Loading...
Graphite Studio 202 Main 1.docxMEMORANDUM September 19, 2019 TO:Pelletier Architects FROM:Steve Fisher, City of Edmonds Public Works, 425-771-0235 RE:Plan review for trash enclosure BLD20191111 – Graphite Art Studio, 202 Main St., Edmonds The resubmitted plan for the trash enclosure shows a new location that is now adjacent to the alleyway to the south. This location is acceptable but needs to have the enclosure to be orientated to have a clear 14’ minimum opening directly to the alley. Instead of two gate sections, the center post must be eliminated to allow the full clear 14’ minimum opening, thus utilizing one pair of gates. Or, as the waste hauler commented, it would be ideal to have a wide roll-up door to access the enclosure. This would eliminate gate sections swung into the alley, therefore avoiding making the alley narrower and harder for servicing.