Greenberg2006-1.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: October 20, 2008 TO: Charles Greenberg FAX: 425-672-7867 FROM: Ann Bullis, Building Official RE: Plan Check 2008-0790 Project: Greenberg Mixed Use Building rd Project Address: 155 3 Ave South During review of the plans and documents for the above noted project, it was found that the following information, clarifications or changes are needed. Provide written responses to each comment : and where changes can be found on the plans. Please resubmit to Marie Harrison, Permit Coordinator. 1.The plans submitted for the new permit do not include the proposed master bedroom revision for the south dwelling unit. Please submit a new revised sheet 3, stamped by your design professional of record. The following items are still outstanding from past field corrections. They will not hold up issuance of this permit, but must be adequately resolved/addressed before the framing inspection: 2.Geotechnical Special Inspection Reports: We are still awaiting special inspection reports for grading, temporary shoring, placement of fill and compaction from Earth Consultants. As discussed at the counter previously, Earth Consultants could provide one letter summarizing all soil special inspections and also make this their final letter for the project. 3.Structural Special Inspection Reports: a.As noted in my e-mail below to you on July 15, 2008 we are still awaiting the following: i. In reviewing the letter dated 4/10/07 from SDA (submitted 7/9/08), the City has not approved items 1 and 2 noted in the letter. Please have SDA inspect these items and provide a letter approving construction. Where missing holdowns must be retrofitted, provide special inspection report for installation. With regards to the last statement in the letter, the structural engineer of record shall provide a letter that all structural discrepancies have been addressed and the structure complies with the revised structural plans. b.We are also still waiting for the special inspection report for spray-applied fireproofing patching for framing changes made after 2/15/07. 4.Shop Drawings: We are still awaiting shop drawings for prefab. I-joists and roof trusses, open web steel joists/girders, and structural steel fabrication. Mr. Johnson was going to make 2 copies and submit them to the City.