Hyundai_Building Revision #3 Response 08.23.19.pdf3 1 r I k architecture I design
Protect #BLD2019-0120-Hyundai Sales & Service Center- Revision #1 Building Summary
Date: August 23, 2019
To: Leif Bjorback, City of Edmonds Building Official
From: Frank Karreman
Project Number: BLD2019-0120
Address: 22130 Pacific Highway 99, Edmonds WA
The following are responses to the letter Leif Bjorback, the City of Edmonds Building Official,
prepared regarding Revision #1. Each modification to the drawings is shown clouded and
enumerated with a triangle symbol #3 on the drawings, as follows below.
Architectural Drawings
1) Site Plan A1.0- Redline notations required by the City have been added.
2) Code Analysis A2.0- Building Analysis updated to include carport SF and City redline notations.
3) First Floor Plan A2.1- Square footage added to First Floor title note, redline notations required by
the City have been added.
4) Second Floor Plan A2.3- Redline notations required by the City have been added
5) Roof Plan A2.5- Redline notations required by the City have been added
6) Exterior Elevations A4.0- Redline notations required by the City have been added
7) Interior window and door schedules A5.1- Doors 102, 103, and 104 shown 36" wide on schedule
End of revisions
Hyundai Sales & Service Center
Edmonds Building Division
Itemized Revision Summary 08.23.19