Loading...
KRAZAN SPEC INSP..pdf� aAKraZall & ASSOCIATES INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION August 13, 2019 Mr. Sean Karr (E-Mail) NORTH LIGHT CUSTOM BUILDERS LLC 914 164th St SE, Suite B12, No. 542 Mill Creek, WA 98012 RE: CONSTRUCTION TESTING AND INSPECTION White SFR 23916 102Rd Ave W Edmonds, Washington Dear Mr. Karr, KA No. 096-19300 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Ryman L. Mercer Project Manager Pacific Northwest Division RLM/Ikj 4303 1981h Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6839 With Off ices Serving the Western United States 09619300 DPR.doc Page 1 of 1 -`Kt NAffin mzan&Associate s,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.:0961930ODFR872019DS DATE: 8/7/2019 Set Count: CONTRACTOR: North Light PROJECT #: 09619300 PERMIT #: PROJECT: White SFR INSPECTOR: Daniel Sleeman LOCATION: 23916 102"d Ave W JURISDICTION: Edmonds KA P.M.: WEATHER: Clou& TEMP: 59° F Krazan & Associates representative arrived on site as requested by contractor for proprltotaiy ariel-tor lllSpecllon. C,onTractor installing 5/8" all thread rod with epoxy. Contractor drilled twelve holes, 16" o.c. in the top of the north exterior stem wall. Twelve 9-3/4" X 5/8" all thread rods were installed in the holes with a minimum embed of 5". All holes were drilled using the correct size carbide tipped drill bit in a rotary percussive hammer drill. Holes were cleaned with the appropriate wire brush and compressed air. Epoxy used was Simpson Set XP with expiration date 06/07/21. An adequate amount of epoxy was used to completely encapsulate the embedded portion of bars. Installation was performed in strict accordance with ICC ESR 2713. ASTM Test #: - Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. ve: Technician: Offices Serving the Western United. States Lynnwood (425) 485-5519 a Poulsbo (360) 598-2126 a Tacoma (253) 939-2500 The inforrnalion provided on this report is prepared for the exclusive use of the client, This report nuy net be reproduced in arty fornrt whhoa the written permission of the client and K—n & Ataoointes. This report indicates our inspectors observation and testing results based on site conditions and coctramt activities. Titis infumation is sebjm toro4owpdw to ra d submittal. By signing this report, our ie qK" dais not accept responsibility for validity of results. The same infuvation has bem provided by othm on ahe