j E82 Traffic Worksheet.pdfAPPENDIX A
Page I of 2
Transportation Impact Analysis
Worksheet
Name of Proposed Project: 120b &A
Owner/Applicant
Name
I
Street/Mailing Address
Am-K2��� 0� o3
City State Zip
Telephone:42-5 -2 2
Applicant Contact Person:
W!E��
Name
Street/Mailing Address
s2t.- O�
City State 1 zip
Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
a. Location - Street address:
b. Specify existing land use:
c. Specify proposed type and size of development:
Contact Name
=11108
(Attach a vicinity map and site plan.)
I
of'residential units and/or square footage of building-)
d. Date construction will begin and be completed:
e. Define proposed access locations: aX)!�-2aW-277 HY)-1 CIQ 2 110
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations:
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04). the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate 4 of dwelling,
vfb. etc.
New Use X
Prior Use X
New Use Fee: S Prior Use Fee: S
NEW DEVELOPMENT
oe\
ITE Land Use Category
Z--
New Use N(B)AJ
,- A --7
Per Unit
Fee Rate
$s -' X
gromARO'l
Units in
square feet.
9 of dwelling,
vfp. etc.
Fee
MITIGATION FEE RECOMMENDATION:
S
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
S
FTOTAL TRANSPORTATION IMPACT FEE
S
City of Edmonds, Engineering Division Approval
Date
No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.