Plan Review Corrections
Plan Check : Date:
# 06-050 / BLD20060575 July 7, 2006
Project Name/Address:
Gurnee SFR / Homeview Dr - 18210
Contact Person/Address/Fax:
Phil King / Phone 425-776-1245, Fax 425-745-2933 ___
Reviewer: Edward SibrelDivision:Engineering
During review of the subject submittal it was found that the following information, corrections, or
clarifications will need to be addressed:
1.The proposed retaining wall on the uphill side of the driveway is both within a Critical Area and is 7 feet
in height, each characteristic in itself triggering the requirement for an engineering peer review. The City
notes that the retaining wall verbage within the Geothech’s report is of a generic nature and not
specificically addressed to the planned retaining wall, and does not address the criteria of Edmonds
Community Development Code 23.80.070. Please submit the design and calculations specific to this wall,
stamped by a licensed engineer for peer review. A retaining wall handout is included for your
convenience.
2.The proposed rockeries, while four feet or less in height, nonetheless exist in a Critical Area and the
must be met:
following additional submittal parameters
Two copies of section and elevation views must be submitted and be stamped by a licensed
professional engineer.
specific to the proposed rockeries
Two copies of design calculations must be submitted and be
stamped by a licensed engineer.
A letter from the geotechnical engineer addressing the criteria of ECDC 23.80.070.
3.Please note that the driveway shall not be of a slope exceeding 14% along any part of its length, including
the approach, without a driveway waiver granted by the City Engineer.
4.The site plan shows the driveway catch basin draining to the sanitary sewer. This is in error. Please revise
the drawing accordingly.
DATE FAXED PAGE ____ OF ___
5.Refer to the sidewalk determination letter. Please include sidewal, curb, gutter, saw cuts, and lane
dimensions from painted center line to curb face on site plan.
6.Include a sidewalk and curb detail on site plan.
7.Include a driveway access detail on the site plan.
Please resubmit three copies of the revised plans/documents to a Development Services Coordinator.
Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED PAGE ____ OF ___