Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
LANDSCAPE BOND WORKSHEET.pdf
Project Name Permitting Project #: Address: Prepared By: Sod Lawn Areas Hyduaeed\ng Irrigation System Soil Preparation Topsoil (6"deep) Mulch (2"deep) Peat Moss (2"deep) Compost (I'deep &tilling) Fertilizer Jenna Lane CY #2014-0739,-0730&-0731 $3.00 8S08,8S12&851424UthStreet SW $0.00 D.R.Strong Consulting Engineers SY (435)827-3O63 $13.00 Unit PriceUnit Quanity Price $3.33 CY $25.00 MSF (1O0OSF) 50.00 $400.00 Each S $2,000.00 $12.50 CY $0.00 $3.00 5Y $0.00 $1.15 SY $0.00 $13.00 SY $0.00 $3.33 CY $0.00 Plant Material Deciduous Trees 50.00 1.7S-2.00"Caliper (min.height 1O') $125.00 Cost &Labor 5 $750.00 1.5-1.75" Caliper $112.50 Cost &Labor 4 $450.00 Evergreen Trees ���������� i���������� PANT