Loading...
Graphic Examples 1-16-15.pdf MEMORANDUM Date:January 15, 2015 To: City of Edmonds, Planning Division Copy: Matt Finch, Edmonds School District From: Robert Harding, DA Hogan & Associates Re: Former Woodway High School - Field Improvements Conditional Use Permit Application (PLN20140067) Design Review (PLN20140065) Variance (PLN20140066) The following photos represent typical images of proposed improvements planned at the Former Woodway High School Field Improvement project. 1.Elevated/aerial photos of similar facilities with multiple use fields. Overviews include synthetic turf with soccer, lacrosse and baseball/softball. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 First Ave. S., Suite 110 (206) 285-0480 Fax Seattle, WA 98104 2.Typical 5 row, non-elevated bleacher system, and adjacency to backstop/fencing. 3.Typical and similar images of backstop fencing and netting. Photos indicate relationship with concrete wall, rubber padding at backstop and 30’ ht. fence and netting. Former Woodway High School Photo Examples Page 2 of 5 4.Photo indicates typical outfield fencing at 8’ ht. with fence cap. 5.Typical images of dugout and roofing, from a distance, adjacent to and from within dugout. Former Woodway High School Photo Examples Page 3 of 5 6.Typical images of synthetic turf fields with light poles/fixtures. Former Woodway High School Photo Examples Page 4 of 5 7.Pervious concrete paving adjacent to field and dugout. Former Woodway High School Photo Examples Page 5 of 5