Loading...
Inspection Correction Notice.1.26.15.pdfZulauf, JoAnne To: neil@americanbrewing.com Subject: Final Inspection Neil, On my inspection to your site on Monday, January 26, it was noted that sediment from the adjoining dog area and from the stored barrels was entering the storm catch basin. After discussion with staff, it was determined that an acceptable solution to this issue would be installing a catch basin insert sock usually used for catch basin protection during construction. This would help reduce the discharge into the storm and into the marsh. Please provide an alternate plan to prevent this problem or install an insert sock and call for a reinspection. I will be contacting the dog daycare owners and requesting they provide some barrier between your properties to catch the sediment on their site from entering the storm system. Thank you for your help! JoAnne Zullauf I Seirfloir II:::ingiineeiding 11 edhirflca iairl ingiinee iing Il)n,uii ionµ: I Cit:v of Il:t:lu° on d L!", p ; r' Aiie PJ I II:dm o nds, '1101a 980,"10 °5 ° 6 ...��" �� � � � .'gyp, � � is � "� ��;',!!' � :.A,.• � V �r . �� S 750 Joanne.Zulauf@edmondswa.gov