Loading...
Letter from Geotech.pdfEaField Earth S0111tionS NW1.LC Rep. Ray C. Solution 1805 136`h PI NE Bellevue, WA 98005 Time On Site Suite FAX (425) 449-4711 44 (425) 9 4 12:30 (866) 366-8710 TOLL FREE:: DAILY FIELD REPORT Travel Time .75 Project Name Paradise Lane Job Location 505 Paradise Lane, Edmonds General Contractor General Contractor's Superintendent Todd Echelbarger Grading Contractor Grading Foreman Precision Siteworks Adam Are Approved Plans/Permits Onsite ❑ YES ❑ NO Project No. Driveway / Stair Landscape Walls Project No 4424.01 Page of 1 1 Date Report No. ( 3 Day of Week _ Time Off Site 12:15 11 /16, Thur. Hrs. Charged 1.0 Client / Owner Echelbarger Investments Received Onsite By Checked By Permit No. DCI As requested, Earth Solutions NW, LLC (ESNW) was onsite to observe the completed landscape walls along the site frontage and stair / pathway access to the building site. The tiered wall configuration consists of two separate 4-foot modular block walls. The walls provide a terraced landscape area and facilitate the pathway access to the house. A curb and driveway access are located above the walls. Based on our observations, the wall construction is acceptable from a geotechnical standpoint. With respect to the wall configuration and limited height, surcharge from the adjacent curb and driveway access are not expected to influence wall stability. C Ray Coglas, P.E. \ ` 206 793-7494 COPY TO: CONTINUED ON NEXT PAGE f