KeyBankCostEst-Rev.4.26.12.pdfof t•»M 0 =. City of Edmonds Public Works Department Engineering Division Building Permit #: BLD20111031 121 5th Ave N - Edmonds, WA 98020 Right -of -Way Permit : ENG20120020 425.771.0220 ph 425.672.5750 fax Project Name: Address: Date Prepared: KEY BANK 9930 EDMONDS WAY Prepared By: ROW Improvements/Restoration ` �� J "? _fix 120% CCAJ BOND AMOUNT ROW and ONSITE Improvements x 120%Z"t x 2.2% �} `7C �• ` 7 INSPECTION FEES ENG DIVISION APPROVAL: NOTES: The word "bond" as used in this document means financial guarantee acceptable to the City of Edmonds. Required bond amounts are subject to review. and modication by the City of Edmonds Engineering Division. All work and materials shall be in accordance with current WSDOT Standard Specifications for Municipal Public Works Construction and City of Edmonds standards KeyBank - Edmonds Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Reference;# Unit Price Unit Quantity # of. Applications Cost ;> EROSIONISEDIMENT CONTROL Number Backfill & compaction -embankment ESC-1 $ 5.62 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY Ditching ESC-4 $ 8.08 CY 120 1 970 Excavation -bulk ESC-5 $ 1.50 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 240 1 331 Fence, Temporary (NGPE) ESC-7 $ 1.38 LF Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY Jute Mesh ESC-9 SWDM 5.4.2.2 $ 1.45 SY Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 $ 2.01 SY Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 $ 0.53 SY Piping, temporary, CPP, 6" ESC-12 $ 10.70 LF Piping, temporary, CPP, 8" ESC-13 $ 16.10 LF Piping, temporary, CPP, 12" ESC-14 $ 20.70 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 39.08 CY 2 1 78 Rock Construction Entrance, 50'x15'xl' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each 1 1 1464 Rock Construction Entrance, 100'xl5'xl' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 1,949.38 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 17.91 LF 90 1 1612 Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF 8 1 548 Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 0.51 SY ESC-23 SWDM 5.4.2.5 $ 6.03 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY TESC Supervisor ESC-25 $ 74.75 HR 16 1 1196 Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR 12 1 1173 WRITE -IN=ITEMS*f* (see `page 91 CB Inlet Protection $ 100.00 Each 9 1 900 Page 2 of 9 15020. BO N D. Q.xis ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: RESU�i.- FEB 2 9 2012 OU1LDING DEPAFITMEN-1 CITY OF EDMO..NDF, $ 8,272.52 $ 2,481.76 $ 10,754.28 A Unit prices updated: 02/12/02 Version: 11 /26/2008 Report Date: 2/24/2012 Site Improvement Bond Quantity Worksheet Web date: 12/0212008 Backfill & Compaction- embankment Gl - 1 $ 5.62 CY 78 438,36 Backfill & Compaction- trench GI - 2 $ 8,53 CY Clear/Remove Brush, by hand GI - 3 $ 0.36 SY Clearing/Grubbing/Tree Removal GI - 4 $ 8,876.16 Acre Excavation - bulk GI - 5 $ 1.50 CY 570 855.00 Excavation - Trench GI - 6 $ 4.06 CY 80 324.80 Fencing, cedar, 6' high GI - 7 $ 18.55 LF Fencing, chain link, vinyl coated, 6' high GI - 8 $ 13.44 LF Fencing, chain link, gate, vinyl coated, 20 GI - 9 $ 1,271.81 Each Fencing, split rail, 3' high GI - 10 $ 12.12 LF Fill & compact - common barrow GI - 11 $ 22.57 CY Fill & compact- gravel base GI - 12 $ 25.48 CY Fill & compact - screened topsoil GI - 13 $ 37.85 CY Gabion, 12" deep, stone filled mesh GI - 14 $ 54.31 SY Gabion, 18" deep, stone filled mesh GI - 15 $ 74.85 SY Gabion, 36" deep, stone filled mesh GI - 16 $ 132,48 SY Grading, fine, by hand GI - 17 $ 2.02 SY 350 707.00 400 808.00 Grading, fine, with grader GI - 18 $ 0,95 SY Monuments, T long GI - 19 $ 135.13 Each Sensitive Areas Sign GI - 20 $ 2.88 Each Sodding, 1" deep, sloped ground GI - 21 $ 7.46 SY Surveying, line & grade GI - 22 $ 788.26 Day 0.5 394.13 1.5 1,182.39 Surveying, lot location/lines GI - 23 $ 1,556.64 Acre Traffic control