Loading...
HE staff report PLN20180014-0017.pdfI/Jc. 189M CITY OF EDMONDS 12151h Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.aov DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION PLANNING DIVISION REPORT & RECOMMENDATION TO THE HEARING EXAMINER Project: Edmonds-Woodway High School Synthetic Turf Conversion Requested Permits: PLN20180014 (Design Review) PLN20180015 (Conditional Use Permit - bleachers, playfield lighting, structures from 25 — 60 feet tall) PLN20180016 (Variance - structures over 60 feet tall) PLN20180017 (Variance — street setback reduction at 216th Street) Date of Report: August 15, 201 Staff Contact: Mike Clugston, AICP, Senior Planner Public Hearing: August 23, 2018 at 3:00 P.M. Edmonds Public Safety Complex: Council Chambers 250 - 5th Avenue North, Edmonds, WA 98020 SUMMARY OF PROPOSAL AND PROCESS The Edmonds School District No. 15 (District) is proposing to upgrade the existing baseball field and tennis courts at Edmonds-Woodway High School at 7600 2121h ST. SW. The proposed project includes relocating several small storage buildings north of the baseball field and creating of javelin and discus areas in that location. To the east, a synthetic turf multipurpose baseball field with football/soccer field (and associated lighting) and bullpens would be installed. In addition, four tennis courts (and associated lighting) are proposed east of the baseball field. Three batting cages are proposed south of the tennis courts. A portion of two tennis courts directly north and one tennis court east of the existing baseball field would be demolished to accommodate the improvements. The design review, conditional use permit, and variance reviews are considered Type III- B decisions under Section 20.01.003 of the Edmonds Community Development Code (ECDC) and all four permits have been consolidated for review pursuant to ECDC 20.01.002.B. When public projects involving variances are consolidated, the Architectural Design Board (ADB) reviews the proposed development at a public meeting and makes a recommendation to the Hearing Examiner. The Hearing Examiner then holds a public hearing and makes a further recommendation to the City Council. Edmonds-Woodway High School Synthetic Turf Conversion PLN20140065-0067,PLN2015009 & PLN20150013 Page 1 of 13 The Council, in accordance with ECDC 17.00.030.C, holds a closed -record review of the project and makes the final decision on the consolidated proposal per ECDC 20.01.002.C. On August 1, 2018, the Architectural Design Board held a public meeting and reviewed the design of the proposal (Exhibit 1). Consistency with the Comprehensive Plan, design standards in ECDC 20.11, and materials and landscaping was analyzed. The Board recommended approval of the project design with conditions (Exhibit 2). The Applicant responded to the proposed conditions with updated plans for the proposed batting cage and landscaping (Exhibits 3 — 5). The remainder of this report describes how the proposal complies with the applicable codes and criteria for the other three land use permits. II. EXHIBITS 1. ADB staff report with nine attachments 1. Land use application 2. Applicant's narrative 3. SEPA documentation 4. Letter of complete application and public notice documentation for design meeting 5. Technical comments 6. Edmonds-Woodway High School Master Plan 7. Photos from similar athletic field projects 8. Photo -simulations of the proposal 9. Project plans, May 14, 2018 2. ADB recommendation 3. Applicant's response to ADB recommendation 4. Revised batting cage plans 5. Revised landscaping plan 6. Public hearing documentation III. PUBLIC HEARING NOTICE A "Notice of Public Hearing" for permits PLN20180014 — 0017 was published in the Herald Newspaper, posted at the subject site, as well as the Public Safety Complex, Community Development Department, and the Library on August 9, 2018 (Exhibit 6). Notice of the public hearing was also mailed to property owners within 300 feet of the site. The City has complied with the noticing provisions of ECDC 20.03. IV. ZONE DISTRICT REQUIREMENTS Since the subject site is zoned Public (P), the development standards in ECDC 16.80 apply. 1. Use. Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 2 of 13 a. High schools and athletic structures are permitted uses in the P zone. [ECDC 16.80.010.A & B] The upgrades to the baseball field, tennis courts, and javelin and discus areas at Edmonds-Woodway High School are permitted uses. b. New bleachers, playfield lighting and structures over 25 feet in height require a conditional use permit in the P zone. [ECDC 16.80.010.C.3 & C.4] The District has applied for a conditional use permit for bleachers and playfield lighting as well as ball control fencing and light poles from 25 — 60 feet in height through permit PLN20180015. 