Loading...
Landscape Bid.pdfi S„) re Ca Sod c zi t.'r � it n 9 I t) r:, . Mukilteo, WA 98275 P.O. Box 1406 425-737-8425 josh@greenslatelandscaping.com Estimate Date Estimate # 8/13/2015 2950 Item Description Qty Rate Total LANDSCAPE INSTALLATION: DOESN'T INCLUDE PREP WORK. THAT IS TIME AND MATERIALS. Total square footage an approbmate 1,950 Square feet topsoil Wintermix Topsoil 4” depth. 25 29.95 748.75T Mulch Other Mulch 2" depth. 12 29.95 359.40T Plants Plants as called out. 1 6,185.85 6,185.85T Stakes Tree stakes 9 8.00 72.00T EQUIPMENT U... equipment usage of a tiller 1 175.00 175.00T 1600 SOFTSCA... Labor for install 2.5 1,350.00 3,375.00T 10,916.00 IRRIGATION INSTALL: IRRIGATION M... Sprinkler parts for 2 zones. (Doesn't include 2 550.00 1,100.00T sleeving) EQUIPMENT U... equipment usage 1 150.00 150.00T 1300 IRRIGATI... Irrigation labor. 2 900.00 1,800.00T 3,050.00 Sales Tax 9.50% 1,326.77 Total $15,292.77 www.greenslatelandscaping.com