crew ( 2 flaggers) GI - 24 $ 85.18 HR 24 2,044.32 Trail, 4" chipped wood GI - 25 $ 7.59 SY Trail, 4" crushed cinder GI - 26 $ 8.33 SY Trail, 4" top course GI - 27 $ 8.19 SY Wall, retaining, concrete GI - 28 $ 44.16 SF Wall, rockery GI - 29 $ 9.49 1 SF Page 3 of 9 SUBTOTAL 3,145.45 3,608.55 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 15020.BOND.Q.xls Report Date: 2/24/2012 Site Improvement Bond Quantity Worksheet Web date: 12/0212008 AC Grinding, 4' wide machine < 1000sy RI - 1 $ 28.00 SY AC Grinding, 4' wide machine 1000-2000 RI - 2 $ 15.00 SY AC Grinding, 4' wide machine > 2000sy RI - 3 $ 7,00 SY AC Removal/Disposal/Repair RI - 4 $ 67.50 SY 228 15,390.00 Barricade, type I RI - 5 $ 30.03 LF Barricade, type III ( Permanent) RI - 6 $ 45.05 LF Curb & Gutter, rolled RI - 7 $ 17.00 LF Curb & Gutter, vertical RI - 8 $ 12,50 LF 300 3,750.00 Curb and Gutter, demolition and disposal RI - 9 $ 18,00 LF 300 5,400.00 Curb, extruded asphalt R# - 10 $ 5.50 LF Curb, extruded concrete Rl - 11 $ 7.00 LF 637 4,459.00 Sawcut, asphalt, 3" depth Rl - 12 $ 1.85 LF 300 555.00 Sawcut, concrete, per 1" depth RI - 13 $ 1.69 LF Sealant, asphalt RI - 14 $ 1.25 LF Shoulder, AC, ( see AC road unit price RI - 15 $ - SY Shoulder, gravel, 4" thick RI - 16 $ 15.00 SY Sidewalk, 4" thick RI - 17 $ 35.00 SY 80 2,800.00 Sidewalk, 4" thick, demolition and dispose RI - 18 $ 29.50 SY 167 4,926.50 Sidewalk, 5" thick RI - 19 $ 38.50 SY 321 12,358.50 Sidewalk, 5" thick, demolition and dispos RI - 20 $ 37,50 SY Sign, handicap RI - 21 $ 85.28 Each 1 85.28 Striping, per stall RI - 22 $ 5.82 Each 15 87.30 Striping, thermoplastic, for crosswalk ) RI - 23 $ 2.38 SF Striping, 4" reflectorized line RI - 24 $ 0,25 LF Page 4 of 9 SUBTOTAL 42,380.00 7,431.58 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 15020.BOND.Q.xis Report Date: 2/24/2012 Site Improvement Bond Quantity Worksheet Web date: 12/0212008 Page 5 of 9 SUBTOTAL 1,766.40 30,375.10 Unit prices updated: 02/12/02 "KCC 27A authorizes only one bond reduction. Version: 11/26/08 15020.BOND.Q.xls Report Date: 2/24/2012 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right-of-way Future Public Road Improvements & Drainage Facilities Private Improvements Bond Reduction* Quant. Complete Cost Unit Price Unit Quant.T Cost Quant. I Cost Quant. Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe. Access Road, R/D D - 1 $ 21.00 SY Bollards - fixed D - 2 $ 240.74 Each Bollards - removable D - 3 $ 452.34 Each * (CBs include frame and lid CB Type[ D - 4 $ 1,257.64 Each 8 10,061.12 CB Type IL D - 5 $ 1,433.59 Each CB Type II, 48" diameter D - 6 $ 2,033.57 Each for additional depth over 4' D - 7 $ 436.52 FT CB Type II, 54" diameter D - 8 $ 2,192.54 Each for additional depth over 4' D - 9 $ 486.53 FT CB Type II, 60" diameter D - 10 $ 2,351.52 Each for additional depth over 4' D - 11 $ 536.54 FT CB Type II, 72" diameter D - 12 $ 3,212.64 Each for additional depth over 4' D - 13 $ 692.21 FT Through -curb Inlet Framework (Add) D - 14 $ 366.09 Each Cleanout, PVC, 4" D - 15 $ 130.55 Each Cleanout, PVC, 6" D - 16 $ 174.90 Each 4 699.60 Cleanout, PVC, 8" D - 17 $ 224.19 Each Culvert, PVC, 4" D - 18 $ 8.64 LF Culvert, PVC, 6" D - 19 $ 12.60 LF Culvert, PVC, 8" D - 20 $ 13.33 LF Culvert, PVC, 12" D - 21 $ 21.77 LF Culvert, CMP, 8" D - 22 $ 17.25 LF Culvert, CMP, 12" D - 23 $ 26.45 LF Culvert, CMP, 15" D - 24 $ 32.73 LF Culvert, CMP, 18" D - 25 $ 37.74 LF Culvert, CMP, 24" D - 26 $ 53.33 LF Culvert, CMP, 30" D - 27 $ 71.45 LF Culvert, CMP, 36" D - 28 $ 112.11 LF Culvert, CMP, 48" D - 29 $ 140.83 LF Culvert, CMP, 60" D - 30 $ 235.45 LF Culvert, CMP, 72" D - 31 $ 302.58 LF Page 6 of 9 SUBTOTAL iw! 2-10. 