Loading...
Landau Supplemental Peer Review 9-20-10.pdf Geotechnical Peer Review of Submittal Package for Earth Subsidence and Landslide Hazard Area, Plan Review Comments, letter prepared by Reed & Associates, PS, dated July 12, 2010. Gold Residence (South), Response to Planning Division plan review comment letter dated th June 8, 2010, for property located at 16200 75 Place West, Edmonds, Plan check # BLD 20100339, letter prepared by Reed & Associates, PS, dated August 26, 2010. th Gold SFR, 16200 75 Place, Edmonds, Washington, Plan Review Comments, letter prepared by Reed & Associates, PS, dated July 7, 2010. City of Edmonds Record of Lot Line Adjustment, dated July 29, 2010. Gold Residence South Lot Revegetation Plan (Sheets L-1 through L-4), plans prepared by The Jay Group, dated May 25, 2010. Our review of the resubmitted permit package indicates that most of our previous review comments have been addressed. The letter from Nelson Geotechnical Associates (NGA) dated August 25, 2010 has provided further discussion of the potential risk posed by a large-scale, deep-seated landslide on the property. Landscape plans have been submitted that address the previous recommendations provided by NGA dated February 12, 2010 and our June 18, 2010 review comments. Revised lateral earth pressures to address sloping backfill behind retaining walls have been provided. The structural engineer has updated the retaining wall design to reflect the planned 3H:1V backslope and used active lateral earth pressures consistent with the geotechnical engineer’s revised lateral earth pressures for sloping backfill. It appears that the footing detail callout for the garage The footing schedule has been updated. foundations and basement retaining wall should be 2/S-2 instead of 2/S-5, and 3/S-2 instead of 3/S-5. Please review the callouts for footing details and revise as appropriate. Needed revisions or clarifications regarding the Environmental Checklist were noted in Landau Associates’ June 18, 2010 review comments. The resubmitted permit review package that we received did not contain the revised Environmental Checklist. However, our previous review comments were addressed in the resubmitted permit review package for the Gold North residence to reflect the site slopes and landslide hazard conditions that pertain to both of the adjacent properties. The civil plans have not incorporated the requirement for involvement of the geotechnical engineer in the pre-construction meeting and monitoring requirements of the temporary erosion and sediment control (TESC) measures as recommended in our June 18, 2010 review comments. Our previous review comment is repeated below: “Inspection, maintenance, and regular reporting of TESC measures by the Geotechnical Engineer of Record are required \[see the City ESLHA Temporary Erosion and Sediment Control (TESC) Requirements\]. The pre-construction meeting needs to include the Geotechnical Engineer of LA ANDAUSSOCIATES 9/20/10 P:\\074\\165\\FileRoom\\R\\FinalSupplementalPeerReview_tm 9-20-10.doc 2 Record (see City ESLHA TESC Requirements).” We recommend that the notes be revised accordingly. The connection of the retaining wall drains to the site storm drainage system has been clarified. * * * * * * This technical memorandum has been prepared for use by the City of Edmonds in evaluating the adequacy of permit submittal documents related to the proposed Gold (South) single-family residence at th 16200 75 Place West. The focus of this review was the geotechnical aspects of the application. The purpose of the review was to assess the adequacy of the application documents for compliance with City requirements contained in ECDC 23.80 and ECDC 19.10 and conformance with conventionally accepted geotechnical engineering practices. This geotechnical peer review by Landau Associates does not lessen the requirements for the applicant’s geotechnical consultant and other design professionals to prepare an appropriate design for the site conditions. We appreciate this opportunity to be of service to the City. Please contact us if you have any questions or if we may be of further service. DRS/CBT/ccy LA ANDAUSSOCIATES 9/20/10 P:\\074\\165\\FileRoom\\R\\FinalSupplementalPeerReview_tm 9-20-10.doc 3