2. Minimum setbacks. A minimum landscaped setback of 20 feet shall be maintained from a public street or other property lines, except that a setback of 25 feet shall be maintained for all structures, structured play areas and structured athletic fields from adjacent residentially zoned properties. These setbacks shall be fully landscaped. [ECDC 16.80.030.A] The proposed improvements will be set back more than the minimum required 20 feet along the 216th Street property line, except for the batting cage structure and a small section of fence near the southwest corner of the baseball field (Exhibit 1, Attachment 9, Sheet F-1.1). The District has applied for a variance (PLN20180017) to reduce the street setback for the batting cage from the required 20 feet to approximately 4 feet. The proposed 15-foot tall fencing will match existing nonconforming fencing by the baseball field. There is an existing batting cage in the same area as the proposed cage along with several lengths of fencing and netting of varying heights within the street setback along 216th; those elements are nonconforming and if those remain they can be maintained in accordance with ECDC 17.40 but cannot be expanded without a variance (as with the fencing in PLN20180017). 3. Height. The maximum height of a building in this zone shall be 25 feet, unless a conditional use permit has been obtained, except that the height of schools shall be governed by ECDC 17.100.050(1). A conditional use permit for additional height may permit structures up to a maximum height of 60 feet. [ECDC 16.80.030.B] The proposed batting cage building, dugouts, bleachers, discus cage, and tennis fences are all proposed to be less than 25 feet tall. ECDC 16.80.010.C.4 indicates that structures between 25 feet and 60 feet in height — such as the proposed ball control fencing and netting and lights around the tennis courts — require a conditional use permit. Structures greater than 60 feet in height — like the light poles for the baseball field — require a variance. A conditional use permit and a variance are part of this review (PLN20180015 and PLN20180016, respectively). For a CUP in the Public (P) zone, the specific conditional use permit criteria in ECDC 16.80.020 must be considered along with those of ECDC 20.05. The variances must be analyzed against the criteria in ECDC 20.85 — see Sections VI and VII for analysis of the conditional use permit and variances. Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 3 of 13 4. Lot coverage. The maximum lot coverage by buildings and other structures shall not exceed 35 percent unless a conditional use permit has been obtained. [ECDC 16.80.030.C] Per ECDC 21.15.110, coverage means the total ground coverage of all buildings or structures on a site measured from the outside of external walls or supporting members or from a point two and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area. The larger school site is approximately 30 acres which would yield a maximum allowable structural lot coverage of about 10.5 acres. The existing school building, stadium and miscellaneous buildings cover about 4 acres. The proposed batting cage and dugouts will cover an additional 0.10 acre, well less than the maximum allowed. Signs. All signs shall be subject to ADB approval. Signs shall be kept to a minimum size, which is compatible with the surrounding neighborhood and uses, while providing adequate visibility. [ECDC 16.80.030.D] No signs are proposed. 6. Landscaping. Site landscaping is reviewed against the requirements of ECDC20.13. [ECDC 16.80.030.E] As noted in the staff report to the ADB (Exhibit 1), landscaping meeting the intent of Type III is proposed to buffer the facilities along 216th Street. The Board requested additional landscaping be added east of the batting cage which is now shown on Exhibit 5. 7. Parking. All regional public facilities shall comply with the minimum off-street parking requirements contained in ECDC 17.50.030. a. All on -site parking lots shall be screened from adjacent residential properties with a solid wall or sight -obscuring fence not less than six feet in height. Such walls or fences may be built progressively as the parking facilities are installed. Landscaping shall be installed in accordance with ECDC 20.13.025. b. Regional public facilities shall submit a transportation management plan for approval by the city. The plan shall address the following: traffic control, parking management, mitigation measures for overflow parking into adjoining residential areas, and traffic movement to the nearest arterial street. [ECDC 16.80.030. F] By definition, the existing school site is not a regional public facility [ECDC 21.85.033]. No new parking is proposed for this field upgrade project and no parking spaces will be eliminated. The existing parking area east of the tennis courts will continue to serve the parking needs of the school and athletic facilities (Exhibit 1, Attachment 9, Sheet F-0.0). Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 4 of 13 8. Orientation to Transportation Facilities. All regional public facilities must be located adjacent to or within 500 feet of a principal or major arterial street. [ECDC 16.80.030.G] The school site is not a regional public facility. However, the site is adjacent to 212th Street SW and 761h Avenue West, both of which are existing or proposed minor arterials served by Community Transit bus routes. 