Loading...
Graphite Studio 117 2nd 1.docxMEMORANDUM September 10, 2019 TO:Pelletier Architects FROM:Steve Fisher, City of Edmonds Public Works, 425-771-0235 RE:Plan review for trash enclosure BLD20191112 – Graphite Art Studio mixed use, 117 2nd Ave. S, Edmonds Previously the general location for the trash enclosure was approved. Now it appears on the Level 1 floor plan (sheet A2.10) that the enclosure itself is tucked back from the alley against the back wall of the open diagonal parking area. The front of the enclosure needs to be directly adjacent to the alleyway and needs to have a minimum clear opening of 14’ since it has to accommodate both garbage and recycle containers side by side for use and service. Please adjust the enclosure using the same location or consider moving the enclosure to the northeast corner where it currently shows empty space on this plan. It is unclear if this space is to be utilized for anything or is not available, since it is unmarked. Please let me know if you have any questions.