Loading...
Kruger Pre-App Comments.pdfjK'16yNfu Ur'. C a,kL '• VVCf'MFM 2017. ENGINEERING DEVELOPMENT CHECKLIST ENGINEERING DIVISION PROPERTY NAME Medical Office Building — Kruger Ortho PROJECT ADDRESS 21401 72nd Ave W TYPE OF CONSTRUCTION Medical Office DEVELOPER/APPLICANT Scott Shanks Email: scott(affwdsinc.com +t I PINE-APP DATE 06/09/11, 1:30pm ENGINEERING REPRESENTATIVE Jeanie McConnell / 4oA%%@ &1auf tA The following checklist is a reference to assist in preparing engineering drawings for a more complete building permit application. Additional information or review comments may be precipitated during the review of the application. [®] Complete Civil drawings • City of Edmonds Standard Details and Edmonds Community Development Code (ECDC) are available online at www.ci.edmonds.wa.us • Provide construction sequence and general notes — sample language attached. [®] Drainage report • Drainage system shall be designed in accordance with ECDC 18.30 Storm Water Management and Exhibit "A" Stormwater Supplement. See comments under Storm Drainage below. [Z] Traffic Impact Analysis • Refer to and follow the requirements outlined in the ECDC 18.82 and handout E82. s -f�r RVOI if 04 [®] TOPGRAPHIC DRAWING • Existing and proposed contours (2' or 5' intervals) • Grading plan and quantities of cut and fill. Include quantities for building foundation and provide bottom of footing elevations. [®] STORM DRAINAGE Ste" 0v►MNr-CT --rO 5C4k-M 01VIR- -M-P-J" iN • Chapter 18.30 ECDC Stormwater Management and Exhibit "A" Stormwater Supplement became effective June 1, 2010. The Code and Supplement are available on the City website — www.ci.edmonds.wa.us — choose the City Government drop down; City Departments; Public Works; Engineering Division and then click on Stormwater Management. • The use of Low Impact Development techniques are strongly encouraged. Please consider the use of pervious pavements, rain gardens, etc. with your site development. • If a detention system is constructed: ✓ Include control structure detail S:IENGRIADDRESS_FILESWumedek72_Ave W-214011Reviewslpre20110012-Medical_Office.doc Page 1 of 10 Revised 6/1/10 ✓ Manholes- flat top not concentric ✓ Ladders- polypropylene not galvanized ✓ System profile • Large Site and Small Site projects with over 5000sf impervious area shall be designed by a licensed engineer. • Impervious surface calculation chart shall be provided on the drainage plan. A copy of this chart can be found within City handout E72. . , • Structural drawings and calculations for concrete vaults (Will be sent ouvor,p r review. Cost' shall be pass through) YV , �'' :.1 • Footing drains, if required per the Building Code or by the Geo-Tech shall conneet,ty outf?t����,�� detention system. • Catch basins located in underground parking shall have oil water separator and shall connect to the building sewer line. • Provide RIM and invert elevations for all existing and proposed storm structures. • Storm Development Charge — calculation is based upon impervious surface area. • Jerry Shuster is the City's Stormwater Engineer Program Manager. Jerry can be reached by e-mail at shuster(a),ci.edmonds.wa.us or by phone at 425.771.0220 x1323. [Q SITE ACCESS ® Existing • Driveway Approach - .Access Width ✓ 30' standard width for commercial ✓ 24' minimum for 2-way traffic ® Driveway/Access Slope ✓ 14% max slope, waiver up to 20% per ECDC ✓ 6% landing area for the first 20'. [®] FRONTAGE IMPROVEMENTS ® Existing • Remove and replace existing sidewalk, curb & gutter currently failing or damaged during the course of construction and as required by City inspector or as needed to accommodate new driveway approach. Please note that the existing curb and gutter on 72" d Ave W (to the north side of their existing driveway approach) is not sloped to allow for storm water runoff to flow to the City storm system. This will need to be addressed with redevelopment of the subject property. Replaced sections shall be constructed per City standards. • Remove and replace curb ramps along frontage of property to bring into ADA compliance. Truncated domes are required at all street intersections and may be required at driveway approaches, as determined by City Traffic Engineer. • Bus stop to remain open during construction. Any temporary relocation that may be required during the construction of frontage improvements will need to be coordinated directly with Community Transit. S:IENGRIADDRESS_FILESWumedc172 Ave_W-214011Reviewslpre20110012-Medical_Office.doc Page 2 of 10 Revised 611/10 v� ® Curb and Gutter ® Standard J Major arterial: 24" All other roads:. 