Interstitial Racks.pdf
May 4 2015
Submittal Review
Swedish Edmonds ACCApril 28, 2015
Project:Date:
of
1 1
Page:
Barb Gipple - NBBJ
Architect:
Scott Solberg - HermansonAdam Bettcher
Contractor:Reviewed by:
NO EXCEPTIONS TAKEN REJECTED
MAKE CORRECTIONS NOTED SUBMIT SPECIFIED ITEMS
REVISE AND RESUBMIT SUBMITTAL NOT REQUIRED & NOT REVIEWED
This review is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents.
Corrections or comments made during this review do not relieve contractor from compliance with the requirements of the drawings and specifications and do not
authorize changes to contract cost. Contractor is responsible for: Dimensions which shall be confirmed and correlated at the job site; fabrication process and
techniques of construction; coordination of his work with that of all other trades; performing his work in a safe manner.
Sparling has reviewed the copy of the Submittal 196.230548.0 received electronically on April
16, 2015, and our comments are as follows. (Note: All of our review comments are contained in
this document. There are no markups on any of the information sheets submitted.)
Section 230548 – Vibration and Seismic Controls for Mechanical Piping and Equipment
1.The submittal contains structural calculations, the sizing of members of the interstitial
racks, and information for where equipment will be connected to the rack. We take no
exceptions to this submittal.
Maureen Jackson – Sparling
cc
ab:filename
4100 194th St SW • Suite 400, Lynnwood, Washington 98036-4613
206-667-0555 800-667-0610 Fax: 206-667-0554
www.sparling.com
nformation given in the contract documents. Any action shown is subject to the
ated at the job site's fabrication processes and techniques of construction;
MECHANICAL SUBMITTAL Swedish Edmonds ED Expansion - Mechanical Submittal Review CommentsPage 1 of 14/21/2015
REVIEW COMMENTS
Remarks
Reviewed For Info Only
Not Reviewed
Not Approved
Revise and Resubmit
Submittal Status
Make Corrections Noted
XPetra4/16/154/21/15X
No Exceptions Taken
Reviewed
Date
Green highlight indicates "No Exceptions Taken" or "Make Corrections Noted"; status of current submittal
Checking of submittals is only for general conformance with the design concept of the project and general compliance with the i
requirements of the plans and specifications. The contractor is responsible for dimensions which shall be confirmed and correl
Swedish/Edmonds ED Expansion
Received
Date
CDi PN 2013-024.00
Yellow highlight indicates "Revise and Resubmit" or "Not Approved"; status of current submittal
Manufacturer
coordination of his work with that of all other trades; and the satisfactory performance of his work.
O&M Manual
A/E Review
Mechanical Racks - Calcs, Anchorage
23 05 48 Mechanical Vibration Controls and Seismic Restraints
Seismic Bracing for Interstitual
Description
s
g
Drawin
p
Sho
,
Details
Number
23 05 482.4196-010.0
Sub
Number
Para
Number
Spec
Submittal Approval Page
196
Swedish Edmonds - Ambulatory Care ClinicSubmittal #:
Submittal Spec #:230548.010-0
Preparer ApprovalSellen Approval
Spec SectionSub SectionRevision A. Approved as noted for A/E Review
2305480B. Revise & Resubmit
C. Rejected
Seismic & Vibration Control
Interstitial Mechanical Racks
This review is for general conformance with the plans and specifications only.
Any deviations from same not clearly noted by the subcontractor have not been
Calcs, Anchorag Details & Shop Drawings
reviewed. Review shall not constitute a complete check or detailed dimensions
or count or serve to relieve the subcontractor of contractual responsibility for
any error or deviation from contract requirements.
Prepared By:
Sellen Construction
Jason Petterson
HermansonBy: Scott SolbergDate: 04/16/15
Architect ApprovalEngineer / Consultant Approval
sages04/27/2015
Swedish Edmonds ACC - 0196-230548-010.0
SUBMITTAL #
CDi+Mazzetti - SUBMITTAL REVIEW
THIS SUBMITTAL HAS BEEN REVIEWED BY THE
UNDERSIGNED
NO EXCEPTIONS TAKEN
MAKE CORRECTIONS NOTED
NOT APPROVED
REVISE AND RESUBMIT
REVIEWED AS NOTED ON CDi SUBMITTAL LOG
REVIEWED FOR MECHANICAL INFORMATION ONLY
Checking of submittals is only for general conformance with the design
concept of the project and general compliance with the information
given in the contract documents. Any action shown is subject to the
requirements of the plans and specifications. The contractor is
responsible for dimensions which shall be confirmed and correlated at
the job site's fabrication processes and techniques of construction;
coordination of his work with that of all other trades; and the
satisfactory performance of his work.
Rick Grove Apr 21, 2015
BY:DATE:
230548-010
Interstitial Rack and Rack
Anchorage Details Submittal
4/14/15
ACC Interstitial Rack
REVISED JOB NAME
1CEB
4/8/15
ACC Interstitial Rack
REVISED JOB NAME
1CEB
4/8/15
ACC Interstitial Rack
REVISED JOB NAME
1CEB
4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME
4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack
1CEB
REVISED JOB NAME4/8/15
ACC Interstitial Rack