Loading...
HE staff report.pdfoc. 189" CITY OF EDMONDS 1215th Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: ww ed ondsvva. ov DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION PLANNING DIVISION REPORT & RECOMMENDATION TO THE HEARING EXAMINER Project: Madrona K-8 School Replacement Requested Permits:. PLN20160027 (Design Review) PLN20160028 (Conditional use permit for building area) PLN20160029 (Conditional use permit for gym and flag pole height) Date of Report: 0 tober 5, 6 Staff Contact: Mike Clugston, AICP, Associate Planner Public Hearing: October 13, 2016 at 3:00 P.M. Edmonds Public Safety Complex: Council Chambers 250-5 th Avenue North, Edmonds, WA 98020 I. SUMMARY OF PROPOSAL AND PROCESS The Edmonds School District is proposing to replace the existing Madrona K-8 School at 9300236 th Street SW. The new school will be built behind the existing school and construction will be timed so that the students can remain in the existing school until the new school is completed. The new school will use existing access points on 236th Street but will include new parking and student drop-off as well as a new bus loop with extended queuing. New sidewalks along the south side of 236th are also proposed. Design review of the site and building and two conditional use permits — one for building area in excess of 60,000 sf and another for the gymnasium and flag pole to be nearly 35 feet in height — are requested as part of this project. The design review and conditional use permits are considered Type III -B decisions under Section 20.01.003 of the Edmonds Community Development Code (ECDC) and all three permits have been consolidated for review pursuant to ECDC 20.01.002.B. When consolidated like this, the Architectural Design Board (ADB) reviews the proposed development at a public meeting and makes a recommendation to the Hearing Examiner. The Hearing Examiner then holds a public hearing and makes the final decision per ECDC 20.01.002.C. The Architectural Design Board held a public meeting and reviewed the design of the proposed redevelopment on September 7, 2016. They found that the proposal is Madrona School Replacement PLN20160027 — PLN20160029 Page 1 of 8 consistent with the General Design Review criteria in ECDC 20.11.030, the general design guidance in the Comprehensive Plan, and specific elements of the zoning ordinance and recommended approval of the project with conditions (Attachments A & B). Staff recommends approval of the associated conditional use permits with additional conditions. II. EXHIBITS A. ADB staff report and attachments 1. Land use application 2. Project narrative 3. Description of clarifications by ESD 4. Aerial photo and photos of the existing frontage at 236th Street 5. Project plans, dated July 25, 2016, which include: Cover sheets (CUP -001 to CUP -003) Survey sheets (V-101 to V-116) Preliminary civil plans (C-110 and C-111) Landscape plans (L-100 and L-101) Architectural plans (A-101 to A-213) Electrical plans (E-101 and E-102) 6. SEPA MDNS and associated documentation 7. Public notice documentation for design review meeting 8. Technical comments and correspondence 9. Wetland and Stream Delineation Report 10. Preliminary Geotechnical Engineering Report 11. Preliminary 'draft' Hydrogeologic Report (for feasibility of UIC wells for stormwater flow control) 12. Tree survey 13. Renderings and material spec sheets B. ADB recommendation (draft minutes of September 7, 2016 meeting) C. Edmonds School District presentation to ADB D. Cover letter dated September 21, 2016 E Revised building plan sheets (CUP -002, A-111) F. Wetland buffer enhancement plan G. Notice documentation for public hearing III. PUBLIC NOTICE A "Notice of Public Hearing" for permits PLN20160027 — 0029 was published in the Herald Newspaper, posted at the subject site, as well as the Public Safety Complex, Community Development Department, and the Library on September 28, 2016. Notice of the public hearing was also mailed to property owners within 300 feet of the site (Exhibit G). After the notice was distributed, staff realized that the decision process for the three permits was inadvertently described in two different ways on the face of the letter. At Madrona School Replacement PLN20160027 — PLN20160029 Page 2 of 8 the top, it correctly indicated that the Hearing Examiner would make the final decision on the permits. At the bottom of the notice, it incorrectly indicated that the Hearing Examiner would make a recommendation to the City Council who would make the final decision. The bottom section was not updated from a previous project and thus the confusion. As noted in Section