t �� °'� zazo sera AUE xEsr L 0. WA 98036 (425) 5) 43I-I000 reErus Mcrae RmueLw sERwas APPROVED FOR CONSTRUCTION Iso912- auENUE NE CITY OF EDMONDS U.ENIE, wA. 9800.5 (206) 682-9130 OAIE: By: C- ENGINEERING —SON