Loading...
Letter for footings (2).pdfROD NOVION Architect AIA 8634B 3RD AVENUE NW. Seattle, Wa. 98117 Ph 206.361.6133 Fx 206.361.6345 Rod@NovionGroup.com 9.25.2019 RE: 919 Pine Street. BLD20180284 FOUNDATION DRAINAGE. The owner/ contractor elected not to install foundation drains on the project. The building plans have generic call outs and details for footing drains. The deletion of the foundation drain is acceptable for the following reasons: 1. The omission of the footing drains is acceptable due to the soils found on site being a well -draining sandy soils. This is allowed in the IRC R405.1 Exception. 2. All backfill along the perimeter of the foundation and under slab is a highly compactable and pervious sand material. 3. The finished grade along the perimeter of the structure/ foundation is below the finish slab elevation. Rod Novion Architect RECEIVED OCT 0 2 2019 DEVELOPMENT SERVICES COUNTER