Loading...
INV20140043:r N V,2 ai// - 00 Y3 DIBBLE ENGINEERS INC. Structural Professional Structural Engineering Services ' Review Summary Edmonds Center Townhomes, HOA Attn: David Thiele, HOA President 3801 Kromer Ave, Everett, WA 98201 September 25, 2014 DEI Project: 14-402 Re: Structural Review — Rot damage decay and shoring Site Address: 624 Daley Street Unit 1 Edmonds, WA 98020 Snohomish County Assessor Parcel # 007 372 00100100 Dear Mr. Thiele: In coordination with the structural damage that was identified during an exterior paint and caulking project, DEI has reviewed and recommended immediate shoring to prevent a collapse from occurring. The conditions identified are located at the HOA's the north-west corner at an existing (4) 2x6 support framing beam that aligns under a bearing wall. The deck corner damage is the result of a water leak that contributed to a severe wood rot and decay internal of the framing floor and wall and created significant decay damage. Based on the extent of damage, decay, and debris from the rot, the building corner and deck are in a state of collapse. DEI completed a site visit on September 25, 2014 to review the installed and completed shoring, consisting of a sleeper GLB 5- I/5x12" beam inset under the decay area, with a series of 2x6 shoring studs. The studs were braced in the weak axis at approximately at 4' on center to prevent lateral buckling. The shoring as completed provides a redundant load path for the building corner to allow occupancy to remain. The condition as noted will need a structural replacement beam and a permit with the city. The excessive decay damage will require a replacement of the bundled (4) 2x6 beam which spans approximately six feet from a post internal of the garage out to the face of the garage. The location'of the beam under the bearing wall framed above will require short term wall support, and removal of the damaged and decayed deck sheathing. The full extent of the decay is not yet exposed, but we would expect that the garage header and support studs may also need to be replaced. With the current shoring in place, DEI recommends further exposing the full extent of the damage and decay for review by the Architect and Engineer prior to the repair and replacement. Based on the extent of the decay, DEI recommends the City be notified for their review and permitting of the repairs. Mr. David Thiele, the HOA president concurs. Please contact us with any questions or clarifications. Sincerely, DIBBLE ENGINEERS, INC. Robb A. Dibble, RE Prinicpal CC: Keith Soltner, AIA, Soltner Group Architects City of Edmonds — Builidng Official, Attachments: Partial framing plan — Sketch A.. jo wASHy o� w 1� .� �3745 TONAL I y 1 1029 Market Street Page 1 of I A 425-828-4200 Kirkland, WA 98033 F. 425-827-6131 DIBBLE ENGINEERS, I N C Project No. Sheet No. Project Date Subject �'I'Z AM ► I�L�, � y� U -r' By Of { -. _.._ �A1-1 A61t oc-A77Oh,3 C,ly'jC 0r -<i+vrzj"'-� -13cccXO c�� S %.'r INV2oI4-oDL+3 Johns, Kristin From: Bjorback, Leif Sent: Friday, September 26, 201410:51 AM To: Johns, Kristin Subject: FW: Edmonds Center Townhomes Attachments: 2014-09-25 005.JPG; 2014-09-25 011.JPG; 2014-09-25 019.JPG; 2014-09-25 021.JPG; DEI Review 9-26-14.pdf Will you please start an INV on this address and attach -this email info? Thanks Leif From: Robb Dibble [mailto:Robb@DibbleEngineers.com] Sent: Friday, September 26, 2014 9:31 AM To: Josh Twigg; Bill Bogen; 'Emily Hill' Cc: 'Keith Soltner'; Dawn Fraser; Mike Johnson; Bjorback, Leif Subject: RE: Edmonds Center Townhomes Good Morning, Thank you David for the time to provide access. Thank you Josh for the emergency shoring —the building is stabilized to allow for continued occupancy of the unit above. City Building Official