Harbor Freight TIA.pdfName of Proposed Project:i"r
Owner/Applicant
Applicant Contact Person:
4"_0 i
Name
931 V
Street/Mailing Address
city State
to dip
Telephone: 2-17F? r
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
THRESHOLD LEVELS OF ANALYSIS
Contact Name
E-mail:
Project Traffic Levels Sections to Complete
I. Less than 25 peak -hour trips generated 1 and 7 only (Worksheet/Checklist)
ll. More than 25 peak -hour trips generated All sections
1. PROJECT DESCRIPTION
a. Location - Street address: M
(Attach a vicinity map and site plait.)
b. Specify existing land use: —macminw
c. Specify proposed type and size of development: `' M L, 1-71 ] 0 5r
(# of residential units and/or srluare foolage of building)
Revised on 6124110 E82 - Trctlfic Impacl Analysis Worksheel Page 1 of 5
d. Date construction will begin and be completed: l i `I
e. Deme proposed access locations:. ,._PACM11
f. Define proposed sight distance at site egress locations: -
2. TRIP GENERATION
Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation
manual. For independent fee calculations, the current edition of the ITE manual .may be used.
ADT = Average Daily Traffic
PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer)
a. Existing Site Trip Generation Table:
c. Net New Project Trip Generation Table:
PM Peak -Hour Trips
Land Use Daily (ADT) IN OUT
d. State assumptions and methodology for internal, link -diverted or passby trips:
Reviser! on 6/24/10 E82 - Traffic Impact Anaty,,4s Worksheet Page 2 of 5
T MITIGATION RECOMMENDATIONS
State recoirtinended tricasures and fees required to rnifigate, proje(I specific traffic impacts. Traffic,
impact fee shall be calculated from the E.Arnonds Road lffipacl, Fee Rate Study 'Fable 4 (�aftacJied)
and as identified in. ECDC 18,81 120, exc.ept as otherAvise providQd for independent fee cakulations
in ECD(.., 18MA30.
CHANGE 1H'q USE
Fee for prior use shall be based on fee established at the firrie the prior use was pennitted,, If thf,,;
prcvious rise waspermilted prior to the adoption of Ordinance 3516 (effiective dates 09/12/04),
the 2004 ECDC 18.81120 impact fee shall be, used,
Units if
Per Unit, square feet,
ITE Land Use Category
ee Rate # of dwelling,
New Use x
Art Wt� t
x
no
I r Use
KO -- -1
Use Fm
NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate if of dwelling,
—Al —et(.
FN'ew Use $ x
� 114 0 j rnp a ct re es W wed be (Wo, rior w i I I a credit be g for an illlpMt fM Ca @ CLO 0 11 resti I I i ng err a i Aet nega H ve.
Re vised on r.i/2,i'll 0 Worksheet M Ige "; a)'/ ' 15
1,)0
061 V'7