Loading...
Kelnero CS 10.15.18.pdfEXIST V-0" PIER BLOCK, AT (3) LOCATIONS N 00 UPGRADE ALL BEAMS ALONG THIS BEAM LINE PER DETAIL 4/S3.1 U 0 io Ln 0 N r-I x N f- N X w 11'-8 3/4" r--T-_ I I � L_ _� + 3 PLCS 1 53.1 I I ■ I I L_ _J I I ■ I I 11'-8 3/4" m rn A � NEW 2'-0" x 2'-0" x 10" 0n- DEEP CONC FTG, W/ (4) F- - 10� #4 EA WAY BOT, TYP (3) PLACES_ I I I I I � L_ _J O in I-- -_1 ■ I I L_ _J N TYP 4 0 S3.1 16-2 1/2" r— —� r---� r---� PT 6x10 HF#2 I I PT 6x10 HF#2 L ._J L___J L___J a UPGRADE THIS o BEAM PER NOTE 00 T nN nFTAII Alrq 1 X �\ "' / 4 \ S I M I ■ I I F- --1 I I ■ I I L_ _J UPGRADE ALL BEAMS ALONG THIS BEAM LINE PER DETAIL 4/S3.1 UPGRADE THIS BEAM PER NOTE ON DETAIL 4/S3.1 4 S I M S3.1 �- - I I ■ I I L_ _J EXIST FTG, TYP I I ■ I I I I I I L_ —J UPGRADE ALL BEAMS 4_ALONG THIS BEAM IF LINE PER DETAIL 4/S3.1 ■ I I L _J 2 f - - - -I \ PT 6x10 HF#2 I I PT 6x10 H _ J PT 6x10 HF#2 I I PT 6x10 HF#2 I I PT 6x10 HF#2 I I I I r— I 14, ___J L___J L_ =J 3 TYP = 53.1 0 jT6=1 T 4x10 HF#2 I I PT 4x10 HF#2 I I PT 4x10 HF#2 I I L___J L___J L___1/2" 6'-111/2" 6'-111/2" x C N _ f- -,C d � PT 6x10 HF#2 I ■ I I I I I L _J L___J 11 1 X r 4x10 H F#2 _ I \11 L__ 6'-111/2" 1 FOUNDATION PLAN NOTES: 1. FOOTINGS SHALL BEAR ON FIRM NATIVE SOIL OR COMPACTED STRUCTURAL FILL AS SPECIFIED IN THE SOILS REPORT. 2. REFER TO SHEET S3.1 FOR FOUNDATION DETAILS. 3. PLACE ALL REINFORCEMENT PER THE STRUCTURAL NOTES AND FOUNDATION DETAILS. REFER TO SHEET S1.1 FOR ADDITIONAL CONCRETE DETAILING REQUIREMENTS. 4. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, WALL LOCATIONS, AND CONCRETE ROUGH OPENINGS WITH ARCHITECTURAL DRAWINGS AND NOTIFY ALL PARTIES OF ANY DISCREPANCIES. TYPICAL FLOOR FRAMING PLAN NOTES: 1. COLUMNS AND BEARING WALLS SHOWN ON PLANS SHALL BE CONTINUED DOWN TO THE FOUNDATION UNLESS CARRIED BY A BEAM BELOW. 2. REFER TO SHEET S3.1 FOR TYPICAL FLOOR FRAMING DETAILS. 3. WALLS AND COLUMNS SHOWN ON THE FRAMING PLANS ARE WALLS BELOW THE FRAMING LEVELS INDICATED. 4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THE PLAN. USE PC OR EPC COLUMN CAPS, TYP PT4x4 KNEE BRACES PER DETAIL 6/S3.1, (10 TOTAL) RAMP 1'-6" x 1'-6" x 0'-8" DEEP CONC FTG W/ (3) #4 EA WAY BOT, TYP (15) PLACES PT 4x4 H F#2 POST, TYP (15) PLACES DOF FRAMING PLAN NOTES: ,HOWN ON ROOF FRAMING PLAN ARE WALLS BELOW ROOF FRAMING. 0 SHEET S3.1 FOR FRAMING DETAILS. \IS SHOWN ON PLAN SHALL BE CONTINUED DOWN TO THE FOUNDATION CARRIED BY A BEAM BELOW. NOTED OTHERWISE, ALL BEAM -TO -BEAM CONNECTIONS SHALL BE )N HU SERIES FACE MOUNT HANGERS W/ MAX NAILING OR SIMPSON B TOP FLANGE HANGERS W/ MAX NAILING. CG Marks; 10.15.18 C3�J ENGINEERING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 W 19/ 18 J Q H H Z O m �N U (n CC LLI Lu Q a Y 0' Q DESIGN: BTJ DRAWN: JEG CHECK: JGG JOB NO: 18083.10 DATE: 03/19/1 8 0 (n N _I p Q Ld 00 Ld Y W U Q O V) U O ? in /1/ Q W O J In W I Y L0 Ld SHEET: N Z Q S201 w zz J al FOUNDATION & MAIN FLOOR FRAMING PLAN SCALE: 1/4" = V-0" ROOF FRAMING PLAN SCALE: 1/4" = V-0" ■ ■