I of this report, the final decision on the three subject permits rests with the Hearing Examiner. Any appeal of the permits would be to City Council in accordance with ECDC 20.01.003.B. The City has complied with the noticing provisions of ECDC 20.03. IV. DESIGN REVIEW — ECDC 20.10 PLN20160027 — Design review for Madrona school replacement The Architectural Design Board held a public meeting and reviewed the design of the proposed project on September 7, 2016. The Board unanimously recommended approval (Exhibit B) with the following conditions that were included on page 18 of the staff report (Exhibit A): 1. Trees must be protected and removed in accordance with ECDC 18.45.050.H and the tree protection and mitigation guidelines found in Attachment 12, as amended. 2. Development must occur in accordance with the wetland code in ECDC 23.50. The wetland report (Attachment 9) must be updated to address how the proposed development meets the buffer averaging/reduction and enhancement requirements of ECDC 23.50.040. 3. Development must occur in accordance with the geologically hazardous areas code in ECDC 23.80. The geotechnical report (Attachment 10) must be updated to address specific elements of the proposed development relative to the standards in Sections 23.80.060 and 23.80.070. 4. Service yards, and other areas where trash or litter may accumulate, must be screened with planting or fences or walls which are compatible with natural materials. 5. The proposed landscaping shown on Sheets L-100 and L-101 of Attachment 5 meets the intent of Chapter 20.13 of the Edmonds Community Development Code. Automatic irrigation should not be required. 5. A 30'right-of-way dedication along the south side of 236th Street SW is required in accordance with the City's Official Street Map. 7. Staff will verify compliance of the proposal with all relevant codes and land use permit conditions through review of building and engineering permits. Minor changes to the approved design may be approved by staff at the time of building permit without further design review by the Board as long as the design is substantially similar to that originally approved. Madrona School Replacement PLN20160027 — PLN20160029 Page 3 of 8 The Hearing Examiner may keep, modify or eliminate any of the proposed conditions; staff recommends adopting the ADB's conditions. V. CONDITIONAL USE PERMITS — ECDC 20.05 PLN20160028 — Conditional use permit for school building area in excess of 60,000 sf PLN20160029 — Conditional use permit for school structures in excess of 25 feet As noted in the staff report to the ADB (Exhibit A), Madrona is a primary school and therefore a permitted primary use in the zone where the school is located. However, according to ECDC 17.100.050.G, a primary school with a design capacity of greater than 60,000 sf requires a conditional use permit in all zones: Schools — Permitted Use. Schools shall be an allowed or conditional use as provided below. For purposes of this subsection "design capacity" shall be determined by reference to the applicable comprehensive plan capital facilities element. 1. Primary schools with a design capacity of not greater than 600 students and not more than 60,000 square feet of floor area shall be permitted as a permitted use in all zones. 2. Primary schools with a design capacity of greater than 600 students or more than 60,000 square feet of floor area shall be permitted as a conditional use in all zones. 3. High schools shall be permitted as a conditional use in all zones. As shown on Sheet CUP -002 of Exhibit E, the proposed school will be approximately 80,000 sf so the School District applied for a conditional use permit for area under PLN20160028. In addition, two elements of the project are proposed to be taller than the 25 -foot maximum height allowed by the RS -8 zone. This can be allowed through a conditional use permit per ECDC 17.100.050.1: Schools — Height. The maximum building height for schools shall not exceed the maximum height for the zone in which the school is located, except: 1. That in residential zones or any zone in which a structure 35 feet in height is not a permitted use, that portion of the structure or a separate structure that serves as an auditorium, gymnasium, or swimming pool, may be permitted to a maximum building height of 35 feet with a conditional use permit; and 2. Provided that the maximum building height for any other portion of the entire structure may be increased above the maximum(s) provided in this section, also subject to conditional use permit approval, to a maximum of 35 feet. Madrona School Replacement PLN20160027 — PLN20160029 Page 4 of 8 Both the gymnasium (Exhibit E, Sheet CUP -002) and the flag pole (Exhibit A, Attachment 5, Sheet L-101) are proposed to be in excess of 25 feet in height; therefore, a conditional use permit is required for those structures (PLN20160029). 