August 13, 2019
Mr. Sean Karr (E-Mail)
NORTH LIGHT CUSTOM BUILDERS LLC
914 164th St SE, Suite B12, No. 542
Mill Creek, WA 98012
RE: CONSTRUCTION TESTING AND INSPECTION
White SFR
23916 102Rd Ave W
Edmonds, Washington
Dear Mr. Karr,
KA No. 096-19300
In accordance with your request and authorization, our firm performed construction testing and inspection
for the above -referenced project. The sampling and testing was performed by our inspectors and reports
are included.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our
office.
Respectfully submitted,
KRAZAN & ASSOCIATES, INC.
Ryman L. Mercer
Project Manager
Pacific Northwest Division
RLM/Ikj
4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6839
With Off ices Serving the Western United States
09619300 DPR.doc
Page 1 of 1
-`Kt
NAffin
mzan&Associate s,Inc.
Geotechnical Engineering . Environmental Engineering
Construction Testing and Inspection
Field
Report NO.:0961930ODFR872019DS
DATE: 8/7/2019 Set Count: CONTRACTOR: North Light
PROJECT #: 09619300 PERMIT #:
PROJECT: White SFR INSPECTOR: Daniel Sleeman
LOCATION: 23916 102"d Ave W JURISDICTION: Edmonds
KA P.M.: WEATHER: Clou& TEMP: 59° F
Krazan & Associates representative arrived on site as requested by contractor for
proprltotaiy ariel-tor lllSpecllon. C,onTractor installing 5/8" all thread rod with epoxy.
Contractor drilled twelve holes, 16" o.c. in the top of the north exterior stem wall.
Twelve 9-3/4" X 5/8" all thread rods were installed in the holes with a minimum embed
of 5".
All holes were drilled using the correct size carbide tipped drill bit in a rotary percussive
hammer drill. Holes were cleaned with the appropriate wire brush and compressed air.
Epoxy used was Simpson Set XP with expiration date 06/07/21. An adequate amount of
epoxy was used to completely encapsulate the embedded portion of bars. Installation
was performed in strict accordance with ICC ESR 2713.
ASTM Test #: -
Asset Number(s):
To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and
regulatory requirements.
ve:
Technician:
Offices Serving the Western United. States
Lynnwood (425) 485-5519 a Poulsbo (360) 598-2126 a Tacoma (253) 939-2500
The inforrnalion provided on this report is prepared for the exclusive use of the client, This report nuy net be reproduced in arty fornrt whhoa the written permission of the client and K—n & Ataoointes. This report
indicates our inspectors observation and testing results based on site conditions and coctramt activities. Titis infumation is sebjm toro4owpdw to ra d submittal. By signing this report, our ie qK" dais not accept
responsibility for validity of results. The same infuvation has bem provided by othm on ahe