Loading...
Highway 99-23904_bld20080444_Taco Time_5.pdf DATE: December 11, 2008 TO: Rick Lentz rickl@mlarch.com FROM: Jeanie McConnell, Engineering Program Manager RE: Application #: bld20080444 Project: Taco Time Project Address: 23904 Highway 99 During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. City of Edmonds handouts and standard details can be referenced on the City website under Development Services Department, Engineering Division. Review 1 – July 23, 2008 Review 2 – September 9, 2008 Review 3 – October 6, 2008 Review 4 – November 12, 2008 Review 5 – December 11, 2008 STORM DRAINAGE TECHNICAL INFORMATION REPORT 12/11/08 – The first three pages of the Storm Drainage Technical Information Report were revised, but the report refers to “attached maintenance standards” that were not provided. Please provide a complete submittal so it can be accurately reviewed by the City storm water engineer. 11/12/08 – An operations and maintenance section was not added to the storm drainage technical report as requested. Please revise and resubmit. 10/6/08 – Maintenance standards were provided with the response letter. The standards state the conditions under which maintenance is required, but do not state how the maintenance will be performed. Please add an operations and maintenance section to the Storm Drainage Technical report and call out a specific maintenance schedule and acceptable method for cleaning and disposal of debris/sediment. Highway 99-23904_bld20080444_Taco Time_5 Page 1 of 2 9/9/08 – The comments below were provided on 7/23/08, but were not addressed with this submittal. Please callout maintenance provisions on plans or in technical report. 1.ok 2.Maintenance provisions are required to ensure adequate maintenance of the oil/water separator. If the system is not maintained regularly it is not an acceptable method for providing water quality. C-1 - STORM DRAINAGE & UTILITY PLAN ok 1. ok 2. ok 3. ok 4. ok 5. ok 6. 7.12/11/08 – The grease interceptor location was revised and it appears as though the side sewer from the Taco Time building will run through the interceptor. The interceptor shall only receive flows from the kitchen facilities and not from the restrooms. Clearly show separate sewer lines for each and provide invert elevations at the grease interceptor, as previously requested. 11/12/08 – Invert elevations have not been provided as requested. Please revise and resubmit or redline plans on file with the City. 10/6/08 – The grease interceptor location has been added to sheet A1.0, but the sewer pipe into and out of the interceptor has not been shown. Please show the GI and utility pipe on the civil utility plan. Provide invert elevations at cleanouts. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. Highway 99-23904_bld20080444_Taco Time_5 Page 2 of 2