IMPACT FEE-TRANSPORTATION-BLD20191013.pdfR77 EI ED
AUG 15 2019
APPENDIX A
Page 1 of 2
Transpo H%npact Analysis
Worksheet , r%a 1.16
PERMITTING & DEVELOPMENT
ENGINEERING
DIVIS10N
121 5th AvenU N
P: 425.771.0220
www.ed i-noncl.<.swa.gov
Name of Proposed Project: Jenkins Lane - Lot 1
Owner/Applicant
Echelbarger Homes & Land, LLC
Name
4001 198th St. SW. #2
Street/Mailing Address
Lynnwood WA 98036
City State Zip
Telephone: 425.673.1100
Www1`1doom
Applicant Contact Person:
Todd Echelbarger
Name
Same
Street/Mailing Address
City
Telephone: 206.920.3673
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
a. Location - Street address: 720 13th Way SW
Contact Name
E-mail:
State .Zip
(Attach a vicinity map and site plan.)
b. Specify existing land use: Demolished existing home and I am building a new home on the lot
c. Specify proposed type and size of development: Construct one single family home +/- 3,000SF
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed: 9/15/2019 to March 1, 2020
e. Define proposed access locations: Private driveway connecting to 13th Way SW
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations: No limitations
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
New Use
Prior Use
ITE Land Use Category
Per Unit
Fee Rate
210
$ 6,249.14
210
$ 6,249.14,
Units in
square feet,
# of dwelling,
of , etc.
X 1
X 1 =
Fee
New Use Fee: $ 6,249.14 - I Prior Use Fee: $ 6,249.14 J= $ 0 11
LJ NEW DEVELOPMENT
ITE Land Use Category
Per Unit
Fee Rate
New Use
$
â OTHER
Units in
square feet,
# of dwelling,
vfp, etc.
X' _
Fee
MITIGATION FEE RECOMMENDATION:
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee
$
Fâ TOTAL TRANSPORTATION IMPACT FEE
$
kk
City of Edin6ndg, Engineering Division Approval Date
1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.