Loading...
IMPACT FEE-TRANSPORTATION-BLD20191013.pdfR77 EI ED AUG 15 2019 APPENDIX A Page 1 of 2 Transpo H%npact Analysis Worksheet , r%a 1.16 PERMITTING & DEVELOPMENT ENGINEERING DIVIS10N 121 5th AvenU N P: 425.771.0220 www.ed i-noncl.<.swa.gov Name of Proposed Project: Jenkins Lane - Lot 1 Owner/Applicant Echelbarger Homes & Land, LLC Name 4001 198th St. SW. #2 Street/Mailing Address Lynnwood WA 98036 City State Zip Telephone: 425.673.1100 Www1`1doom Applicant Contact Person: Todd Echelbarger Name Same Street/Mailing Address City Telephone: 206.920.3673 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION a. Location - Street address: 720 13th Way SW Contact Name E-mail: State .Zip (Attach a vicinity map and site plan.) b. Specify existing land use: Demolished existing home and I am building a new home on the lot c. Specify proposed type and size of development: Construct one single family home +/- 3,000SF (# of residential units and/or square footage of building) d. Date construction will begin and be completed: 9/15/2019 to March 1, 2020 e. Define proposed access locations: Private driveway connecting to 13th Way SW APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: No limitations 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. New Use Prior Use ITE Land Use Category Per Unit Fee Rate 210 $ 6,249.14 210 $ 6,249.14, Units in square feet, # of dwelling, of , etc. X 1 X 1 = Fee New Use Fee: $ 6,249.14 - I Prior Use Fee: $ 6,249.14 J= $ 0 11 LJ NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use $ ❑ OTHER Units in square feet, # of dwelling, vfp, etc. X' _ Fee MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ F— TOTAL TRANSPORTATION IMPACT FEE $ kk City of Edin6ndg, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.