1 15,682.119' Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11 /26/08 15020.BOND.Q.xls Report Date: 2/24/2012 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 DRAINAGE CONTINUED Existing Right-of-way Future Public Road Improvements & Drainage Facilities Private Improvements Bond Reduction* Quant . Complete Cost No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Culvert, Concrete, 8" D - 32 $ 21.02 LF Culvert, Concrete, 12" D - 33 $ 30.05 LF Culvert, Concrete, 15" D - 34 $ 37.34 LF Culvert, Concrete, 18" D - 35 $ 44.51 LF Culvert, Concrete, 24" D - 36 $ 61.07 LF Culvert, Concrete, 30" D - 37 $ 104.18 LF Culvert, Concrete, 36" D - 38 $ 137.63 LF Culvert, Concrete, 42" D - 39 $ 158.42 LF Culvert, Concrete, 48" D - 40 $ 175.94 LF Culvert, CPP, 6" D - 41 $ 10.70 LF Culvert, CPP, 8" D - 42 $ 16.10 LF Culvert, CPP, 12" D - 43 $ 20.70 LF Culvert, CPP, 15" D - 44 $ 23.00 LF Culvert, CPP, 18" D - 45 $ 27.60 LF Culvert, CPP, 24" D - 46 $ 36.80 LF Culvert, CPP, 30" D - 47 $ 48.30 LF Culvert, CPP, 36' D - 48 $ 55.20 LF Ditching D - 49 $ 8.08 CY Flow Dispersal Trench 1,436 base+ D - 50 $ 25.99 LF French Drain 3' depth D - 51 $ 22.60 LF Geotextile, laid in trench, polypropylene D - 52 $ 2.40 SY Infiltration pond testing D - 53 $ 74.75 HR Mid -tank Access Riser, 48" dia, 6' deep D - 54 $ 1,605.40 Each Pond Overflow Spillway D - 55 $ 14.01 SY Restrictor/Oil Separator, 12" D - 56 $ 1,045.19 Each Restrictor/Oil Separator, 15" D - 57 $ 1,095.56 Each Restrictor/Oil Separator, 18" D - 58 $ 1,146.16 Each Riprap, placed D - 59 $ 39.08 CY Tank End Reducer 36" diameter D - 60 $ 1,000.50 Each Trash Rack, 12" D - 61 $ 211.97 Each Trash Rack, 15" D - 62 $ 237.27 Each Trash Rack, 18" D - 63 $ 268.89 Each Trash Rack, 21" D - 64 $ 306.84 Each Page 7 of 9 SUBTOTAL Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11 /26/08 15020.BOND.Q.xls Report Date: 2/24/2012 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right-of-way Future Public Road Improvements & Drainage Facilities Private Improvements Bond Reduction* Quant. Complete Cost Unit Price Unit Quant. Price Quant. Cost Quant. Cost PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL - 1 $ 21.00 SY 2" AC, 1.5" top course & 2.5" base cours PL-2 $ 28.00 SY SEE ROAD SURF. 4" select borrow PL - 3 $ 4.55 SY 1.5' top course rock & 2.5' base course PL - 4 $ 11.41 SY UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Statement Utility Pole(s) Relocation UP-1 Lump Sum 1 15000 Street Light Poles w/Luminaires UP-2 Each WRITE -IN -ITEMS (Such as detention/water quality vaults.) No. WI-1 Each Rain Garden Planting WI - 2 $ 3.50 SF 1161 4,063.50 Rain Garden Amended Soils WI - 3 $ 15.00 CY 65 975.00 Uchltr W I - 4 CC, LF WI-5 FT WI-6 WI-7 WI-8 WI-9 WI-10 SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: Page 8 of 9 15,000.00 62,291.85 18,687.56 80,979.41 B C E Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11 /26/08 15020.BOND.Q.xis Report Date: 2/24/2012 Site Improvement Bond Quantity Worksheet Original bond computations prepared by: Name: Date: PE Registration Number: Tel. #: Firm Name: Web date: 12/02/2008 Address: Project No: ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Road Improvements & Drainage Facil Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash. Performance Bond* Amount (A+B+C+D) = TOTAL Reduced Performance Bond* Total *** Maintenance/Defect Bond* Total PERFORMANCE BOND* AMOUNT (A) $ 10,754.3 (B) $ 80,979.4 (C) $ - (D) $ , 9.0 8b)Vgo • 63 (A+B) $ 91,733.7 (T) $ _ 1.72,662T Minimum bond amount is $10UU. I7$, 32+A • 33 BOND*AMOUNT REQUIRED AT RECORDING OR TEMPORARY OCCUPANCY *** PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND* (B+C) x 0.25 = $ 244.9 .5e G Cove,( S►wet -for NAME OF PERSON PREPARING BOND* REDUCTION: tortd &Vt,d 1 ffgQe( (W(S(� `p� �j j"CA�S Date: * NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be $ aG g29...0 (C+D)-E REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES Tx0.30 $ �51,768.8 OR (T-E) $ 17 2.7 Use larger of Tx30 a o - Page 9 of 9 Unit prices updated: 02/12/02 Check out the DDES Web site at www.kinpcounty.pov/permits Version: 11/26/08 15020.BOND.Q.xis Report Date: 2/24/2012