Highway 99-23904_bld20080444_Taco Time_6.pdf
DATE: December 16, 2008
TO: Rick Lentz
rickl@mlarch.com
FROM: Jeanie McConnell, Engineering Program Manager
RE: Application #: bld20080444
Project: Taco Time
Project Address: 23904 Highway 99
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Marie Harrison.
City of Edmonds handouts and standard details can be referenced on the City website under
Development Services Department, Engineering Division.
Review 1 July 23, 2008
Review 2 September 9, 2008
Review 3 October 6, 2008
Review 4 November 12, 2008
Review 5 December 11, 2008
Review 6 December 16, 2008
C-1 - STORM DRAINAGE & UTILITY PLAN
ok
1.
ok
2.
ok
3.
ok
4.
ok
5.
ok
6.
Highway 99-23904_bld20080444_Taco Time_6 Page 1 of 2
7.12/16/08 The civil plan sheets were revised to show two separate lines for the sewer
system (one for the general building plumbing and one specific to the grease interceptor),
but invert elevations still have not been provided. The invert elevations need to be shown
on the plans so the proper location of the grease interceptor can be determined and it can
be verfied that the sewer pipe will be installed with a minimum 2% slope, per City
standards. The asbuilt information provided from Olympic View Water and Sewer
District does not provide invert elevations. Invert elevations at the building and the grease
interceptor need to be added to the plans.
12/11/08 The grease interceptor location was revised and it appears as though the side
sewer from the Taco Time building will run through the interceptor. The interceptor shall
only receive flows from the kitchen facilities and not from the restrooms. Clearly show
separate sewer lines for each and provide invert elevations at the grease interceptor, as
previously requested.
11/12/08 Invert elevations have not been provided as requested. Please revise and resubmit
or redline plans on file with the City.
10/6/08 The grease interceptor location has been added to sheet A1.0, but the sewer pipe into
and out of the interceptor has not been shown. Please show the GI and utility pipe on the civil
utility plan. Provide invert elevations at cleanouts.
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have
specific questions regarding these plan corrections.