Little Incomplete Application .pdf,nc. 1,69
December 8, 2011.
Susan Little
2309 NE 127"' St.
Seattle, WA 98125
CITY OF EDMONDS
1215 1h Avenue North, Edmonds WA 98020
Phone: 425.771.0220 ® Fax: 425.771.0221 ® Web: a w.w d!!� o.ndswa: clu
DEVELOPMENT SERVICES DEPARTMENT ® PLANNING DIVISION
Subject: 806 Dayton Street Stream Day Lighting
Incomplete Application
Dear Ms. Little:
The City of Edmonds has received materials associated with the day lighting of the stream on your
property located at 806 Dayton Street in Edmonds; however, more information and materials are required
for a complete application. Please respond to the following items so that we may continue our review.
1. SEPA: The SEPA checklist is not completely filled out and is lacking a signature. Additionally,
the SEPA review fee of $485 nor the $15 City surcharge has not been paid. Please complete the
SEPA checklist, have whoever has filled out the checklist sign it, and submit the $485 SEPA
review fee and $15 City surcharge. The partially completed SEPA checklist is enclosed.
2. Adjacent Property Owners List: The Adjacent Properties Owners (APO) list is not in a format we
can use and the notarized declaration for the APO list was not submitted. See the enclosed
handout #P2 for instructions on how to compile an APO list and declaration form. Please submit
an APO list in the form described in the attached handout #P2 and include the notarized
declaration form.
Critical Area Report: I have reviewed the Critical Areas Report for the stream day lighting. The
report indicates only the north side of the newly exposed stream will be planted and does not
show any existing vegetation on the south side of the stream. Please revise the Critical Areas
Report to 1) show the existing vegetation on the south side of the stream and/or 2) provide a
planting plan for the south side of the stream (plantings may be needed to supplement existing
vegetation).
Stormwater Permit: The project will also require stormwater management permit. The
application for the stormwater management is the same as the City's right-of-way permit which is
enclosed with this letter. The stormwater management permit will be used to review and inspect
the temporary erosion and sediment control measures, any modifications to the connection to the
city storm, etc. The fee for the stormwater management permit is $260, which includes one
engineering inspection. It is $60 per additional engineering inspections (if needed). Please
submit for the stormwater management permit and include the $260 permit fee. Please note that a
detail for any modifications to the existing storm structure will be required. Please also show
where the storm line connects to the city system.
Once the above items have been submitted, we will continue our review and may have additional
comments.
If you have any questions regarding the stormwater management permit, please contact Jennifer Lambert
at 425-771-0220, ext 1321. For questions regarding the critical area requirements or SEPA review,
please contact Kernen Lien at 425-771-0220, ext 1223.
Sincerely,
Len,x
Lien
Associate Planner
Cc: Jennifer Lambert, Engineering Technician
Ginger Holser, WDFW
Chi -is Wright, RAEDEKE ASSOCIATES, INC.
Encl: SEPA Checklist
Handout #P2 — How to Compile an Adjacent Property Owners List
Handout #E11 — Construction Contractors Best Management Practices (BMPs)
Stormwater Construction Permit Application