Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
LEED Cert Compliance.pdf
L PJ i 1- 0 1 t'i NiA Ei:.1 sY f June 26, 2019 To: City of Edmonds Re: The Village at Westgate LEED Certification The Village at Westgate is pursuing LEED Silver certification. Henbart has contracted with Unico Sustainability (Unico), a division of Unico Properties, to manage the green building certification process for this project with the goal of achieving LEED Silver, This letter and LEED scorecard summarizes the anticipated LEED points the project will likely achieve, and outlines the certification timeline. Based on careful review and analysis of the project's location, design, and construction activities, Unico anticipates the project will achieve at least 50 points and a Silver rating. As part of the LEED application, Unico will submit 55 points for review, with the understanding that some points may not be achieved per the review from Green Business Certification Inc. (GBCI), the organization that performs third -party technical review and verification of LEED-registered projects. A summary of the points that will likely be submitted in each LEED credit category is as follows: - Location & Transportation 6 points - Sustainable Sites 7 points Water Efficiency 7 points Energy & Atmosphere 13 points Materials & Resources 4 points Indoor Environmental Quality 10 points Innovation in Design 6 points Regional Priority 2 points The anticipated LEED certification timeline for The Village at Westgate is as follows: LEED Project Registration — Complete January 29, 2018 LEED Design & Construction Preliminary Submission to GBCI September 6, 2019 LEED Design & Construction Final Submission to GBCI December 20, 2019 Final LEED Certification February 14, 2020 Please feel free to contact us if there are any questions on the project's LEED certification goals or timeline. Sincerely, Anita Jeerage Manager, Sustainable Development Unico Sustainability 1215 Fourth Ave, Ste 600 Seattle, WA 98161 www.unicoprop,com N LEED v4 for BD+C: New Construction C Westgate Village Yes ? No 1 Intavative Process - Points PossICN: 1 Credit 1 LEED for Credit Sensitive Cre3 High Pria dit Credtt4 Surroundi Credit 5 Access to Credit 6 Bicycle Fi Credit 7 Reduced Credits Green Ve 1 1 1 2 916 1 2 5 1 1 1 5 UMM 2 3 SWW Credit 3 0-- nMM --© ©-- n-- 7 �-- 0 4 ©-0 13 0 20 eighborhood Development Location -and Protection ty Site ig Density and Diverse Uses duality Transit cilities larking Footprint ides Construction Activity Pollution Prevention Site Assessment Site Development --Protect or Restore Habitat Open Space Rainwater Management Heat Island Reduction Light Pollution Reduction 16 1 2 5 5 1 1 1 Required 1 2 1 3 2 1 Yes ? No Prereq 1 Storage and Collection of Recyclables Required �Prereq 2 Construction and Demolition Waste Management Planning Required 6 -Credit 1 Building Life -Cycle Impact Reduction 5 1 , Credit 2 Building Product Disclosure and Optimization - Environmental Product Declarations 2 2 Credit 3 Building Product Disclosure and Optimization - Sourcing of Raw Materials 2 1 Credit 4 Building Product Disclosure and Optimization - Material Ingredients 2 lCredlt 5 Construction and Demolition Waste Management 2 y Prereq 1 Minimum Indoc Prereq 2 Environmental Credit 1 Enhanced lnda Credit 2 Low -Emitting h Credit 3 Construction In Credit 4 Indoor Air Qual Credit 5 Thermal Comfc Credit 6 Interior Lightin Credit 7 Daylight Credit 8 Quality Views Credit 9 Acoustic Perfor Y 2 3 1 2 1 2 1 2 1 1 Air Quality Performance tobacco Smoke Control r Air Quality Strategies aterials ioor Air Quality Management Plan ty Assessment •t nance Required Required 2 3 1 2 1 2 3 1 1 rereq 1 Outdoor Water Use Reduction Required 1.1 Innovation: WELL Feature§'ereq 2 Indoor Water Use Reduction Required 717Credit it 1.2 Exemplary Performance: Low -Emitting Materials4ereq 3 Building -Level Water Metering Requiredit 1.3 Pilot Credit: Social Equity within the Commun ty:rellt 1 Outdoor Water Use Reduction 2 it 1.4 Innovation: O+M Starter Kit 1 :relit 2 Indoor Water Use Reduction 6 1 Credit 1.5 Innovation: Green Building Education 1 :relit 3 Cooling Tower Water Use 2 1 Credit 2 LEED Accredited Professional 1 :relit 4 Water Metering 1 r •7 1 Credit 1.1 Regional Priority - Demand Response - 1 point srereq 1 Fundamental Commissioning and Verification Required 1 Credit 1.2 Regional Priority - Renewable Energy Production - 2 points srereq 2 Minimum Energy Performance Required 1 Credit 1.3 Regional Priority BPDO EPD - 1 point >rereq 3 Building-Levei Energy Metering Required 1 Credit 1.4 Regional Priority BPDO Sourcing of Raw Materials - 1 point srereq 4 Fundamental Refrigerant Management Required 1 Credit 1.4 Regional Priority - Rainwater Management - 3 points :redit 1 Enhanced Commissioning 6 1 1 1 1 Credit 1.4 Regional Priority Indoor Water Use Reduction - 4 points :relit 2 Optimize Energy Performance 18 :redit 3 Advanced Energy Metering 1 50 5 74 Total Project- — - Points Possible: :relit 4 Demand Response 2 Projected Level:atr Silver :relit 5 Renewable Energy Production 3 Certified: 40-49; Silver: 50-59; Gold: 60-79; Platinum: 80, :relit 6 Enhanced Refrigerant Management 1 :redit 7 Green Power and Carbon Offsets 2 6/26/2019