1. Pursuant to ECDC 20.05.010, a conditional use permit may not be approved unless all of the following findings can be made: A. That the proposed use is consistent with the Comprehensive Plan. The existing 86,500 sf Madrona School is a listed public facility in the City's Capital Facilities Plan. The proposed 80,000 sf replacement school building is therefore consistent with the Comprehensive Plan. The site is designated Single Family Urban 1 in the Comprehensive Plan and is zoned Single Family Residential (RS -8), one of the implementing zones for the designation. The proposed school will be slightly smaller than the existing school but will continue to serve about 650 students. Gvmnasium and flag pole height The proposed gymnasium and flag pole are integral parts of the proposed school replacement project and therefore are consistent with the Comprehensive Plan. B. Zoning Ordinance. That the proposed use, and its location, is consistent with the purposes of the zoning ordinance and the purposes of the zone district in which the use is to be located, and that the proposed use will meet all applicable requirements of the zoning ordinance. The purposes of the zoning ordinance include [ECDC 16.00.010]: A. To assist in the implementation of the adopted comprehensive plan for the physical development of the city by regulating and providing for existing uses and planning for the future as specified in the comprehensive plan; and B. To protect the character and the social and economic stability of residential, commercial, industrial and other uses within the city, and to ensure the orderly and beneficial development of those uses by: 1. Preserving and retaining appropriate areas for each type of use; 2. Preventing encroachment into these areas by incompatible uses; and 3. By regulating the use of individual parcels of land to prevent unreasonable detrimental effects of nearby uses. The purposes of the RS -8 zone and the other Single -Family Residential zones include [ECDC 16.20.000]: Madrona School Replacement PLN20160027 — PLN20160029 Page 5 of 8 A. To reserve and regulate areas primarily for family living in single-family dwellings; B. To provide for additional nonresidential uses which complement and are compatible with single-family dwelling use. School Building Area Per ECDC 16.20.010.A.3, primary schools like Madrona K-8 are permitted primary uses in the RS -8 zone subject to the requirements of ECDC 17.100.050.G - R. As was described in the staff report to the Architectural Design Board (Exhibit A), with the proposed conditions the school building will be able to meet the requirements of the zoning ordinance. The applicant submitted a wetland buffer mitigation and enhancement plan for Wetland B along with updated plan sheets to address ADB Condition #2 (Exhibits D - F). The plan describes the standard 60' buffer and 15' building setback for Wetland B and then a 25% buffer width averaging plan with enhancement in accordance with ECDC 23.50.040. The plan sheets also show a change to the location of the proposed building space so that it remains outside of the reduced 45' wetland buffer and 15' building setback. In addition, relative to Condition 4, the applicant noted that at the ADB meeting that there would be screening of the northeast service yard (Exhibits B & Q. The area of the school building will be verified at building permit. Gymnasium and flagpole he'iEht. The maximum height for structures in the RS -8 zone is 25 feet. As noted above, height up to 35 feet for school structures can be approved through a conditional use permit per ECDC 17.100.050.1. The proposed gymnasium is to be 34 feet in height and can be seen in Inset D4 on Sheet CUP -002 of Exhibit A, Attachment S. The height of the gymnasium and flag pole will be verified at building permit. C. Not Detrimental. That the use, as approved or conditionally approved, will not be significantly detrimental to the public health, safety and welfare, and to nearby private property or improvements unless the use is a public necessity. With the proposed conditions, neither the new school building nor the gymnasium and flag pole will be detrimental to the public health, safety and welfare. In fact, the new school and related improvements will better serve the student population and local residents. Safety will be improved by relieving traffic congestion and installing new sidewalks