Graphic Examples 1-16-15.pdf
MEMORANDUM
Date:January 15, 2015
To: City of Edmonds, Planning Division
Copy: Matt Finch, Edmonds School District
From: Robert Harding, DA Hogan & Associates
Re: Former Woodway High School - Field Improvements
Conditional Use Permit Application (PLN20140067)
Design Review (PLN20140065)
Variance (PLN20140066)
The following photos represent typical images of proposed improvements planned at the Former Woodway
High School Field Improvement project.
1.Elevated/aerial photos of similar facilities
with multiple use fields. Overviews include
synthetic turf with soccer, lacrosse and
baseball/softball.
D.A. Hogan & Associates, Inc. (206) 285-0400 Tel
119 First Ave. S., Suite 110 (206) 285-0480 Fax
Seattle, WA 98104
2.Typical 5 row, non-elevated bleacher system,
and adjacency to backstop/fencing.
3.Typical and similar images of backstop
fencing and netting. Photos indicate
relationship with concrete wall, rubber
padding at backstop and 30’ ht. fence and
netting.
Former Woodway High School
Photo Examples
Page 2 of 5
4.Photo indicates typical outfield fencing at 8’ ht. with fence cap.
5.Typical images of dugout and roofing, from a distance, adjacent to and from within dugout.
Former Woodway High School
Photo Examples
Page 3 of 5
6.Typical images of synthetic turf fields
with light poles/fixtures.
Former Woodway High School
Photo Examples
Page 4 of 5
7.Pervious concrete paving adjacent to field
and dugout.
Former Woodway High School
Photo Examples