Loading...
Hyundai_Building Revision #3 Response 08.23.19.pdf3 1 r I k architecture I design Protect #BLD2019-0120-Hyundai Sales & Service Center- Revision #1 Building Summary Date: August 23, 2019 To: Leif Bjorback, City of Edmonds Building Official From: Frank Karreman Project Number: BLD2019-0120 Address: 22130 Pacific Highway 99, Edmonds WA The following are responses to the letter Leif Bjorback, the City of Edmonds Building Official, prepared regarding Revision #1. Each modification to the drawings is shown clouded and enumerated with a triangle symbol #3 on the drawings, as follows below. Architectural Drawings 1) Site Plan A1.0- Redline notations required by the City have been added. 2) Code Analysis A2.0- Building Analysis updated to include carport SF and City redline notations. 3) First Floor Plan A2.1- Square footage added to First Floor title note, redline notations required by the City have been added. 4) Second Floor Plan A2.3- Redline notations required by the City have been added 5) Roof Plan A2.5- Redline notations required by the City have been added 6) Exterior Elevations A4.0- Redline notations required by the City have been added 7) Interior window and door schedules A5.1- Doors 102, 103, and 104 shown 36" wide on schedule End of revisions Hyundai Sales & Service Center Edmonds Building Division Itemized Revision Summary 08.23.19