Highway 99-24325_Campbell Nelson_bld20080239_Cafe_TIA.pdfRECEIVED
APR I loi, 2008
E-NGINEEnING DIVISION
k) CITY OF EDMONDS
�A
4,
(&AFFIC IMPACT ANALYSIS
��00 I I WORK SHEET
,)I "
Name of Proposed Project: V d� -- a
Owner/Applicant:
/JhP/q\'a
Naive
Street/Mailing A dress
City State Zip
Telephone:
Applicant Contact Person:
R
Str e ailingddress
41
City State Zip
Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis:
Firm, Name Contact -Name
1. PROJECT DESCRIPTION
a. Street address (if known):
b. Location:
c. Specify existing land use:
d. Specify proposed type and size of development:
Telephone
all
(Attach a vicinity map and site plan.)
e. When will the project begin construction and when will it be completed? q, 4
f Define proposed access locations:
g. Define proposed sight distance at site egress locations:
Page I
Five Years After Opening LOS:
With Project:
Without Project:
Note any assumptions/variations to standard analysis default values and justifications:
State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact
.fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified
,S \E,NGRU)a,iv1hCity ProjectsVIIA (3"idclillc,5VI'riflu7pAnalyWork 9-04 (10C Page 5
"Zile) U
Ile
RECEIVED
APR I '
ENONEEFUNG DOSION