Loading...
Health Department Comments.docxProject Comment Form Project Information: CRS#60939334 Sunrise of EdmondsProject Title:Bistro RemodelProject Location:750 Edmonds WayEdmonds, WA. 98020Plans will be delivered to:Name:David Read:davidr@wattenbarger.comLocal Permit #:BLD20190217:425.453.0 606 Key Contacts: Company Name Phone Email DOH Reviewer KevinA Scarlett RA HFDP (360)236-2949 kevin.scarlett@doh.wa.gov Facility Contact: Sunrise of Edmonds Janet Meffert (703) 854-0434 janet.meffert@sunriseseniorliving.com Facility Admin.: Sunrise of Edmonds Kris Batiste (425) 673-9700 edmonds.ed@sunriseseniorliving.com Arch./Eng.: Wattenbarger Architects David Read (425) 453-0606 davidr@wattenbarger.com Other: Wattenbarger Architects James Brown (425) 453-0606 jbrown@wattenbarger.com Other:                         Other:                         Other:                         Local AHJ: City of Edmonds Leif Bjorback (425) 771-0220 xt 1380 leif.bjorback@edmondswa.gov Addt’l Copies To: L&I Electrical Section L&I Factory Assembled Structures Local Electrical AHJ Project Status: -Authorized to Begin Construction- Comments are NOT APPROVED The Construction Documents have been reviewed and found acceptable. All plan review comments have not been approved. Construction can begin, subject to construction permitting from the local building official. See page two for important next steps. To avoid delays it is important you follow these Next Steps: Respond to Comments: Revise project documents to be compliant with applicable rules and the review comments attached to this form. Respond, in writing, to the comments attached to this form. Submit revised plans and responses to comments to the Construction Review Services. During Construction Maintain a copy of the A2BC drawing set on the project site. Submit any changes to the A2BC set to CRS for review and approval prior to executing the work. If you have any questions please contact Construction Review Services (360) 236-2944. You can monitor project status and history at www.doh.wa.gov/crs. Project Details (for internal use only) Occupancy Type IBC: IBC: IBC: NFPA 101: Construction Type IBC: IBC: IBC: NFPA 101: NFPA 101: Fed Code: Building Code: Licensing Code: Number of Beds Added: N/A Removed: N/A CON Required? Yes No CON Approved Yes No Req’d Provided Type/category Are Hospital inpatients seen at this location? Yes No Automatic Fire Sprinkler System: Are planned residents/patients incapable of self preservation? Yes No If yes, how many?       Automatic Fire Alarm System: Emergency Power System: Is sedation provided? Yes No If yes, max. planned level? Medical Gas System: Smoke Compartmentation: Is space Medicare certified? Yes NoBuilding Department contacted? Estimated construction completion:       REVIEW NOTES Bistro remodel including common areas interiors finishes and restroom upgrades. No exterior work. No FA or FS work anticipated. -kas DSHS For Assisted Living Facilities Only Total Sleeping rooms       Minimum required area of day rooms/areas       Total Approved beds       Total area provided in day rooms/areas       Total Contract beds       NOTES TO SURVEY       Plan Review Comments: Comment ID# Approved Not Approved Comments Legend O = Omitted comment  = current status of the comment – Approved or Not Approved N = Note only – a suggestion or recommendation and is NOT a requirement 1  Provide a copy of your Local Building (along with copy of each permit as required-MEP, etc) Permit/s. You must obtain Local permits from the City prior to the start of any construction. Retain City permit records for use in your project closeout procedures when construction is complete. Should you need to deviate from this directive you must contact your assigned CRS Plans Reviewer prior to such deviation. Approved 11/17/19 – based on documents received 10-22-19, a pdf copy of City Building Permit #BLD20190217 was provided. –kas 2  Contact CRS Senior Plans Reviewer Kevin A. Scarlett (KAS) at 360.236.2949 to schedule Inspection efforts. Plan one Final Inspection (Final when project work is complete). Inspection efforts will occur via GoToMtg Video medium, the Facility must contact KAS to set-up and coordinate with the applicable site personnel. This comment will remain ‘open’ until construction is complete. Deferred 11/17/19. –kas 3  Provide a sketch of the ceiling (showing existing FS head locations) in the Bistro area where the walls are being removed. Not Approved 11/17/19 – based on documents received 10-22-19, the Architect indicates to see revised Sheet A201 partial ceiling plans 4 and 5 for existing and new FS head locations in Bistro area. Existing FS head was relocated toward the Bistro back wall 2 feet to clear ceiling space for the new mechanical unit. The City has already approved the FS relocation. See attached photos 1-4 and photos 1-4 scans with written info. FS is difficult to see in photo scans with written info, so original photos were alsosent. ALL FS heads in the area need to be indicated (all the next nearest – the grand foyer area needs to be shown- show the next nearest FS heads to this relocated head) where any/all walls are open in between. -kas Not Approved 1/7/20 – based on documents received 12-10-19, the Architect indicates that the RCP has been updated to show new and existing fire sprinkler head locations on 5/A201. The head location must be revised to meet NFPA 13. Suggest calling KAS to discuss. -kas 4  Verify that this project provides no hard plumbed equipment such as Coffee makers or beverage machines. Not Approved 11/17/19 – based on documents received 10-22-19, the Architect indicatesto see the added general note to Sheet A201 for GC to furnish and install AVB at new/existing hard-plumbed lines for newequipment. IF they are hard plumbed, they will require one RPBA (each device) and an AVB is not applicable (open hose is AVB & closed piped equipment is RPBA). -kas Not Approved 1/7/20 – based on documents received 12-10-19, the Architect indicates to refer to the revised note from AVB to RPBA on sheetA201. While the comment response is acceptable, this comment will remain open until inspected by KAS. -kas 5  Verify that there is no spray hose on any sink in this project or if one is present, you then must provide an AVB that is 1” above the flood rim of the sink. 2015 UPC 601 Approved 11/17/19 – based on documents received 10-22-19, the Architect indicates that there are no spray hoses on any sinks in thisproject (refer also to comment#14a below). –kas 6  Verify GFCI protected outlets throughout Bathrooms. 