JT-250497 SOW REVISION 2.pdf-4
I.T. Room.
I 1
Riser up on builicing, place a S4'
lockbox and tap and continue
5'
with drop to IT room D bN D S
w
�2'15 T iyy
Place a new 17x 30 vault and
continue with new U/G
3'
is
qwrmhs
�.
Bore placing 1, 2" conduit approx.. 65'
'
—
from pole to property line and
continue approx. 69'to proposed
T8�
—
O-� vault location.
13
Tie in Point, E.O.L. Tap on the Pole. _
212 TH S T SW -9J
S
+-
Plant Extension. Riser Down Placing
1, 2" Conduit Approx. 25'.�_��'�'
Will maintain 5'
minimum clearance
qr
U
250497
Green Token Cannabis
7215 212th Street South West
Edmonds
REVISION 1
Prepared By:
Oscar Cordova - (360) 319-2517
TIE IN POINT ON EXISTING POLE LOCATED AT 7215 ON SOUTH SIDE OF 212th ST SW,
Rev
Date
PLANT EXTENSION. RISER DOWN PLACING 1, 2" CONDUIT APPROX. 25', BORE PLACING
Date:
7-Aug-17
1, 2" CONDUIT HEADING NORTH APPROX. 65' CONTINUING ONTO PRIVATE PROPERTY
ENGINEERED FOR:
SMB
69' BACK TO NEW
PROPOSED VAULT LOCATION.
Ccomcast
Casey Brown - (425) 754-0064
CableCom
5
Comcast OPE