Loading...
Highway 99-24325_Campbell Nelson_bld20080239_Cafe_TIA.pdfRECEIVED APR I loi, 2008 E-NGINEEnING DIVISION k) CITY OF EDMONDS �A 4, (&AFFIC IMPACT ANALYSIS ��00 I I WORK SHEET ,)I " Name of Proposed Project: V d� -- a Owner/Applicant: /JhP/q\'a Naive Street/Mailing A dress City State Zip Telephone: Applicant Contact Person: R Str e ailingddress 41 City State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis: Firm, Name Contact -Name 1. PROJECT DESCRIPTION a. Street address (if known): b. Location: c. Specify existing land use: d. Specify proposed type and size of development: Telephone all (Attach a vicinity map and site plan.) e. When will the project begin construction and when will it be completed? q, 4 f Define proposed access locations: g. Define proposed sight distance at site egress locations: Page I Five Years After Opening LOS: With Project: Without Project: Note any assumptions/variations to standard analysis default values and justifications: State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact .fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified ,S \E,NGRU)a,iv1hCity ProjectsVIIA (3"idclillc,5VI'riflu7pAnalyWork 9-04 (10C Page 5 "Zile) U Ile RECEIVED APR I ' ENONEEFUNG DOSION