Loading...
Liu Geotech Report 11.27.13.pdf), 11 A. j 4 .._;j Edmonds Permit No. BLD20130190 0 0. ie ep. age epa o. LIU ASSOC" 1 TES, INC. 12-083 J. Liu 1 of 1 5 Geotechnical Fngmeenrz Enanrecnng Geoiogy & EwLh Science Miles Time On Site Date Day of Week ..... ..... .._ ..... 32 10:30A 11/27/2013 Wed. 19213 Kentake Place NE Travel Time (Hrs) Time Off Site Weather Kenmore, Washington 98028 0,75 11:05A Sunny Phone: (425) 483-9134 Fax: (425) 486-2746 vehicle Hrs on Site Hrs Charged Visitors 1.25 roles o ocatlon lent Chan Residence 17134 Talbot Road, Edmonds Jackie Chang General Contractor General Contractor Proj. Manager Received unchecked By Aziz Aziz Earthwork Contractor Earthwork Contractor Supt. Received Checked By Bedrock Grouo. Inc. Ms. JoAnne Zulauf with city of Edmonds, emailed me three pictures showing erosion damage to the gravel-sur€aced driveway on the property at 17160 Talbot Road, which is the property joining the south side of the subject project site ._.......... (WEST being the bluff side). The first picture shows a silt fence separating the subject property from the neighbor's driveway had been run over and was partially covered by dirt with tire prints crossing from the subject site to the .......... - — neighbor's driveway. A second picture shows shallow erosion grooves in the neighbor's driveway carved out by storm runoff with sediment washed towards a paved parking area at the end of the neighbor's driveway in front of the _ _._ . . neighbors house. These two pictures show the erosion problem likely caused by soil loosened by construction traffic ... - - - of the subject project and moved by storm runoff, and this erosion problem is likely to repeat if it is not corrected. The third picture shows sediment deposited at the base of the bluff. However, a silt fence is installed along the - west (downhill) side of the project site, just behind the top of the bluff, with the bottom of the filter fabric of the silt fence embedded and anchored in a backfilled trench. Therefore, it is unlikely for sediment to be transported through the silt fence. Also, there are no signs in the backyard of the project site or of the neighbor's property to show signs of erosion or storm runoff flowing over the top of the bluff. Therefore, the sediment at the base of the bluff most likely was not washed down from the top. To correct the neigh erosion problem, I recommend that loose sediment and disturbed soil on neighbor's - . ... --— - driveway be removed first. The exposed soil within the driveway should then be compacted to a non -yielding state with a vibratory mechanical compactor. The ground should then be lined with a layer of non -woven filter fabric, such .------ ....... __..... ----- as Mirafl 140NS or equal. The liner should then be covered with a minimum 4 -inch layer of 2 -inch crushed rock compacted to a non -yielding state. The storm Inlet at the end of the existing joint -use paved driveway should be covered with a filter sock to keep sediment from entering the storm sewer. This filter sock should be cleaned periodically to make sure it Is not clogged .... - - - -- uring construction and should be removed after completion of construction The drain Imes connecting to and from this inlet should be checked out with a TV camera for any cracks and leakage to make sure t t -d Qsited at the base of the bluff was not caused by water leaking out of the drain lines.a<",, 1) Jackie Chang 3) Aziz d, Y ....... ........... _._...... I.— ___ FNZ Continued 2) City of Edmonds on Next Edmonds Permit No. BLD20130190 o a. ie ep. age epo o. LIU & .ASSOC:IATES, INC. 12-083 J. Liu 1 of 1 4 Gcotechnica[ Engineering, Engineering Geology & i-artii Science Miles Time On Site Date Day of Week 32 10:30A 11/2612013 Tues. 19213 Kenlake Place NE Travel Time (Firs) Time off site Weather Kenmore, Washington 98028 0.75 11-.05A Sunny Phone: (425) 483-9134 Far: (425) 486-2746 Vehicle Hrs on Site Hrs Charged Visitors 1.25 Project Job LocaTu"con- Client Chang Residence 17134 Talbot Road, Edmonds Jackie Chang General Contractor General Contractor Proj. Manager Received Unchecked By Aziz Aziz Earthwork Contractor Earthwork Contractor Supt. Received Checked By Bedrock Group,Inc. At the request of Dr_ Chang, I come on site to observe condition of the site, as a complaint had been made to City of Edmonds concerning loose soil deposited along the north boundary of the project site which could be washed onto the neighboring property by storm runoff. It appears that most of the soil excavated out from building footprint excavation is stockpiled at the east end of the project site. Minor amount of loose soil, mostly not more than a foot high, has been placed along the boundary line of the site. The ground within the project site slopes down to the southwest, away from the north boundary of the site. Also, the surficial soil of the site is gravelly sand which allows stormwater to seep through very easily, and there are no signs ......... I . - of soil erosion within the site. Therefore, it is unlikely that soil can be washed by storm runoff onto the neighboring property to the north. Nevertheless, I have instructed Aziz the contractor, to remove the loose soil along the north boundary and dump it onto the stockpile at the east end of the site and that cover the entire soil stockpile with plastic tarp securely held down with weights. a m: ,1NA h - - —� — ........ .... ... ..._.. e ol)v to: Continued 1) Jackie Chang 2) City of Edmonds onNext 3) Aziz 4) Parrp