2017 NFPA 70 – 210.8(B)(1) Approved 11/17/19 – based on documents received 10-22-19, the Architect indicates to see the added general note to Sheet A201 for GC to furnish and install GFCI protected outlets in remodeledbathrooms. -kas 7  Verify GFCI protected outlets throughout Kitchens. 2017 NFPA 70 – 210.8(B)(2) Approved 11/17/19 – based on documents received 10-22-19, the Architect indicates to see the added general note to Sheet A201 for GC to furnish and install GFCI protected outlets in remodeled Bistroarea. -kas 8 N Additional documents were received on 4-29-19 which produced NO new comments. –kas 9  A submittal was received on 9-20-19 with NO RESPONSE to the original A2BC letter. We now have the initial review plans, then 4-29-19 and 9-20-19 scope to coordinate into an organized response and authorization. Re-submit with responses to open comments above. Provide an abbreviated narrative to the scope change which has occurred. Also, provide a single pdf of plans that incorporate ALL work as is currently proposed. Upon review of that resubmittal I will determine the authorized disposition of the added work. –kas Deferred 11/17/19 – based on documents received 10-22-19, the Architect indicates no response for this comment, however, the other previous comments were responded to (thank you) there was no single pdf incorporating all work. Suggest deferring this response until ALL other comments are resolved. -kas 10  Toilet rooms 131 and 138 appear to be common use toilets. Provide sheet vinyl (or ceramic tile) with a 4” minimum monolithic wall base to be installed in any common use toilet, public toilet or staff toilet room (this excludes a resident room dwelling unit toilet). 2015 IBC 1210.2.1 Not Approved 1/7/20 – based on documents received 12-10-19, the Architect indicates that they’ve added note to seal bottom of wall base at flooring in toilet rooms on Sheet A201 enlarged plans 6 and7. The ‘seal’ does not provide a monolithic material. Note: a top-set SV with welded seam is acceptable. -kas 11  More detail is needed on the smoking parlor AND porch. Provide a narrative around this intended function. Include how the proposed area/s comply with State regulations and the Non-smoking policy in WA. It appears the ‘room & covered porch’ is more than 25ft from the main entrance…..but, not the dining room (or dining room windows or the building windows above both/each). Suggest considering a remote Gazebo type structure more than 25ft from ANY part of the building which has (or may have) window, door, or ventilation openings. The current location does not appear to comply with RCW 70.160.075 Not Approved 1/7/20 – based on documents received 12-10-19, the Architect indicates that the existing Parlor room is not a “Smoking Parlor”. There’s no smoking in the building per WA Statecode. While the comment response is acceptable the record documents must cloud and show this change on plans (NO reference to Smoking Parlor). -kas 12  If (via #11 above) the smoking parlor can be modified to ultimately comply, then provide signage at the building at both the main entry and doors to the dining room (outer porch entry may be applicable here). RCW 70.160.050 Not Approved 1/7/20 – based on documents received 12-10-19, the Architect indicates that the existing Parlor room is not a “Smoking Parlor”. There’s no smoking in the building per WA Statecode. While the comment response is acceptable the record documents must cloud and show this change on plans (NO reference to Smoking Parlor). -kas 13  Verify the high temperature achievable or provide information on the fireplace indicating how residents are protected from high temperatures from the face of the fireplace (cool-to-the-touch criteria). Not Approved 1/7/20 – based on documents received 12-10-19, the Architect indicates that they’ve added note to install protective screen at high temperature fireplacefaces. Some detail must be provided on the protective screen material, spacing from FP face and attachment locations and materials used. -kas 14  Verify two concerns in the Hair Salon; Hair wash sink (with a presumed hair wash hose) is equipped with a deck mounted AVB. room is equipped with an exhaust fan. Approved 1/7/20 – based on documents received 12-10-19, the Architect indicates that they’ve added note to install deck mounted AVB and exhaust fan at Hair Salon on sheet A201. -kas Additional comments may arise upon CRS review of subsequent submittal materials. When submitting a response to this letter, it is best to include your response directly in the word.docx cell of the comment at the very bottom of the cell (your response is then the last text within the comment cell). Finally, submit the letter (via upload) electronically. Compliance with the comments above provided by the Department of Health, Construction Review Services, are necessary for this facility to meet the cited requirements of the applicable licensing regulations found in the Washington State Administrative Code and associated references. These comments, authorization to begin construction or final project approval do not relieve the facility from the responsibility to meet the requirements of any applicable federal, state or local regulations. In the event of conflicts between other jurisdictions and these written comments, the most stringent shall apply. The building owner or operator is ultimately responsible for safety and insuring the building is in compliance with all applicable laws.