Loading...
HWA Exploration Plan Document.pdfHWAGEOSCIENCES INC, U March 11, 2009 HWA Project No, 2009-028-21 Roth Hill Engineering Partners, LLC, 2600 116"' Avenue NE, Suite 100 Bellevue, Washington 98004 Attention: Mr. Ryan Brady Subject: EXPLORATION PLAN FOR 76TH AvE W SE'v%1E R LINE REPLACEMENT EDMONDS, WASIIINGTON. The following letter addresses the issues pertaining to conducting a geotechnical exploration program to develop recommendations for the upsizing of approximately 2,200 linear feet of pipe along 76"' Ave W in Edmonds, Washington. Our exploration plan consists of drilling five 30 foot deep borings in the paved roadway of 76"' Ave W between Olympic View Drive and 175"' St SW, as seen on Figure 1, Site and exploration plan. Also we will install tl-n-ce piezometers in the borings to monitor local ground water elevations. The location and pertinent statistics for each planned exploratory boring is listed in Table 1. In support of this work, we have also developed a traffic control plan using the WSDOT Work Zone Traffic Control Guidelines (2008). EXPLORATIONS AND PIEZEOAIETER INSTALLATION Explorations will be conducted utilizing a truck mounted drill rig, A hollow stem auger will be advanced with the drill rig and samples -will be collected every 2.5 to 5 feet of drilling. The borings will be abandoned per Washington Department of Ecology Standards and patched at the surface with quick setting cement dyed to match the color of the asphalt. Where piezometers are installed they will be installed per Washington Department of Ecology Standards, and finished at the surface with a locking flush mount cap. TRAFFIC CONTROL PLAN FOR EXPLORATORY BORINGS Site Location and Statistics: 76t�'Ave W from Olympic View Drive to 19730 - 6487 fWenue \N7. 175"' St SW. The site is a 2,200 long foot stretch of two lane road running S 2, (") 0 north south and intersecting with Olympic View Drive to the south, as Lynnwood, WA 98036,5957 'I'd: 425�774,01106 kix: 425.774.2714 Nymv.hwagcoxom March 11, 2009 HWA Project No. 2009-028 shown in Figure 1. The speed limit is 30 mph and there are four cross streets within the site boundary.. Scope of Work: The work will consist of drilling five 8" diameter exploratory boring in the center of the travel lane at the locations shown on Figure 1 and listed in Table 1. The work will be stationary. Duration of Work: It will take approximately 1 to 2 hours to complete the work at each location where only a boring is proposed, and 2-3 hours at the locations where a piezometer is proposed. Tentative Date and Hours of Work: Work will occur between 8:00 AM to 4:00 PM. The work has tentatively been scheduled for March 18"' and 19"' 2009. General Traffic Plan Layout: The single lane road closure will follow all guidelines and regulations set forth by WSIDOT traffic plan TCP -1, as shown on Figure 2, Distance calculations:. All distance calculations are based on a 30 mph speed limit. Sign spacing- X=200 feet Buffer Data- B= 200 feet Taper/Tangent- will be 20 and 40 feet, respectively 0.0 If you have any questions or require additional information, please contact the undersigned at (425) 774-0106. Sincerely, PI A GEOSCIENCES INC. Geologist Attachments: Figure 1 Figure 2 ✓ Steven E. Greene L.G., L.E.G. Senior Engineering Geologist Vice President Site Vicinity Map WSIDOT Traffic Control Plan TCP -1 Exploration Plan.doc 2 I:IWA GeoSciences Inc.. March 11, 2009 HWA Project No. 2009-028 Poring Proposed Mapped Location Relative "Travel PiezometerDesignation Depth (ft.) Location to Sewer Line Lane 820 feet South of 92 feet North of North BH -1 30 No 18011, St. SW Manhole 8-18 Bound 205 feet South of 177 feet south of North BH -2 30 180`1, St SW Manhole 8-16 Bound Yes 143 feet North of 34 feet South of South BH -3 30 No 180i1, St SW Manhole 8-15 Bound 115 feet South of 72 feet South of North BH -4 30 Yes 178t'PI SW Manhole 8-1.4 Bound 90 feet South of 100 feet south of North BH -5 30 Yes 175t" St S Manhole 8-10 Bound F,xploratioti Plamdoc 3 HWA GeoSctences Inc.. MAP NOT TO SCALE KEY'.. w; BODING DESIGNATION AND APPROXIMATE LOCATION HWAGEOSCIENCES INC. 74, - o -. i- Ali� 76TH AVE W TRUNKLINE SEWER REPLACEMENT CITY OF LYNNWOOD EDMONDS, WASHINGTON 11 FIGURE NO. PROJECT NO. 2009-028 U4 co a. W tu w d z w cr to 16 C> C> I� zm IS 11 1 ow z uj 2 9 �z J9 t3 z Z ow <1 wci 45 (1) W w U 2 9 B UA LL < 12 . wZF - -� w 'o LL w E 5; m a 17 W .13 2,n :9 El 0 -6 Lu 0 E E I-- Z' 5e g a or z z,$ Qc 0- wl U4 co a. W tu w d z w cr to 16 0 I� zm IS 11 1 ow z uj 2 ® J9 t3 z Z ow w 45 (1) W w U 2 9 B U4 co a. W tu w d z w cr 16 0 uj 2 ® J9 t3 z Z ow w 45 (1) 0 0 w 9 B .13 2,n :9 El 0 -6 Lu E E I-- Z' g a or z z,$ Qc 0- I)v w 0 z - 0 C3 w U4 co a. W tu C) F - 00 0 C) C14 dcNZ d, z 0 LLJ C5 0 CL W FAI w z w cr uj Z z Z ow w (1) w C) F - 00 0 C) C14 dcNZ d, z 0 LLJ C5 0 CL W FAI