18" ® Commercial driveway entrance with radii ® Landscape bulb -outs on 72" d Ave W: Location and size of bulb -outs to be coordinated with City traffic engineer. ® Sidewalks • RM, B, C : 7-10' wide I. • Thickness of sidewalks shall be 5-1/2". Thickness at drive w approach shall be 6'`'°:" • Specify type of curb ramps to be used and reference City of Edmonds standard details. Include standard detail with plan set. • Truncated domes are required on all curb ramps at intersections. [NJ PARKING LOTS/PARKING GARAGES/OPEN PARKING AREAS • Site distance triangle requirements ✓ Buildings; provide a site window or clear area to insure line -of -sight. ✓ Landscaping near entrances shall be restricted to 3' in mature height to ensure adequate sight distance. ✓ Curb to be painted yellow for a minimum distance of 5' on both sides of the driveway. ® Covered Parking — Parking garage ✓ Oil/water separator - connect to sanitary sewer. Storm water runoff not to tie into sewer. ✓ Drive aisles for 2-way traffic shall be 24 feet wide. ✓ Drive aisles for 1-way traffic shall be a minimum of 12 feet wide. ✓ Please refer to Fig 18.1, found in Title 18 of the ECDC for additional parking lot layout r requirements specific to angled parking.; :: ..::;rh ✓ Must be able to show/demonstrate all required full size (8.5' x 16.5') pair -Ong can be obtained within the aggregate parking area. If this can be demonstrated the ECDC will allow for up to 50% of the stalls to be reduced width (8' x 16.5'). ✓ Parking layout between columns can be measured from the center to center of the column but the inside dimension (face to face of column) shall at no time be less than 8' wide. ✓ Changes in column location/size will require a new parking plan layout and approval prior to issuance of the building permit to insure all required fW1 width stalls can be met. ✓ Driveway slope shall be a maximum of 6% for the first 20' and 14% thereafter. ✓ Review structural and mechanical plans to insure columns and mechanical structures do not impact parking numbers and size. ✓ Show sliding gates on civil and architectural plans. Gates shall not impact parking stall widths ✓ Sight windows or other structural clearances at the parking entrance shall be provided to insure proper sight distance clearances [®J ELECTRICAL POWER SOURCE • Show location of pad mounted transformer, to be located on private property. • Underground Wiring Requirements S:IENGRIADDRESS_FILESINumerLi72 Ave_W-214011Reviewslpre20110012-Medicai_Office.doc Page of 10 Revised 6/1/10 [®] RETAINING WALLS/MUOULAR BLOCK WALLS • Follow Handout B-62 • Provide drawings and calculations (If sent out for peer review, cost shall be pass through). [®] WATER SERVICE ® City of Edmonds Customer • Water Connection Fee will be required for new services. • Cross Connection Control, City contact: Linda McMurphy — 425.771.0235 Domestic -IS°X>fi l - ✓ Lines >2 require ai(JRPBA and hot r ✓ Domestic lines shall not be use'dTb "both domestic and fire sprinkler protection unless ` r s """ " .r $� f approved by the Fire Department, Public Works and Engineering. ✓ Backside of water meter to be located at property line. • Irrigation ✓ Show separate irrigation meter. ✓ Show location of backflow assembly on private property innnediately after the meter. ✓ Irrigation Sprinkler Permit to be obtained from Public Works. Contact Linda McMurphy at 425-771-0235. • Fire Protection — When Required by Building Division and Fire Department. Separate Fire Connection permit required; to be submitted with Building Permit application and/or civils. ® Commercial — lines 4" or larger Double check detector valve assembly (DCDA) required per City standards. ✓ Assembly shall not be placed in City right-of-way but shall be installed on private property within 10' of the property line. See Edmonds Standard Detail E7.20 ✓ For properties with zero lot line, assembly shall be placed interior wall immediately adjacent to the property line and on the side where the water main is located. TRPL Remote reader shall be placed on the exterior wall in this situation. See Standard Detail E7.19 ✓ Inside installation of DCDA shall not impede any parking. ✓ Outside installation shall be in a vault per City Standards. • Vault ✓ Lid shall berated H-30 in paved areas and H-10 in landscaped areas. ✓ Lid shall be L.W. Hatch type D with built in storm gutter and drain. ✓ Refer to City standard details E7.8 and E7.8.1 • Post'Indicator Valve (P.I.V.) and Fire Department Connection (F.D.C) ✓ Shall be placed on private property. ✓ If at all possible they shall be free standing. ✓ Minimum clearances shall be 3' radius. ✓ F.D.0 shall be 4" diameter, have a 22.5* bend at the end with a 4"storz adapter. • Fire Line connection requires installation of valve cluster for service connections to City system, per Edmonds Standard Details E7.18, E7.19 and E7.20. • Fire Hydrant ✓ Hydrant will be required if maximum spacing between hydrants exceeds 150' radius or furthest structure is >150' from existing hydrant. S:IENGRUIDQRESS_FILESINumedc172 Ave_W-21401IReviewslpre20110012-WdicaLOfiice.doe Page of 10 Revised 611110 [®] SANITARY SEWER y9 P 7� —rVi,{y'�'y J,{ �t'/y� ( Tr ® City of Edmonds Customer / • Cleanouts: required at property line, at edge of easement and at the end of the run. Locking CI lamphole covers shall be installed at property line and when located in hard surfaces. Cleanouts shall be placed a maximum of 100' apart when the lateral length exceeds 100 feet. • Existing sewer lateral, if