HEIGHT SURVEY.pdf�
,\
October 10.2012
Warren Stanley
Cotter -Stanley Construction, Inc.
2832188°Ave. NE
Bellevue, VVAD8OOO
Re: Ridge Height Certification for Lot 4`City ofEdmonds SP#S-2OO7-37
TPN 00450700400015
On October 18. 2012 a survey nrgVv working under my direct supervision, visited your
construction site otS8O7224"St SW, |nEdmonds, WA.
At the time of our visit, the roof was plywood sheeted and covered with roofing paper.
Using aLeic8NA2compensating level, the crew recovered and held the elevation of387.74
feet on site bench mark per plot plan, top valve nut of a fire hydrant at the north side of 220
St SW, +~3O`west ofthe intersection with 08m Ave VV.The crew then observed anelevation
of 407.55 feet to the highest ridge point of the plywood/paper of the structure on Lot 4,
At the time of our observation, we found that the finished ridge height was 0.25 feet or 3"
below the highest ridge elevation of4O7.MOfeet as indicated on the plot plan for Donald and
Shiloh Oe Vana, prepared by Zinnrn8r|and Construction, Inc. 9/27711 and approved by
planning 11/2/11.
As always, please do not hesitate tocontact mewith further questions regarding this matter
Bruce E. Bailey, PLS