Loading...
JeffPhillips 301 4th N.doc CE ITY OF DMONDS th 121 5 Avenue North • Edmonds, WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.ci.edmonds.wa.us DSD: P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING GI ENERAL NFORMATION Meeting Date: August 9, 2006 Review By: Meg Gruwell, Senior Planner Project Name: Site Address: 301 and 303 – 4 Avenue N. and 315 Edmonds Street th Zone: Multiple Residential (RM-1.5) Applicant/Owner: Jeffrey Phillips Description: Eight condominiums U: SE Use Proposed?: Multiple residential  Allowed Use?: Yes  Conditional Use Permit Required?: No  Other Use Issues?: Number units allowed is 1 unit/1,500 square feet lot area; lot area is 120 x 110 =  13,200 square feet; therefore 13,200 sq. ft. / 1,500 = 8.8 or 8 units maximum DS: EVELOPMENT TANDARDS Street Side Rear Setback Requirements: 15 feet 10 feet NA Setbacks Proposed: Approx. 15 feet to Approx. 10 NA both streets and 25 feet Setback Notes: Corner Lot – no rear setbacks; site plan not exactly to scale? Approximately 1’ = 1/8”  Maximum Height Allowed: 25 feet; roof only may extend five feet above the stated height limit if all  portions of the roof above the stated height limit have a slope of four inches in 12 inches or greater. Height Proposed: Not given  Maximum Lot Coverage Allowed: 45 percent  Lot Coverage Proposed: 4502 s.f. / 13,200 s.f. = 34 percent  Other Restrictions: Retaining walls and planter boxes within the setbacks must be less than three  feet in height above the original grade. P: ARKING In Downtown Business Area? No (not commercially zoned)  Parking Standard Considered Most Appropriate: Multiple residential: 2.0 stalls per 3-bedroom  unit Dimensions of the Project Related to that Standard: 8 x 3-bedroom units  Total Stalls Required: 8 x 2 = 16 stalls  Total Stalls Proposed: 12 stalls  Landscaping Provided Around Perimeter? Parking is currently inside the building. If parking is  proposed outside the building, it will be required to be screened per ECDC 20.12.020.A. Interior Landscaping Required? No  D: ESIGN Architectural Design Board Review Required? Yes  Major or Minor Project? Major (over four units)  Comprehensive Plan Designation: Arts Center Corridor and within the Downtown /Waterfront  Activity Center Guidelines in Comprehensive Plan: The comprehensive plan envisions ground level retail and  commercial along the arts corridor. The area should have pedestrian-scale design features, with art and landscaping within the setbacks. Live/work arrangements are also encouraged. Urban Design Guidelines Designation: Downtown Activity Center – Multi-Family  Site Design – Potential Issues:  (1) Site design should be oriented toward the pedestrian and include features of interest to pedestrians adjacent to the sidewalk. (2) Landscaping must meet the requirements of ECDC 20.12. (3) Building Design – Potential Issues:  (1) The building design has not been shown, so it is hard to comment on it. It appears that the building will have some modulation and include decks and porches. (2) Buildings should be designed to fit into the context of the surrounding area, paying special attention to the scale, form, height and massing of the existing neighborhood. Please see Design Guidelines for further requirements. Screening: Utility vaults, heating and cooling equipment, trash and recycling areas must all be screened. Vegetative screening in addition to any fencing or other walls is encouraged. Transportation Orientation: Pedestrian orientation is key here. Parking is encouraged to be inside the building or at the side or rear, with buildings close to the street. S: IGNS Restrictions: Design regulations encourage low-level signs primarily for building identification. For specific zoning code restrictions, see ECDC 20.60. ER: NVIRONMENTAL EGULATIONS SEPA Review Required? Yes Shoreline Permit Required? No Critical Area Determination: CA-1993-51 for 303 – 4 Ave. N. (waiver) th For 301 – 4 Ave. N. has not been done. Since the lots are being th combined and 301 does not have any critical areas, we will consider the original critical area to cover both lots. Critical Area Study Required? No Subdivision or Lot Combination Required? Yes. Has been approved under PLN20060082 on July 18, 2006. The recorded copy of the lot line adjustment will be needed. Q: UESTIONS 1. Looks like a concrete wall along the western property line holding up the slope cut into for the driveway? Retaining walls in the setbacks cannot be more than three feet over the original grade. 2. What is the area that looks like a parking stall near where the garbage is shown? C: OMMENTS 1. Site plans need to be to scale. 2. Project must meet setbacks. 3. Height of building is limited to 25 feet plus 5 additional feet with a pitched roof, as stated above. 4. Trash and recycling area must be screened (see policy). 5. Parking is not sufficient. Three-bedroom units require 2 parking spaces per unit, for a total of 16 required spaces. Only 12 spaces are provided. Note that parking cannot be provided within the required street setback. Also note that parking is graduated, with a two-bedroom unit only requiring 1.8 spaces per unit, a one-bedroom unit requiring 1.5 spaces per unit, etc. (see ECDC 17.50.020.A.1.b.). 6. The City Council will shortly be considering the proposed new downtown zones. Under the proposed BD5 zone that would apply to this site, if adopted as currently proposed, retail stores and JeffPhillips 301 4th N.doc Page 2 of 3 service uses would be an allowed use. Ground level commercial uses to a depth of 60 feet, or live/work arrangements would be required. Setbacks, height, and other restrictions would also be changing. Please see the proposed zoning code. JeffPhillips 301 4th N.doc Page 3 of 3