any, shall be TV'd by City Public Works Department to determine acceptability for reuse. If lateral is not found to be acceptable it will be the owner's responsibility to install a new lateral from the City sewer main to the property line. [®] RECYCLE/TRASH ENCLOSURE • City Contact: Recycling Coordinator Steve Fisher 425,771.0235 • Refer to Handout E-37. • Gate shall be full swing, concrete pad required. • Enclosure to be accessible by garbage hauler. • NO UTILITIES (I.E. GAS METERS, POWER, ETC) SHALL BE PLACED WITHIN THE 1 DQ14107 ilM, [®] EROSION CONTROL • Erosion and discharge of sediments and other pollutants into receiving waters during construction shall be prevented. • Developer is responsible for implementation and maintenance of erosion control measures. • ESC standard details shall be placed on drawing. [®] STAGING/LAYDOWN AREA • Show location of job site fencing, job trailer, materials storage, etc. [®] TRAFFIC CONTROL PLAN and HAUL ROUTE PLAN [®] DISRUPTION FEES: • Disruption fees will be assessed when any activity occupies or closes parking spaces/lanes or other paved areas, sidewalks, or alley for more than 72 hours. ✓ Sidewalk x ✓ Parking spaces i ✓ Alley [®] RIGHT-OF-WAY CONSTRUCTION PERMIT • A right-of-way construction permit is required for all work within the City right-of-way. • Street disruption fees may apply if street has been overlaid within the last 5 years. • Contractor is required to have an active state contractors license as well as City business license. [®] COST ESTIMATE, BONDING and 2.2% Inspection Fee; ® Provide an itemized estimate for both on -site and off -site (right-of-way) improvements, including traffic control. The amount of the bond will be based on 120% of the City approved estimate for the off -site improvements. ® The 2.2% inspection fee is based on 120% of the City approved estimate for the entire project improvements. S:IENGRWDDRESS_FILESINumedc172}Ave_W-21401AReviewslpre20110012-Medical_Office.doc Page 5 of 10 Revised 611110 OTHER M Easements — provide as required NOTES: Storm, Water and Sewer maps are provided as a graphical representation of existing utilities. Actual utility locations are to be verified by the owner/applicant. ........... . ...... ....... S:IENGR%DDRESS_FILES\Numeric\72_Ave—W-214011Reviewslpre2011OOl2-Medical—Office.doc Page 6 of 10 Revised 6/1 /10 GENERAL NOTES 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC) - 2010 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE. AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT S:IENGRIADDRESS_FILES1Numericl72 Ave—W-214011Reviewslpre20910012-Medical_Otrice.doc Page 7 of 10 Revised 6/1l10 (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FELL PER GEOTECHNICAL REPORT. 14. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 15. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 16. ALL REQUIRED STORMWATER FACILLITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 19. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 22. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 24. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST S:IENGRWDDRESS_FILESWumeric172 Ave_W-214011Reviewslpre20110012-Medical_Office.doc Page 8 of 10 Revised 611110 LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 26. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 27. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNERS REPRESENTATIVE PRIOR TO BACKFILLING. 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 31. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. 32. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 33. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. SAENGRIADDRESS_FILES1Numeric172—Ave_W-214011Reviewslpre20110012-Medical_Office.doc Page of 10 Revised 6l1110 CONSTRUCTION SEQUENCE NOTES 1. SCHEDULE A PRE-CONSTRUCITON MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. 2. REVIEW ESC NOTES. 3. CALL FOR UTILITY LOCATES. 4. INSTALL ESC MEASURES AND MAINTAIN DUST CONTROL. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. (ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED.) 6. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 7. DEMOLISH EXISTING STRUCTURES 8. CLEAR, GRUB & ROUGH GRADE REMAINDER OF SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW) 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS. 13. STABILIZE AND REVEGETATE ENTIRE SITE. 14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. EROSION CONTROL FEATURES CAN BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. SAENGRIADDRESS_FILESINumeric172_Ave_W-214011Reviewslpre20110012-Medical_Office.doc Page lQ of 10 Revised 6/1110 PSi 12 0 0 614-34 PD14-10 E3 PSI QUIDIC N PS 0 ALLIED ROOFING N ® �SI Vp1'4-9 7100 _ 14-7L 13 7200 aF`c & RIDE 14-8A SXT 19 SEC 2 73D9 STE ENS � MANOR ,w m I Aft A �- �1407 21507 ui '1511 Q 521 I T E V N S COURT 527 1 PSI AEGIS 21401 PD14-13 WRIVATE 31 '21431 21 B� c 21410 �I �1401 214tY' 21420 MCDONA D'S 21508 --�l 21558 PD14-1 14 VALUE YNNWOOD -279 NNWOOD 52 PSI V I L LAG 14— — ---j 4-3 B 14-4 � / LTIQ� WON ..,e`• F