Liu Geotech Report 12.12.13.pdfBedrock Group,Inc.
At the request of Aziz, I crime onsite to meet with him to discuss disposal of water in footing drain and construction
of spreader pipe dispersion systems for roof runoff. The project site is underlain by gravel sand soil of high .
permeability. Therefore, water collected into footing drain of the residence will be inconsequential if any at all.
Therefore, it won't require a large system to dispose water in footing drain. I inform Aziz that a 2 feet x 2 feet x 3
feet deep drywell pit off each corner of the house will be sufficient to handle water in footing drain. The drywell
should be filled with clean 314 to 1-112 inch washed gravel to within about 10 to 12 inches of the top. The gravel fill
should be covered with a layer of non -woven filter fabric and the remainder drywells then filled with onsite clean sandy
. .........
soil. The footing drain should be tightlined to drain water into the gravel fill of the drywells.
Aziz covers the storm inlet at the end of the paved joint -use driveway with a filter sock. -.
w
Uopv to: __ ...._
Continued'
1) Jackie Chang 2) City of Edmonds on Next
3) Aziz 4) 1 Paae
Edmonds
Permit No. BLQ20130190
U & ASSOCIATES.INC.
70=0 iePep.
12-083 J. Liu
age epo o.
1 of 1 6
. Geotechnical Engineering, Engineering Geology �;arth Science
ti0es
Time OrSitehate
lay of week
32
10:30:A
12/12/2013 Thar.
19213 Kenlake Place NE
Travel Time (Hrs)
Time off Site
weather
Kenmore, Washington 98028
(}.75
11:OOA
Cloud
Phone: (425) 483-9134 Fax: (425) 486-2746
Vehicle Hrs on Site Hrs Charged
Visitors
1.25rode
o calion
ien
Chang Residence 17134 Talbot
Road, Edmonds
Jackie Chan
General Contractor
General Contractor Proi. Manager
'Received Unchecked By
Aziz
Aziz
Bedrock Group,Inc.
At the request of Aziz, I crime onsite to meet with him to discuss disposal of water in footing drain and construction
of spreader pipe dispersion systems for roof runoff. The project site is underlain by gravel sand soil of high .
permeability. Therefore, water collected into footing drain of the residence will be inconsequential if any at all.
Therefore, it won't require a large system to dispose water in footing drain. I inform Aziz that a 2 feet x 2 feet x 3
feet deep drywell pit off each corner of the house will be sufficient to handle water in footing drain. The drywell
should be filled with clean 314 to 1-112 inch washed gravel to within about 10 to 12 inches of the top. The gravel fill
should be covered with a layer of non -woven filter fabric and the remainder drywells then filled with onsite clean sandy
. .........
soil. The footing drain should be tightlined to drain water into the gravel fill of the drywells.
Aziz covers the storm inlet at the end of the paved joint -use driveway with a filter sock. -.
w
Uopv to: __ ...._
Continued'
1) Jackie Chang 2) City of Edmonds on Next