HOA APPROVAL LETTER.pdfSeavue Condominium
Seavue Association of Apartment Owners
1130 5'" Avenue South #B1
Edmonds WA 98020
Date: October 24, 2017
To: Bill and Terry Anderson, Unit �U
From: Jay Grant, President
Jay Grant, President
T: 206.451.0493
E: jay@jaygrant.com
CC: Leif Bjorback
City of Edmonds, Building Official I TAKE THIS LETTER TO THE CITY TO OBTAIN A PERMIT
RE: Authorization of Construction — Unit 202
Seavue Association of Apartment Owners "Seavue", a Washington State non-profit organized under the
laws of the State of Washington; hereby authorizes the owners of said unit to submit for a permit to the
City of Edmonds and or State of Washington. The owner of the common and limited common areas of
the condominium and its property are located at 1130 5th Avenue S. Edmonds Washington 98020.
The owner(s) of the unit understand the common and limited common areas of Seavue come under the
director control of the HOA and all work, of any kind, performed are subject to the permission, control and
requirements of the HOA through the Board, its President or designated representative, as provide by
under RCW 64.34 and applicable aspects of RCW 64.32.
Seavue offers the owners of the said unit to perform construction work under the terms of this letter within
the confines of requirements of the Seavue Declaration, it bylaws, policies and administrative rules; and
requirements, ordinances, regulations, and laws of the City of Edmonds, County of Snohomish and State
of Washington.
The owner is permitted to do the following work; and such work must be performed by a licensed and
insured contractor based on requirements of the City, County and State.
• Owner will be stripping out the shower enclosure, exposing the wall structure of the building,
which could expose water pipes and electrical. Contractors remodeling the two bathrooms to
include removing the master shower and hall tub. Work will be performed on the water pipes and
water flow regulators will be changed out in the master shower and moved in the hall bath to
accommodate a new shower in place of the current bathtub.
• Hard Surface Work: Surfaces in the bathrooms may be replaced with tile, using sound proofing
material, and a cork underlayment is recommended. All hard surface work is subject to approval
in accordance with the Seavue Declaration. Please refer to Seavue Flooring Policy adopted on
May 7, 2015. Not following these requirements can mean removal of any and all material at the
owner's cost.
Any changes to your scope of work after approval from Seavue and any city, county or state agency
requires immediate notification of the parties. All costs, including any permits, architectural and envelope
requirements, performance of construction, any damage to the building structure, and any dump
requirements shall be the sole responsibility of the owner. If for some reason Seavue provides any other
costs for some reason at later time, a separate letter will be issued.
CN:SV241017PermitA
Seavue Condominium
Seavue Association of Apartment Owners
1130 5`" Avenue South #B1
Edmonds WA 98020
Page 2.
Unit 202
Any contractors or professionals be shall registered with Seavue or the president or property manager.
Permits issued shall be posted on the Seavue bulletin board adjacent to the elevator in the basement,
and at the worksite; and a copy of any permits shall be submitted to Seavue prior to any construction. It
is the owner's responsibility to ensure Seavue is notified of any inspections prior to taking place by any
city, county or state official so a Seavue representative may be present as a condition of approval.
The owner is advised to refer to the Living at Seavue — Seavue House Rules as several sections of the
document refer to rules and requirements; this would also include times construction work is permitted. It
is the owner's responsibility to ensure any contractors or professional is aware of these conditions,
requirements and rules. Contractors not adhering to governing rules may be banned from working at
Seavue.
Further, this authorization is subject to working with the Seavue who has direct control and responsibility
over any common areas, limited common areas, and all safety issues. Such coordination shall be done
through the property manager or president. This authorization is subject to inspection, suspension or
withdrawal at will and any time. If any of the conditions are not met at anytime all construction shall
cease immediately, until Seavue reinstates permission.
If you or the City Planning Department has any questions please feel free to contact me.
Sincerely,
Jay Grant
CN:SV241017PermitA