Loading...
Interstitial Racks.pdf May 4 2015 Submittal Review Swedish Edmonds ACCApril 28, 2015 Project:Date: of 1 1 Page: Barb Gipple - NBBJ Architect: Scott Solberg - HermansonAdam Bettcher Contractor:Reviewed by: NO EXCEPTIONS TAKEN REJECTED MAKE CORRECTIONS NOTED SUBMIT SPECIFIED ITEMS REVISE AND RESUBMIT SUBMITTAL NOT REQUIRED & NOT REVIEWED This review is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents. Corrections or comments made during this review do not relieve contractor from compliance with the requirements of the drawings and specifications and do not authorize changes to contract cost. Contractor is responsible for: Dimensions which shall be confirmed and correlated at the job site; fabrication process and techniques of construction; coordination of his work with that of all other trades; performing his work in a safe manner. Sparling has reviewed the copy of the Submittal 196.230548.0 received electronically on April 16, 2015, and our comments are as follows. (Note: All of our review comments are contained in this document. There are no markups on any of the information sheets submitted.) Section 230548 – Vibration and Seismic Controls for Mechanical Piping and Equipment 1.The submittal contains structural calculations, the sizing of members of the interstitial racks, and information for where equipment will be connected to the rack. We take no exceptions to this submittal. Maureen Jackson – Sparling cc ab:filename 4100 194th St SW • Suite 400, Lynnwood, Washington 98036-4613 206-667-0555 800-667-0610 Fax: 206-667-0554 www.sparling.com nformation given in the contract documents. Any action shown is subject to the ated at the job site's fabrication processes and techniques of construction; MECHANICAL SUBMITTAL Swedish Edmonds ED Expansion - Mechanical Submittal Review CommentsPage 1 of 14/21/2015 REVIEW COMMENTS Remarks Reviewed For Info Only Not Reviewed Not Approved Revise and Resubmit Submittal Status Make Corrections Noted XPetra4/16/154/21/15X No Exceptions Taken Reviewed Date Green highlight indicates "No Exceptions Taken" or "Make Corrections Noted"; status of current submittal Checking of submittals is only for general conformance with the design concept of the project and general compliance with the i requirements of the plans and specifications. The contractor is responsible for dimensions which shall be confirmed and correl Swedish/Edmonds ED Expansion Received Date CDi PN 2013-024.00 Yellow highlight indicates "Revise and Resubmit" or "Not Approved"; status of current submittal Manufacturer coordination of his work with that of all other trades; and the satisfactory performance of his work. O&M Manual A/E Review Mechanical Racks - Calcs, Anchorage 23 05 48 Mechanical Vibration Controls and Seismic Restraints Seismic Bracing for Interstitual Description s g Drawin p Sho , Details Number 23 05 482.4196-010.0 Sub Number Para Number Spec Submittal Approval Page 196 Swedish Edmonds - Ambulatory Care ClinicSubmittal #: Submittal Spec #:230548.010-0 Preparer ApprovalSellen Approval Spec SectionSub SectionRevision A. Approved as noted for A/E Review 2305480B. Revise & Resubmit C. Rejected Seismic & Vibration Control Interstitial Mechanical Racks This review is for general conformance with the plans and specifications only. Any deviations from same not clearly noted by the subcontractor have not been Calcs, Anchorag Details & Shop Drawings reviewed. Review shall not constitute a complete check or detailed dimensions or count or serve to relieve the subcontractor of contractual responsibility for any error or deviation from contract requirements. Prepared By: Sellen Construction Jason Petterson HermansonBy: Scott SolbergDate: 04/16/15 Architect ApprovalEngineer / Consultant Approval sages04/27/2015 Swedish Edmonds ACC - 0196-230548-010.0 SUBMITTAL # CDi+Mazzetti - SUBMITTAL REVIEW THIS SUBMITTAL HAS BEEN REVIEWED BY THE UNDERSIGNED NO EXCEPTIONS TAKEN MAKE CORRECTIONS NOTED NOT APPROVED REVISE AND RESUBMIT REVIEWED AS NOTED ON CDi SUBMITTAL LOG REVIEWED FOR MECHANICAL INFORMATION ONLY Checking of submittals is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents. Any action shown is subject to the requirements of the plans and specifications. The contractor is responsible for dimensions which shall be confirmed and correlated at the job site's fabrication processes and techniques of construction; coordination of his work with that of all other trades; and the satisfactory performance of his work. Rick Grove Apr 21, 2015 BY:DATE: 230548-010 Interstitial Rack and Rack Anchorage Details Submittal 4/14/15 ACC Interstitial Rack REVISED JOB NAME 1CEB 4/8/15 ACC Interstitial Rack REVISED JOB NAME 1CEB 4/8/15 ACC Interstitial Rack REVISED JOB NAME 1CEB 4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME 4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack 1CEB REVISED JOB NAME4/8/15 ACC Interstitial Rack