9. Transit. All regional public facilities shall be located within 1,500 feet of an existing transit center. At least one on -site transit stop or station shall be required. The transit stop or station shall include a turnout of suitable size and location to accommodate public buses. [ECDC 16.80.030.H] The school site is not a regional public facility. However, the site is served by CT bus routes and there is an existing transit center approximately 1,000 feet east of the school on 72"d Avenue West. 10. Lighting. All exterior lighting shall be arranged and directed so as to direct the light away from adjacent residential uses. [ECDC 16.80.030.1] All lights proposed for the project will be on tall poles which will allow the lights to be directed more steeply downward onto the site. Shielded fixtures and LED lights will be used (Exhibit 1, Attachment 9, Sheet E1.1). This arrangement will result in very low light spill at the site boundaries of less than 1 foot candle measured at 3 feet above the ground (Exhibit 1, Attachment 9, Sheet ESPL-1). ECDC 17.60.030.E requires that sports field and court lighting must be turned off by an automatic timer no later than 10:15 p.m. 11. Screening. Electrical substations, water/sewer pump stations, sewage treatment facilities, solid waste facilities, commuter parking lots, and maintenance and storage yards shall be adequately screened from adjacent residential properties with a solid wall or sight -obscuring fence not less than six feet in height. Landscaping shall be provided in accordance with Chapter 20.13 ECDC. [ECDC 16.80.030.J] The school site is not one of the listed facilities. As noted by the Architectural Design Board, Type III buffer landscaping meeting the intent of ECDC 20.13.030.0 is proposed along the south boundary of the project area at 216th Street to provide some screening of the proposed improvements from the multi -family zoned parcels to the south (Exhibit 5). V. DESIGN REVIEW — ECDC 20.10 PLN20180014 — Design review Edmonds-Woodway High School Synthetic Turf Conversion The Architectural Design Board held a public meeting and reviewed the design of the proposed field redevelopment on August 1, 2018 and unanimously recommended approval of the project with the following proposed conditions (Exhibit 2): Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 5 of 13 1. THE PROPOSED LANDSCAPING SHOWN ON SHEET F-1.6 OF ATTACHMENT 9 MEETS THE INTENT OF THE TYPE III LANDSCAPING CRITERIA IN ECDC 20.13. 2. ADDITIONAL LANDSCAPING AND SCREENING SHALL BE ADDED ALONG THE EAST SIDE OF THE BATTING CAGE FACILITY. The applicant responded to proposed Condition #2 with an updated landscaping plan showing additional landscaping in the area east of the batting cage (Exhibit 5). Because the applicant has tried to address proposed Condition #2 with an updated landscaping plan, staff is proposing to revise Condition #1 to indicate that Exhibit 5 now meets the intent of Type III landscaping. VI. CONDITIONAL USE PERMIT PLN20180015 — Conditional use permit for bleachers, playfield lighting, and structures 25 - 60 feet tall According to ECDC 16.80.010.C.3, bleachers and playfield lighting require a conditional use permit. Similarly, structures over 25 feet in height require a conditional use permit per ECDC 16.80.010.C.4. As proposed, the ball control fencing and netting will be 40 feet tall and the lights around the tennis courts will be 50 feet tall (Exhibit 1, Attachment 9, Sheets F-2.11 and E1.1) and therefore require a conditional use permit. In addition to the regular conditional use permit criteria in ECDC 20.05, the specific criteria in ECDC 16.80.020 must also be considered. 1. Pursuant to ECDC 20.05.010, a conditional use permit may not be approved unless all of the following findings can be made: A. That the proposed use is consistent with the Comprehensive Plan. The Comprehensive Plan designation for the project area is "Public" within the Medical/Highway 99 Activity Center overlay. The site is subject to the 1994 Edmonds-Woodway High School Master Plan (Exhibit 1, Attachment 6) and the proposal to upgrade the existing sports facilities at the school is consistent with that master plan. The proposed improvements are also consistent with the goals for the Medical/Highway 99 Activity Center in the Comprehensive Plan, specifically Goal B (p 58 of the 2016 Comprehensive Plan): Provide for an aesthetically pleasing business and residential community consisting of a mixed use, pedestrian friendly atmosphere of attractively designed and landscaped surroundings and inter -connected development. Encourage a more active and vital setting for new retail, office, and service businesses, supported by nearby residents and visitors from other parts of the region. Provide street trees, buffers, and landscape treatments which encourage and support an attractive mixed use pattern of development characterized by Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 