Loading...
Key bank.pdfMEMORANDUM December 28, 2011 TO: Joel Howitt, Barghausen Architects FROM: Steve Fisher, City of Edmonds Public Works, 425-771-0235 RE: Plan review for trash enclosure 2011-1031— Key Bank, 9930 Edmonds Way, Edmonds In reviewing the proposed trash enclosure for this project it is noted that the location, orientation, and materials are acceptable as shown. However, the enclosure's inside dimensions need to be increased somewhat, in order to accept a better container scenario. At present the enclosure detail shows 10' wide inside by 7' deep inside. Please adjust the dimensions to show, at a minimum, 12' wide inside by 10' deep inside. Let me know if you have any questions. Thank you.