on 236th Street (Exhibit A, Attachment 5, Sheets C-110 & C-111). New recreation opportunities will be available with the redesigned play areas and fields (Exhibit A, Attachment 5, Sheets L-100 & L-101). Site lighting will be directed downward to light pedestrian and vehicular access areas and space lighting will be on motion sensors (Exhibit A, Attachment 5, Sheets E-101 & E-102). Madrona School Replacement PLN20160027 — PLN20160029 Page 6 of 8 D. Transferability. The hearing examiner shall determine whether the conditional use permit shall run with the land or shall be personal. If it runs with the land and the hearing examiner finds it in the public interest, the hearing examiner may require that it be recorded in the form of a covenant with the Snohomish County auditor. The Hearing Examiner may also determine whether the conditional use permit may or may not be used by a subsequent user of the same property. Both conditional use permits should run with the land. The Edmonds School District is replacing the school and related improvements to operate into the long-term future. However, there is no reason that new conditional use permits should be required for the building area and gym and flag pole height if a new organization operated the site (separate conditional use permits could be required in the future for new uses such as those found in ECDC 16.20.010.0 and D). Because these CUPs are for dimensional allowances to physical structures rather than uses, recording a covenant with Snohomish County should not be necessary. 2. With conditions, staff believes the proposed school building area as well as the gymnasium and flag pole heights are consistent with the conditional use criteria for approval listed ECDC 20.05. VI, PUBLIC COMMENTS As of the date of this report, no public comments have been received. VII. CONCLUSION AND RECOMMENDATION Based on the analysis and exhibits included with this report, staff believes the proposal is consistent with the conditional use approval criteria in ECDC 20.05.010. The design of the site and proposed structures are consistent with the design standards in ECDC 20.11 and the Urban Design Element in the Comprehensive Plan. Therefore, the Hearing Examiner should APPROVE the design review (PLN20160027) and conditional use permits (PLN20160028 and PLN20160029) associated with the Madrona K-8 School replacement project with the following conditions: 1. Trees must be protected and removed in accordance with ECDC 18.45.050.H and the tree protection and mitigation guidelines found in Attachment 12, as amended. 2. Development must occur in accordance with the wetland code in ECDC 23.50. The wetland report (Exhibit A, Attachment 9) must be updated to address how the proposed development meets the buffer averaging/reduction and enhancement requirements of ECDC 23.50.040. 3. Development must occur in accordance with the geologically hazardous areas code in ECDC 23.80. The geotechnical report (Exhibit, A, Attachment 10) must be updated to address specific elements of the proposed development relative to the standards in Sections 23.80.060 and 23.80.070. Madrona School Replacement PLN20160027 — PLN20160029 Page 7 of 8 4. Service yards, and other areas where trash or litter may accumulate, must be screened with planting or fences or walls which are compatible with natural materials. 5. The proposed landscaping shown on Sheets L-100 and L-101 of Attachment 5 meets the intent of Chapter 20.13 of the Edmonds Community Development Code. Automatic irrigation should not be required. 6. A 30' right-of-way dedication along the south side of 236th Street SW should be required in accordance with the City's Official Street Map. 7. Staff will verify compliance of the proposal with all relevant codes and land use permit conditions through review of building and engineering permits. Minor changes to the approved design may be approved by staff at the time of building permit without further design review by the Architectural Design Board as long as the design is substantially similar to that originally approved. 8. An updated or 'final' version of the hydrogeologic report (Exhibit A, Attachment 11) must be submitted with the building permit application in order to be able to verify stormwater code compliance. 9. The conditional use permits should run with the land and be transferable. VIII. PARTIES OF RECORD City of Edmonds 121-5 th Ave N Edmonds, WA 98020 Corrie Rosen Mahlum Architects 71 Columbia St., 4th Floor Seattle, WA 98104 Madrona School Replacement PLN20160027 — PLN20160029 Page 8 of 8 Taine Wilton Edmonds School District 2042068 th Ave. W Lynnwood, WA 98036