6 of 13 pedestrian walkways and centralized parking. Use these same features, in concert with site and building design, to provide a transition from higher - intensity mixed use development to nearby single family residential areas. The high school site serves as a transition from the more intense commercial uses to the east along Highway 99 to the residential uses to the west. It is also home to the District's football stadium and so attracts many events throughout the year. Improving the baseball field and tennis courts and adding lights will improve and extend their playability year-round. B. Zoning Ordinance. That the proposed use, and its location, is consistent with the purposes of the zoning ordinance and the purposes of the zone district in which the use is to be located, and that the proposed use will meet all applicable requirements of the zoning ordinance. The Hearing Examiner must consider the following specific criteria for conditional use permits in the P-zone in ECDC 16.80.020: A. Impact of the proposal on the visual and aesthetic character of the neighborhood; The proposed ball control fencing and bleachers will have minimal additional impact on the visual and aesthetic character of the neighborhood since these features are already present around the existing baseball field. The addition of playfield lighting would change the visual and aesthetic character of the southern portion of the Edmonds-Woodway High School site because the existing baseball field and tennis courts are currently unlit. However, the football stadium and softball field on the northern part of the site are lit so adding lights to the baseball field and tennis courts would not be out of character with the high school site. The proposed landscaping along 216t' Street and by the batting cage will improve the visual and aesthetic character of the area. B. Orientation of facilities to developed or undeveloped residential areas; The updated baseball field and tennis courts will be in nearly the exact same location as the existing facilities. The nearby area is a mix of commercial and multifamily residential uses and is built -out. C. Preservation of natural vegetation and/or other natural features, There is no natural vegetation or other features to protect within the project area. The existing baseball field and tennis courts have been there for decades. D. Hours of operation; performance standards; conformance of the proposal with the city's noise ordinance, Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 7 of 13 The property performance standards in Chapter 17.60 apply to this parcel as they do with all parcels in the City. ECDC 17.60.030.13 pertains specifically to lighting and states: External lights shall be shielded, trained or directed in a manner which minimizes glare onto adjacent property or passing traffic. Arc welding, acetylene torch cutting or similar processes shall be performed so as not to be seen from any point beyond the outside of the property. Any lighting on a sports field or court shall be turned off by an automatically timed mechanism no later than 10:15 p.m. Field or court lighting fixtures shall minimize scattering of light beyond the field or court being illuminated. As noted previously, all field lighting would be located on tall poles and directed downward onto the field and courts and will use cut-off fixtures to minimize light spill off site (Exhibit 1, Attachment 9, Sheets E1.1 & ESPL-1). An automatic timer that shuts lights off at 10:15 p.m. is required (a condition is proposed). Lastly, according to the noise abatement and control standards in Chapter 5.30 of the Edmonds City Code: "Sounds originating from officially sanctioned parades and other events to which the general public is solicited to attend without charge and sounds originating from league or school sponsored athletic events" are exempt from the provisions of the noise abatement chapter at all times. [ECC 5.30.100.G] E. Ability of the proposal to provide for adequate on -site parking; and traffic impacts of the proposal on the neighborhood. There is no change proposed to parking or vehicular access on the site. The existing lighted parking area at the corner of 216th and 761h will continue to serve the baseball field and tennis courts. Any additional traffic from using the lighted field or courts would occur during non -peak hours. C. Not Detrimental. That the use, as approved or conditionally approved, will not be significantly detrimental to the public health, safety and welfare, and to nearby private property or improvements unless the use is a public necessity. The proposed bleachers, ball control fencing and lighting will reflect a change from existing — particularly the lighting for the baseball field and tennis courts — but they will not be significantly detrimental to the public health, safety and welfare nor to nearby private property or improvements. The existing baseball field and tennis courts have bleachers and fencing. The new lights would be a change on the southern portion of the site but would be in keeping with the lighting of the football stadium and softball field to the north. Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 8 of 13 D. Transferability. The hearing examiner shall determine whether the conditional use permit shall run with the land or shall be personal. If it runs with the land and the hearing examiner finds it in the public interest, the hearing examiner may require that it be recorded in the form of a covenant with the Snohomish County auditor. The Hearing Examiner may also determine whether the conditional use permit may or may not be used by a subsequent user of the same property. The conditional use permit should run with the land. Should a different owner/operator assume control of the school site, the proposed facilities should be allowed to continue under that new group. 2. With conditions, staff feels the proposal is consistent with the conditional use criteria for approval listed ECDC 20.05 and in ECDC 16.80.020. VII. VARIANCES The applicant applied for two variances related to the field improvements: PLN20180016 — Variance for height of structures above 60 feet PLN20180017 — Variance for reduced setback at 216th Street A variance to any requirement in Titles 16 and 17 of the Edmonds Community Development Code (except use and procedural requirements) may be approved when the following findings can be made: A. Special Circumstances. That, because of special circumstances relating to the property, the strict enforcement of the zoning ordinance would deprive the owner of use rights and privileges permitted to other properties in the vicinity with the same zoning. 1. Special circumstances include the size, shape, topography, location or surroundings of the property, public necessity as of public structures and uses as set forth in ECDC 17.00.030 and environmental factors such as vegetation, streams, ponds and wildlife habitats. 2. Special circumstances should not be predicated upon any factor personal to the owner such as age or disability, extra expense which may be necessary to comply with the zoning ordinance, the ability to secure a scenic view, the ability to make more profitable use of the property, nor any factor resulting from the action of the owner or any past owner of the same property; B. Special Privilege. That the approval of the variance would not be a grant of special privilege to the property in comparison with the limitations upon other properties in the vicinity with the some zoning, C. Comprehensive Plan. That the approval of the variance will be consistent with the comprehensive plan; Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 9 of 13 D. Zoning Ordinance. That the approval of the variance will be consistent with the purposes of the zoning ordinance and the zone district in which the property is located, E. Not Detrimental. That the variance as approved or conditionally approved will not be significantly detrimental to the public health, safety and welfare or injurious to the property or improvements in the vicinity and same zone, F. Minimum Variance. That the approved variance is the minimum necessary to allow the owner the rights enjoyed by other properties in the vicinity with the same zoning. Because the variances are for public structures proposed by a public agency (Edmonds School District), the process language in ECDC 17.00.030.0 applies: All public structures and uses built or altered by the city or any other public agency shall comply with this zoning ordinance. Where it is a public necessity to build, or alter, a structure or use in a location or in a manner not complying with this zoning ordinance, a variance may be considered. in this case, the action of the hearing examiner shall be a recommendation to the city council. As noted previously, the Hearing Examiner will review the variances against the criteria in ECDC 20.85 and make a recommendation to the City Council who will make the final decision on the variances as well as the associated design review and conditional use permit. Staff Analysis: PLN20180016 — Height variance for 70 - 90 foot tall light poles around the baseball field 1. Special circumstances. Edmonds-Woodway High School is a public site where public structures and uses are subject to variance in accordance with ECDC 17.00.030. 2. Special privilege. A height variance for light poles based on public necessity would not constitute special privilege. The high school is unique within the City of Edmonds and light poles of a similar height are in use at the football stadium on the Edmonds-Woodway High School campus as well as other sports field installations throughout the District. 3. Comprehensive plan. See Section VI.1.A for discussion regarding the proposal's consistency with the Comprehensive Plan. 4. Zoning ordinance. The maximum height for structures in the P zone is 25 feet, 60 feet with a conditional use permit (as with those proposed light poles around the tennis courts in the associated conditional use permit, PLN20180015). Approval of the subject variance would allow light poles around the baseball field from 70 - 90 feet tall as shown on Exhibit 1, Attachment 9, Sheet E1.1. Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 10 of 13 5. Not detrimental. Light poles up to 90 feet tall would not be significantly detrimental to the public health, safety and welfare or injurious to the property or improvements in the vicinity. The taller light poles and cut-off light fixtures will minimize light spill which reduces the impact to neighboring properties. As noted in the associated light spill plan (Exhibit 1, Attachment 9, Sheet ESPL-1), light intensity near ground level is proposed to be less than 1 foot-candle at the site boundary. 6. Minimum variance. While the 50-foot tall poles used for the tennis courts could be used around the baseball field, more lights would be needed to cover the larger baseball field area. However, each of the lower towers would not direct the light down as steeply, thus increasing light throw off site. As a result, to minimize the number of lights used and light spill off the site, light poles ranging between 70 and 90 feet would appear the minimum necessary for the baseball field lighting project. PLN20180017 — Variance for street setback reduction for batting cage and fence at 216th Street 1. Special circumstances. Edmonds-Woodway High School is a public site where public structures and uses are subject to variance in accordance with ECDC 17.00.030. 2. Special privilege. A setback variance for the batting cage and fence based on public necessity would not constitute special privilege. The high school is unique within the City of Edmonds. The proposed batting cage will replace an existing batting cage in the same location. The portion of the new cage that would project into the setback would be uncovered like the existing cage while the covered portion of the cage would meet the 20' street setback (Exhibit 1, Attachment 9, Sheet F-1.1). The fence will connect existing fencing along 216th to the proposed outfield fence around the baseball field. 3. Comprehensive plan. See Section VI.1.A for discussion regarding the proposal's consistency with the Comprehensive Plan. 4. Zoning ordinance. The minimum street setback for structures in the P zone is 20 feet. The existing batting cage projects nearly all the way into the street setback (see below and Exhibit 1, Attachment 9, Sheet F-0.1). Approval of the subject variance would allow the replacement batting cage to project into the setback about 16 feet (Exhibit 1, Attachment 9, Sheet F-1.1). Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 11 of 13 5. Not detrimental. The location of the replacement batting cage and fence would not be significantly detrimental to the public health, safety and welfare or injurious to the property or improvements in the vicinity and same zone. The existing cage and fencing has been there for many years — the new structures will integrate well into this portion of the site. The fencing will also prevent baseballs from flying into the public right-of-way. 6. Minimum variance. The covered portion of the new batting cage will meet the required setback (Exhibit 1, Attachment 9, Sheets F-1.0 & F-1.1) and thus no variance is required for that part of the structure. The uncovered portion of the cage would project into the setback similar to the current cage. However, the new cage would project slightly less into the setback thus slightly reducing the impact of its location. The height of the fencing by the baseball field is the minimum necessary to protect the travelling public along 216th Street. VIII. PUBLIC COMMENTS As of the date of this report, no public comments have been received. IX. CONCLUSION AND RECOMMENDATION Based on the analysis in and the attachments to this report, staff finds the proposal is consistent with the conditional use approval criteria in ECDC 20.05.010 and ECDC 16.80.020, and the variance criteria of ECDC 20.85. The design of the site and proposed structures are consistent with the design standards in ECDC 20.11 and the Urban Design Element in the Comprehensive Plan. Therefore, the Hearing Examiner should recommend that the City Council APPROVE the design review (PLN20180014), conditional use permit (PLN20180015), and variances (PLN20180016 & PLN20180017) associated with the Edmonds-Woodway High School Synthetic Turf Conversion project with the following conditions: Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 12 of 13 1. The revised landscaping proposed in Exhibit 5 meets the intent of the Type III landscaping criteria in ECDC 20.13. 2. An automatic timer that turns the field and court lights off at 10:15 p.m. is required. 3. The conditional use permit should run with the land and be transferrable from the Edmonds School District to a subsequent owner/operator of the Edmonds-Woodway High School site. PARTIES OF RECORD City of Edmonds 121- 5th Ave N Edmonds, WA 98020 Edmonds-Woodway High School Synthetic Turf Conversion PLN20180014 - 0017 Page 13 of 13 Nick Chou Edmonds School District 20420 68th Ave. W Lynnwood, WA 98036