Loading...
IncompleteLetter.pdf April 19, 2007 Jeff Sellentin th 785 16 Place Mukilteo WA 98275 RE: REQUEST FOR ADDITIONAL INFORMATION TO COMPLETE YOUR ADU CONDITIONAL USE PERMIT, FILE # CU-2007-25. Dear Mr. Sellentin: Thank you for submitting an application for an administrative conditional use permit for an th Accessory Dwelling Unit (ADU) at the property located at 15701 75 Place West in the Single- Family Residential (RS-20) zone. City staff has finished the check for completeness on your INCOMPLETE application, and it is determined that your application is until the following materials/clarifications are submitted: 1.Contact Information: The land use application submitted states that the applicant is “Jeff Sellentin” – if this is the case, please sign the land use application (available in the Planning Division) under the signature block for the Applicant/Agent. The property owner, “Van Caryl” has signed in both places. Is Van the contact person for this project (“Applicant/Agent”)? Please clarify and/or revise the land use application. 2.ADU Covenant: Please review the enclosed “ADU Covenant” and sign it before a notary of public. This will be recorded after you receive approval for an ADU and prior to occupancy. The fee to record legal-sized documents at the County is $32, and we would be happy to have this recorded for you (but we charge an additional $15 service fee to do so). Please do not record the covenant at this time, please just review the language and be prepared to turn this in for recording at a later date (around the time of ADU approval). 3.Building Permit: Please review the enclosed letter by Plans Examiner Jenny Readwin. This site is located within the North Edmonds Earth Subsidence and Landslide Hazard Area, which requires not only building permit approval but also must comply with the development requirements of Ordinance 3632. Please contact the Building Division at 425.771.0220 if you have any questions about building permits for sites in this specific area. 4.Criteria Statement: Please submit the required “Criteria Statement” so we can review your proposal and see if it meets the ADU code requirements. I’ve enclosed the handout on ADUs and I’ve highlighted some areas that you’ve left out of your application so that you can review them and address them in your response. You are going to need to prove that you meet all of these criteria in order to receive ADU approval. 5.Site Plan/Floor Plan: Several important items were missing from the site plan and floor plans which are critical to my review of the proposal. a.Parking: How are you providing the required three parking spaces on site? Please show the dimensions on the site plan so that the Engineering Division can review it under their parking requirements. b.Size: The ADU appears to take up the whole downstairs, which exceeds the 800 square foot size threshold (it appears to be well over 1,500 square feet in area). Please review the size criteria shown on the ADU handout enclosed. Please show how you meet the size requirements for an ADU in your Criteria Statement and on the floor plans. 6.Grading: Please provide me with an estimate on the amount of grading that will be necessary for the eventual building permit application. The State Environmental Policy Act (SEPA) requires that the City make an environmental determination on projects which exceed 500 cubic yards of grading. Please respond at your earliest convenience so that your application may be processed in an expedient manner. Thank you for your interest in land use and development in Edmonds. If you have any questions about the City’s application review process and/or the schedule for your application, please contact me at 425.771.0220, extension 1778. Sincerely, CITY OF EDMONDS Gina Coccia, Planner Enclosures c: File ADB-2007-25 Jenny Readwin, Plans Examiner th Van Caryl (Caryl Family Living Trust) – 15701 75 Place West, Edmonds WA 98026