Mr. Bjorback, please see the attached structural review summary and framing sketch with the attached photos for the substantial decay area identified that will need support of the wall framing above in the process of completing the beam replacement. This letter is to confirm that shoring is in place, and that the building is stabilized, and to alert the City of the issue, and that it is being properly handled. Thanks, Robb A. Dibble, PE Principal Dibble Engineers, Inc. Professional Structural Enoisearinn Smicft 1029 Market Street, Kirtland, WA 98033 office: (425) 828-4200 tax: (425) 827-6131 www.dibbleeneineers.com office ext.222 From: Josh Twigg [mailto:josh@ruffconstruction.com] Sent: Thursday, September 25, 201412:07 PM To: Bill Bogen; 'Emily Hill' Cc: 'Keith Soltner'; Dawn Fraser; Mike Johnson; Robb Dibble Subject: RE: Edmonds Center Townhomes I called Dave Thiele this morning and received verbal authorization to engage DEI to review the shoring per the DEI proposal. Robb will attend a meeting at the project site this morning at 11am with Dave and Emily. Best Regards, Bill Bogen, Sr. Project Manager Soltner Group Architects 206.547.7288 Office 206.384.1548 Mobile www.soltne[group.com From: Bill Bogen [mailto:Bill@soltnergroup.coml Sent: Thursday, September 25, 2014 8:31 AM To: 'Emily Hill' Cc: Keith Soltner; 'Josh Twigg'; 'Dawn Fraser'; 'Mike Johnson'; 'Robb Dibble'; bill@soltneraroug.com Subject: Edmonds Center Townhomes Hello Emily, I have attached a proposal from Dibble Engineers to assist in the repair of the damage at the Unit 1 garage. I have also mailed a copy to Dave Thiele. We work closely with Robb Dibble and recommend DEI be approved to assist in this repair. Please call with any questions. RUFF crew: How is the shoring progressing? Best Regards, Bill Bogen, Sr. Project Manager Soltner Group Architects 206.547.7288 Office 206.384.1548 Mobile www.soltnergroup.com 3 Good afternoon, Attached are eight (8) pictures of the existing joist(s) once the drywall was removed as well as the erected shore wall. If there are any questions that either you may have please do not hesitate in contacting me. Thank you in the opportunity in providing our services, Joshua J. Twigg, General Manager R.C.I. 6505 Place SE, Woodinville, WA. Office: 425.487.0702 I Fax: 425.487.0772 �r�ry�r RUFFCONSTRUCTION,COM Celebrating 27 Years as Your Multi -Family Renovation Experts! MV From: Josh Twigg Sent: Thursday, September 25, 2014 10:27 AM To: 'Bill Bogen'; 'Emily Hill' Cc: 'Keith Soltner; Dawn Fraser; Mike Johnson; 'Robb Dibble' Subject: RE: Edmonds Center Townhomes Good morning, I am awaiting photo's from my crew that installed/erected the shore wall, as soon as I receive them I will immediately forward to all parties. Mr. Dibble; if at your meeting this morning in review of the shore wall there are any modifications that are felt needed to be made please let me know and I will act accordingly/expeditiously in getting them taken care of. The client is in great hands with both SGA and DEI, we at Ruff look forward in potentially assisting the two of you moving forward with the needed repairs. Thank you all for your time and please do not hesitate in contacting me if I may be of any assistance (cell; 425.351.2032), Joshua). Twigg, General Manager R.C.I.6505 233111 Place SE, Woodinville, WA. Office: 425.487.0702 1 Fax: 425.487.0772 W WVV. RUFFCONSTRUCTI ON .COM Celebrating 27 Years as Your Multi -Family Renovation Experts! From: Bill Bogen fmailto:Bi[IC&soltnergrouo.coml Sent: Thursday, September 25, 2014 10:19 AM To: 'Emily Hill' Cc: 'Keith Soltner'; Josh Twigg; Dawn Fraser; Mike Johnson; 'Robb Dibble'; 'Bill Bogen'; bill@soltnergroup.com Subject: RE: Edmonds Center Townhomes All, Just to keep everyone in the loop....