JHB cost estimate.pdfJH8 LTD
12414 HWY 99 Unit 6
Everett Wa 98204
jhbconstruction.com
Brute LjMg&xd Job Address / Notes
2V i t1t' Wklz A% e A'
Eikekvsk, WA 4,-'V_6
044 l AV-43
Item
Description
Estimate
Date Estimate !R
9/7/16 7216
i
Rap
GI,
Total
Build additicxt to permitted set of plans 45,885.00
..� door Wfthstwase and bookcase I,.00
`�•�: Badmtxun �.tmvcrskm M plan 14,00000.OQ
NOA
I. bwhides White Frerwh 6xirs
?. Tile Slw%%vr with berwh with Hydro-Blok the base, walls and niche
Tile tkvr in bathroom
4. Hard%v-od tk-or in bedroom - match existing as close as possible in prefinished
5. lkdium gra& vanity, cotulter top sink and faucet
[L Textured finish on drywall with prime and paint finishes
Notes:
1. Pm-wient terms to be worked out before signing
'. A list of finish materials to be provided by customer as soon as possible
J. Paint colors and sheen to be selected by customer
JH8 LTD requires half down. We accept credit cards Subtotal
at a 3% service fee.
Customer Bid
,Acceptance --Sales Tax
Phone 1-866-710-0650 F X 425-438-2648
iEmail : info@jhbconstruction.com Total!
License: IHBLTL*968NQ