ENGINEERING
RESUB
MEMORANDUM JAN 0 9 2013
UMQ DSARaMEltli
DATE: December 18, 2012
TO: City of Edmonds — Engineering Department (Jeanie McConnell)
BY: Craig Harris, PE,
SUBJECT: Plan and Stormwatere eport Review — December 6, 2012
PROJECT: Walgreens Edmonds — Edmonds, WA
PROJECT NO.: Al1182.11
Below are responses to the review comments from your memo dated December 6, 2012.
General
1. We have updated values on the cost estimate to reflect both sidewalk and saw -cut costs.
Please note that the standard King County Cost estimate is locked for editing. We have
accounted for the 5.5" sidewalk section in the 5.0" sidewalk row in the spreadsheet. The
area that is listed is the area of the 5.5" sidewalk multiplied by 5.5/5. We understand that
bonds will be required and will issue at a later date.
2. N/A. This item has been addressed in our previous response to City Comments.
3. N/A. This item has been addressed in our previous response to City Comments.
4. Please refer to comments on sheet C-101 for additional information.
5. An additional section adjacent to the parking lot section is now included. Please refer to
comments on sheet C-101 for additional information.
6. Parking lot striping, signage, dimensions, and details are shown on sheet C-100 and
sheet C-510. New stop bars and signs are shown at the proposed driveway locations.
7. N/A. This item has been addressed in our previous response to City Comments.
8. General comment taken note of.
Stormwater Drainage Report
1. A CDS unit has been added to the design prior to the infiltration chambers. CDS units
have received "General Use" designation by Washington DEQ.
4875 SW Griffith Drive I Suite 300 1 Beaverton, OR 197005
503.620.3030 1 tel 503.620.5539 1 fax W W W a a i e n g. c o m
N
f:
AAlafghan associates, inc.
ENGINEERING
C-001
1. Additional linework around the existing sidewalk is now shown.
2. Notes 1,7, 8, and 9 have been updated.
3. N/A. This item has been addressed in our previous response to City Comments.
4. N/A. This item has been addressed in our previous response to City Comments.
C-100
1. Addressed above.
C-101
1. Sidewalk ramps have been eliminated.
2. The note calling out "construct curb..." has been updated to "construct cement concrete
traffic curb."
C-120
1. Additional erosion control measures are now shown including the use of wattles.
2. Construction entrance is now shown in plans. A new note has been added to the right
hand of the sheet, which takes into account the need to retain sidewalks and paving until
necessary.
3. N/A. This item has been addressed in our previous response to City Comments.
4. Plans have been updated to show construction entrance at eastern driveway.
C-110 and C-111
1. To be addressed at a later date
2. To be addressed at a later date.
3. To be addressed at a later date.
4. N/A. This item has been addressed in our previous response to City Comments.
5. Sheet number has been updated in plans.
6. Plan callouts have been updated.
7. Plans show rip -rap outline in legend and plan view on sheet C-110. Detail 4, SHEET C-
540 details additional requirements regarding width, depth, and class.
4875 SW Griffith Drive I Suite 300 1 Beaverton, OR 197005
503.620.3030 1 tel 503.620.5539 1 fax w w w. a a i e n g. c o m
AA I
afghan associates, inc.
ENGINEERING
8. N/A. This item has been addressed in our previous response to City Comments.
9. Storm easement has been updated.
10. City comment has been taken note of. In the event that the parcel is subdivided in the
future, easements shall be shown.
11. Ongoing conversations are in progress with the adjacent property owner regarding the
scope of work to be performed on adjacent parcel and associated easements.
12. See revised storm info.
13. The future building and Walgreens are now part of one single plan set. All downspout
notes are shown in plans.
14. Please see the note at the bottom right of the vent pipe detail on sheet C-541.
15. N/A. This item has been addressed in our previous response to City Comments.
16. N/A. This item has been addressed in our previous response to City Comments.
17. Cleanout now shown in plans on sheet C-110. Detail is shown on sheet C-540.
C-510
1. This is a general construction sheet, which is a part of the client's prototypical plan set
and has been approved as shown in multiple jurisdictions throughout the United States.
We have been asked not to alter the detail numbering and sheet name in order to satisfy
Walgreens requirements. If the City of Edmonds will permit, we would like to retain the
sheet name and detail numbering shown.
2. Same as above.
C-511 and C-512
1. The note calling out "construct curb..." has been updated to "construct cement concrete
traffic curb."
2. it is assumed that this comment was in reference to the curb ramps which were
previously shown. These have been omitted from the plans.
C-540
1. This sheet is not standard to Walgreens requirements. We have updated the detail
numbering as requested.
4875 SW Griffith Drive I Suite 300 1 Beaverton, OR 197005
503.620.3030 1 tel 503.620.5539 1 fax w w w. a a i e n g. c o m
ilk
f M afghan associates, inc
—ENGINEERING
Building Division Comments
3. Detail 8 has been updated to reflect 44" requirement.
Fire Marshall Comments
1. The NE corner of the site is capable of providing turning accommodations of 20' inside
radius and 40' outside radius. An exhibit was forwarded to John Westfall, and is attached
to the end of this document.
2. Please see note on the right hand side of sheet C-100, which details the requirements
for fire lane striping.
3. Double check detector location is shown on sheet C-100, to the south of the future bank.
4. Post protection is now provided per detail on sheet C-543.
Please let me know if you have any further questions.