Loading...
Homeview Dr - 18210_Gurnee_06-050-2.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 06-050 / BLD20060575 July 7, 2006 Project Name/Address: Gurnee SFR / Homeview Dr - 18210 Contact Person/Address/Fax: Phil King / Phone 425-776-1245, Fax 425-745-2933 ___ Reviewer: Edward SibrelDivision:Engineering During review of the subject submittal it was found that the following information, corrections, or clarifications will need to be addressed: 1.The proposed retaining wall on the uphill side of the driveway is both within a Critical Area and is 7 feet in height, each characteristic in itself triggering the requirement for an engineering peer review. The City notes that the retaining wall verbage within the Geothech’s report is of a generic nature and not specificically addressed to the planned retaining wall, and does not address the criteria of Edmonds Community Development Code 23.80.070. Please submit the design and calculations specific to this wall, stamped by a licensed engineer for peer review. A retaining wall handout is included for your convenience. 2.The proposed rockeries, while four feet or less in height, nonetheless exist in a Critical Area and the must be met: following additional submittal parameters Two copies of section and elevation views must be submitted and be stamped by a licensed professional engineer. specific to the proposed rockeries Two copies of design calculations must be submitted and be stamped by a licensed engineer. A letter from the geotechnical engineer addressing the criteria of ECDC 23.80.070. 3.Please note that the driveway shall not be of a slope exceeding 14% along any part of its length, including the approach, without a driveway waiver granted by the City Engineer. 4.The site plan shows the driveway catch basin draining to the sanitary sewer. This is in error. Please revise the drawing accordingly. DATE FAXED PAGE ____ OF ___ 5.Refer to the sidewalk determination letter. Please include sidewal, curb, gutter, saw cuts, and lane dimensions from painted center line to curb face on site plan. 6.Include a sidewalk and curb detail on site plan. 7.Include a driveway access detail on the site plan. Please resubmit three copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED PAGE ____ OF ___